Post Job Free

Resume

Sign in

Electrical Engineer Power Plant

Location:
Worland, WY
Salary:
000
Posted:
December 29, 2021

Contact this candidate

Resume:

CONTACT DETAILS Serge Borisov

Spain, Torrevieja

+994*********; +346******** (WhatsApp) and (imo) as well. adprto@r.postjobfree.com

https://www.linkedin.com/in/serj-borisov-18294152

PROFESSIONAL

PROFILE:

Summary worked in Oil and gas industry in Caspian Sea, UAE, Oman, India, Kazakhstan, Kyrgyzstan, Russia, South Korea, and LNG Vessel new building, Vietnam, Angola and Brazil on Semi Sub, Jack Up, Drillship, artificial islands offshore UAE and Land rigs .Projects and design.

. Commissioning, Installation, and Troubleshooting of Drilling Equipment from Top Drives Draw work Rotary Tables Iron Roughnecks Mud pumps, Hydraulic Power Units, Hydraulic winches, Cathead Controls, VFD's SCR's. Familiar with Siemens Step 7 and several other software application used for Cyber Drilling Apps.Allen-Bradley Programmable Logic Controller (PLC). Lock out Tag out systems work permits and team meetings prior to starting any jobs Safety first. Instrumentation Skills: Work with 4-20 MA Transducers Temperature Sensors Proxy Switches and Encoders. Occupational training:

BOSIET, PTW-L1, PTW-L2, EI-E, EI-P, TRA, H2S MH EQUIPMENT for the West Azeri Platform (7 certificates), Introduction course, Control system course, Hydraulic system course, Sequence operational course, Human-machine-interface, COMP-EX 01-04, TRIC system awareness, STOP awareness, Industrial hygiene, Industrial hygiene, Manual Handling awareness, COSHH awareness, Environmental awareness, Hazard awareness, Working at High, ABS Welding Inspection, ABS New construction surveyor, Swagelok, Moody Intertek certificates (6 each). Safe use of abrasive Wheels, First Aid Training, Flammable and toxic gas detection certificate, Catholic protection installation, maintenance and inspection, Self regulations of heat tracing cables, Hawke Installations and inspection ATEX/IECEx glands. Education:

1984-1988 Baku Power Technical College

Qualification: Technic-electro mechanic

1989-1996 Azerbaijan State Oil Academy

Specialization: Electric drive and automatization of Industrial equipment and technological

Qualification: Electrical engineer

Summary of software:

Windows 10, /I, MS Office 2013, Siemens step S7-300/400,1200/1500 PLSs, AutoCAD, Opercom, SCADA, CMMS, Maximo and ETAP Software: Starfix NG as well. Auto-cad, 2D, 3D modeling, AVERA, PDMS/ESD PDS2000 Hydrographic Software. Micro Station, SP3D and PDS.

Languages:

Russian, English and Azeri (Turk)

CARRIER HISTORY:

Period: November 2017-

December 2020

Period: September 2014 -

October 2016.

Keppel Singmarine. Pte.Ltd. Baku shipyard. Senior E&I project engineer.(Senior LOTO coordinator/ controller). BP Shah Deniz 2 construction project. Subsea and completions of Control job. Installation,operation and maintenance on Wellheads BOP and Xmas. Current project:

DP-3 Subsea vessel. (Khankendi)

Fact-O-Rig. Senior rig auditor. Inspection engineer. UAE, Abu Dhabi.

Responsibility: Audit and inspection of drilling equipment,certification,HSE staff, firefighting equipment, BOP, lifting equipment, testing, Check a competencies of drilling crew as per Company request.

Installation and commissioning.

Projects: Al Yasat conventional jack-up rig GPC shipyard Abu Dhabi, IRAP project. ADMA-OPCO-NDC 3000HP land rigs: #79,# 80 on Offshore SARB South artificial island.

Audit and final barge acceptance report of “Shamal”jack up barge. Technical investigation report of PLC temperature rising issue of

“Lulwa”jack up barge. NDT and Welding inspection, Dimensional and Control inspection. PCN or ASNT Level 2 in Ultrasonic, MPI, DPI, ECT Radiography as well. Explosion proof equipment survey on ZADCO-NDC Rig 66 South artificial island. Explosion proof equipment survey on ZADCO-NDC Rig 33 Central Artificial island. Audit and final rig acceptance report of IRAP project. ADMA-OPCO-NDC 3000HP land Rig 78 on offshore SARB North artificial island.

Period: January2014-May

2014

Shelf drilling Inc. Project E&I engineer

UAE- United Arab Emirates.

Responsibility: Preparation and executing Electrical and Instrumentation SOW(scope of work)to upgrade Jack Up rigs.

Completed projects: Trident14 and Key Singapore Jack Up`s rigs upgrade projects. Period: November2012 –

January 2014

E&I commissioning start up engineer. DSME shipyard South Korea .EPCS. project. Exxon-Mobil-Parker drilling- Sachalin1”BERKUT” six generation (platform, arctic design for extremely cold temperature (-40degree) project . Platform to be installed on Sakhalin Island –Russia. Period: November 2010-

October2012

Surveyor.ABS.- American Bureau of Shipping.

South Korea,DSME. Daewoo shipyard. Petroserv ultra deep water drillship

”Carolina”& Odebrecht deep water drill ships “Norbe 8” and “Norbe9” projects. LNG Vessel projects: Experience on testing and operation on new buiding with fuel marine engine, Slow speed, Medium speed engines, machinery engineering testing, ETO testing and operation experience. LNG Bunkering Vessel on Samsung shipyard .Balast Water Treatment system installation and commissioning (BWTS) UV& EC Type,Open and Closed Loop Scrubbers.

Period: December 2009-

October 2010

North of Kyrgyzstan.

EPC project .Commissioning Electrical engineer.Refinery petrochemicals. RO and Wastewater treatment plants RO desalination project. Drive technology (frequency converter, smooth start-up, direct start-up …) Lighting planning

Dimensioning the power supply -Emergency power systems (EPS) and uninterruptible power supplies (UPS) HVAC system.

Transformer stations LV& MV switchgear, Instrumentation. Medium- and low-voltage switchgear

Electrical heating and/or trace heating

Energy management

Grounding, lightning protection and equipotential bonding Cable line planning and cable sizing (voltage drop, grounding conditions …) Short circuit calculation etc.

Period:April2008-August

2008

Period:August2007-

April2008

Schlumberger Chief Electrician. Land rig .Rig 91 Sultanate of Oman. Equipment: Oil Field-Electric-Marine (OEM) SCR systems, Mud pumps-Oil Well. Caterpillar generator model-3512, 1400kva, 980kw.

Parker Drilling Company

Position: Chief - SCR electrician. Land rig 258, Type-Parco, cantilever, Aksai, Kazakhstan.

Period:September2004-

August2007

Period:October2002-

September2004

Period:1996-2002

Period:May1989-

October1996

KCADeautag: Rig electrician on the West Azeri cyber platform Temporary worked on the Central Azeri cyber platform Temporary worked on the Shah Denis Alpha cyber platform (jack up) Hyatt Hotels Baku: Position: Duty engineer.

Offshore exploration drilling and construction company – SOCAR: Position: Senior Electrical engineer. SOCAR

Power plant Sangachal construction project.

Responsibility: Coordinate implementation of new projects with operations and maintenance ensuring full communication with all relevant discipline. Technical support during Plant shutdown, HVAC system, GIS substation maintenance. Develop Risk Based Inspection Plan and carry out regular inspections of Electrical equipment and schematics to ensure reliability and availability. Trouble shoot plant electrical problems, suggest feasible short and long term solution.

Offshorere exploration drilling company – SOCAR

Position: Senior electrician on the semi-subs and jack up. From 05/1989 to 10/1991 grade 4 electricians on the jack-up rig in Caspian Sea. Rigs: Caspi1, Caspi2, Astra.

From 10/1991 to 08/1996-senior electrician on the jack- up rig in Caspian Sea Rigs: Caspi1, Caspi2,

Additional Information:

Ability to work proactive independently under challenging timescale towards project achievement. A self motivated & result oriented individual aiming to work in a reputable company. Interested to work in a reputable and well organized Company their require goal of excellence in the field of Safety, Quality & Productivity by applying the experience and knowledge that was gained from previous employments implementing knowledge ISO 9001:2000,NEC,IEEE,IEC, codes and standards.



Contact this candidate