CURRICULAM VITAE
VINOTH KUMAR TAMILARASAN Mobile No: +91-959*******
DRAFTSMAN ********@*****.***
career objective
Over 15 years of experience as a Draftsman plus Field Drafter. Over seven years of PDS modeling and three years in Spoolgen and SP3D piping, equipment & facilities design and detail engineering. Field walk through to surveying, construction supports and As-Built activities in both onshore sites and offshore platforms.
area of expertise
oPreparation of General Arrangements, Equipment layout, Piping layout and Piping Plans
oPreparation of Fabrication shop Piping drawing and Support drawing
oPreparation of Preliminary, intermediate, final MTO, Line list, Valve list, Special item list etc.
oModeling of Piping & Equipment Layout in 3D software’s SP3D & PDS
oPreparation of detailed tie-in lists with field change notes complies with company policies and procedures
oChecking vendor shop drawings & construction drgs with appropriate responsible supervisors & engineers
oModeling Logical support marking in the model as per As-Built conditions & Generation of Piping Isometric
oPreparation of Equipment Nozzle orientation drawings and Section Details
work experience
Organization : Archirodon Group N.V. UAE December 2020 – May 2021
Designation : Draftsman
Client : ADNOC-Onshore, Abu Dhabi Company for Onshore Petroleum Operations LTD.
Project Brief : EPC for BAB 485 MBD Sustainable Facilities Project
Job Involvement : Preparation for Piping Shop Isometric drawings by Spoolgen
: Checking the spoolgen output spooled by subcontractor
: Updating Detail design changes to existing IDF files, from revised design isometrics
Including addition of new material and removal of obsolete material
: Checking the welding details and prepare weld summary and Material take off
: Review of Project specification and P&IDs, PDS-based piping layout and isometrics.
Organization : TechnipFMC, Chennai, India February 2020 – November 2020
Designation : Draftsman
Project’s Brief : Artic NLG-2, Novatek, Russia & Long Son Petrochemicals, Vietnam
Job Involvement : Preparation and checking for Piping Shop Isometric drawings by Spoolgen
: Revising Isometric drawings with Client design revision drawings
: Preparation and checking the Above Ground and Under Ground piping isometrics as
per the shop fabrication requirement. Extraction, Reviewing of MTO & WSL Reports
: Updating the comments in drawing as per the site requirement – As Built Drawings
Organization : Saipem S.p.A - Jandig-S LLC, Kazakhstan May 2017 – October 2019
Designation : Draftsman
Client : TCO –Tengizchevroil LLP, Kazakhstan
Project Brief : FGP / WPMP- Future Growth Project / Wellhead Pressure Management Project
Job Involvement : Preparation for Piping Shop Isometric drawings by Spoolgen
: Revising Isometric drawings with Client design revision drawings
: Checking of Shop Isometric drawings from sub-contractor
: Preparation of Piping Layout & Preparation of Pipe Support Cutting details
: Preparation of Snap shots from Navis Work and Submission to PPC/Construction
Organization : Saipem S.p.A - ERSAI Caspian Contractor LLC, Kazakhstan
Designation : Sr. Draftsman - GPS 952177
Period : May 2011 – April 2017
Projects Involved & Nature of Work:
Client : NCOC N.V., Kazakhstan
Project Brief : Topsides for EP Clusters 2& 3 - AGIP KCO
Job Involvement : Preparation for Shop Isometric drawings by Spoolgen
: Extraction MTO & WSL Report
Client : Teniz Burgylau LLP, Kazakhstan
Project Brief : JUDR- Jack-up Drilling Rig (Mobile offshore drilling unit)- Keppel FELS, Singapore
Job Involvement : Preparation for Shop Isometric drawings & Supports drawings by Block wise.
: Prepare of field piping system test packages, including system limit on P&ID & Iso.
Client : KC Kazakh Panama S.A
Project Brief : Zhambyl Submergible Drilling Rig (Hull No.3029)
Consultant : DSME-Daewoo Ship building & Marine Engineering
Job Involvement : Preparation of Engineering Field Instruction & Additional Work Orders
. Preparation of Missing Supports drawings & Coordinate with other disciplines
: Site survey and modification of drawings due to clashes of pipe.
Client : Lukoil, N. America
Project Brief : Filanovsky - TMB - Upgrading Barge Works - Saipem S.p.A.
Job Involvement : Preparation of P&ID for Fuel Oil System, Fresh Water System, Firefighting System & Sewage Water System.
: Modeling of Piping Layout in PDS for all Systems and Extraction of Isometrics.
: Preparation of Isometric shop drawings & Final MTO for Fuel oil system,
Fuel Drainage system, Firefighting System & Sewage system
: Preparation of Supports details and MTO
Client : Saipem S.p.A.
Project Brief : Castoro 12 & 16 Upgrading Barge - NCSC
Job Involvement : Interconnections of Piping from Existing to New Accommodation block for Fresh water System, Fuel oil system, Fire Water Sprinkler & Compressed air Systems.
: Preparation of Piping Isometric and Supports details with MTO.
Yard Investment Projects:
: Barge Fuel Pumping Station, Compressed Air Station
: Sewage Treatment Plant Development & Mechanical Testing Laboratory
Reference standards : ROK - Republic of Kazakhstan Regulations
: GOST - Russian Standard Codes
Job Involvement in : Preparation of P&ID & PFD, Equipment Layout, Piping layout & Support layout
Yard Investment : Preparation of Shop Isometric drawings, Support Details & MTO
: Preparation of fire water, service water and sewage - section & details
: Preparation of Piping Layout for supply of fuel from fuel supply trucks to fuel
Storage tanks, from storage tanks to barges.
: Preparation of Underground piping layout for interconnection of the Fuel
: Pumping Station to West Jetty – HDPE Pipes
: Preparation of Piping supports for above ground piping
: Preparation of Architectural Plan, Sections & Elevation Details
Organization : Alpan consulting Engineers Pvt.ltd .Chennai, India
Designation : Draftsman
Period : Aug 2010 – April 2011&May 2009 – April 2010
Job Involvement : Modeled equipment and designed piping systems above and below ground
: Design review models for clash detection & alternate routings
: Isometric drawings preparation / Extraction in PDS
: Calculation of Pipe Rack & Pipe space on racks
: Modification of Supports, ladder with cage & Platforms
: Created Flow Sheets, Line List, Plot Plans & Ordering Materials
: Checked Piping Plans, Elevations & Isometrics
: Revised equipment in equipment modeler using PDS, according to Vendor data’s
Organization : Emirates Industrial Laboratory, Abu Dhabi
Designation : Draftsman
Period : May 2010– July 2010 (Short Term – Service Visa)
Project & Client : Zakum Field - Offshore, ADMA - Abu Dhabi Marine Operation Company.
Job Involvement : Shop Isometric drawing preparation by AutoCAD
: Drafting structural and supports drawings in Auto Cad
: Field assignment to assist in solving of major design issues
: Generated and updated technical drawings
: Organized and maintained files for all facilities and project documentation
Organization : Saudi Engineering Group International. Saudi Arabia
Designation : Draftsman April 2008 - April 2009
Client : Saudi Aramco, Saudi Arabia
Project : Gas Treat & Compression Facilities, Hawiyah NGL - Recovery Plant, S. Arabia
Consult : Snamprogetti, Italy
Job Involvement : Piping Modeling as per As Built conditions
: Preparation of OSI Circuit
: Piping Isometric for Misc modification jobs
: Preparation of Piping Plan Layout
Project & Client : Khursaniyah Gas Plant - KGP Project Jubail, Saudi Aramco, Saudi Arabia
Consult : BTJV - Bechtel Technip Joint Venture, Technip Italy
Job Involvement : Preparation of Field Revision Notice & Field Change Notice
: Coordinated with Field Engineers and interpreted drawings
: Support Modification and installation process.
: Performed regular updates on quantity tracking applications and formulated
weekly reports for installed pipelines.
Organization : Alpan consulting Engineers Pvt.ltd .Chennai, India
Designation : Draftsman Dec 2005 – April 2008
Client : Nuclear Power Plant, Kalpakkam, Government of India
Project : IGCAR - Indira Gandhi Centre for Atomic Research
Job Involvement : Piping & Equipment Modeling. Generation of Piping Isometric using Iso module
: Preparation of GAD & Preparation of Equipment Nozzle orientation drawings
Project &Client : NEC – EL, Fasher Power Station, Powerica Limited, South Africa,
Job Involvement : Piping modeling for 3x3.235 MW captive power plant
: Preparation of Piping Isometric & Preparation of Piping Plan drawings
Project & Client : 2x55MW Captive Power Plant, Ispat Energy limited
Job Involvement : Preparation & Generation of Piping Isometric & MTO
. Preparation of General Arrangement Drawings
Organization : Sri Sarbathi Steel Tubes ltd. Pondicherry, India
Designation : QC - Supervisor
Period : Dec 2003 – Nov 2005
Job Involvement : Inspection of Cold Pipes welding and Preparation of weld plan
: Inspection on materials with test certificate as per the requirements
: Inspection of Hardness, Surface Preparation and painting
: Preparation of final quality dossiers / test packs in timely matter project deadlines.
: Witnessing of Hydro test and assisting in final commissioning activities.
Organization : BHEL - Bharat Heavy Electricals Limited, Trichy, India
Department : Quality Control – Piping
Designation : Technical Apprentice
Period : Oct. 2002 to Oct. 2003
Job Involvement : Inspected Pressure parts Tubes & Pipes like urnel walls, Water wall panel,
Super heater & Reheater coil etc.
: Inspection by Portable Metal Hardness Testing method, Visual weld inspection &
Liquid dye penetrate testing method.
: Preparation of inspection & test reports and compilation of quality dossier.
Organization : Rasab Engineering Works, Trichy, India
Designation : Supervisor - Fabrication & Production
Period : 15th June 2001 to 10th Sep. 2002
Job Involvement : Manufacturing Windmill towers and internal fittings done as per drawings.
: Responsible for achieving production requirements, specifications, and work orders.
: Oversaw the production process and managed the production schedule.
software skills
. Smart Plant -SP3D Ver.2014_R1
. Plant Design System PDS -3D Modeling 7.02, 8.0
. Smart Plant Spoolgen 2014_R1
. Intergraph Micro station 7.1 /7.1J
. Auto Cad 2004, 2008 & 2014
. Smart Plant Review Software
. Navis Plant Review software
personal profile
Position : DRAFTSMAN
Name : T. VINOTH KUMAR
COVID Vaccination : Sinopharm BBIBP - CorV (Vero Cells) 2 Dose taken in UAE
Nationality : Indian
Passport no : T9864161 (Issue Date: 25/10/2019 – Expires Date: 24/10/2029)
Technical Qualification Diploma in Mechanical Engineering
Name of the Institute : Dhanalakshmi Srinivasan Polytechnic, Perambulur. (1998 to 2001)
Address for : NO: 15/27, ALC Campus, Cuddalore - 607001, Tamil Nadu - India
Communication Email: ********@*****.*** Mobile: +91-959*******-WhatsApp
declaration
I hereby declare that the above information’s are true to the best of my knowledge.
Date : Yours Truly
Place : Chennai, India (T. Vinoth Kumar)