Post Job Free

Resume

Sign in

Planner / Scheduler

Location:
Corpus Christi, TX
Posted:
December 22, 2021

Contact this candidate

Resume:

THOMAS G. TINGLE

**** ****** *****

Corpus Christi. TX

361-***-**** cell

adppvk@r.postjobfree.com

EDUCATION: High School: Hammond High School 1977 – 1981

College: Southeastern Louisiana University 1980 - 1981

SUMMARY OF EXPERIENCE:

Twenty (20) plus years of construction and Project Management experience. Subcontract Coordination, develop and maintain detailed resource loaded Capital Projects and Turnaround Schedules for multiple projects. Develop and maintain scope of work for Major Turnarounds, Capital Projects and New Construction Projects. Maintain and track all Planning/Scheduling and Cost Control activities for multiple projects & New Construction Projects. Develop manpower curves and project reports from resource loaded project schedules. Develop work breakdown structure (WBS) from scope of work to track progress and cost for projects. Field Superintendent on various Capital Projects & New Construction Projects. Performed estimates from Scopes and maintained ongoing estimates for Change Orders during ongoing projects.

PROJECT TYPES ACTIVITIES

Distillery Safety

Chemical Plants Project Management

Gas Plants Project Supervision

Ethylene Estimating

Crude Units Scheduling

Cat Crackers Design

Hydro Crackers Subcontract Coordination Alky Units

HDA Units

BTX Units SKILLS

Offshore Platforms Primavera (P6)

HDS Units SAP

Vacuum Units Microsoft Project

Sulfur Plants Microsoft Word

Aviation Industry Excel

Boilers/Turbines

PROFESSIONAL EXPERIENCE:

• KAP Project Services – 11/2020 – present BASF Bishop, TX

Logistics Coordinator for Maintenance T/A & small capital projects responsible for ensuring that all logistics and infrastructure activities including material management to support the T/A

• KAP Project Services – 06/19 – 05/2020 – Celanese Bishop, TX

Lead Scheduler for Maintenance T/A Responsible for building resource loaded schedules, creating budgets, manpower reports and FCN’s (Field Change Notices) for Maintenance T/A & Capital Projects

• Jacobs Engineering 10/18 – 05/19 – Lyondell/Basel Corpus Christi, TX

Project Controls Manager – Providing Project support (P6 Schedules, Estimates, Weekly Cost Reports, supervising the field work) for Small Capital Projects Group

• Turner Industries 02/16 – 03/18 Flint Hills Resources, Citgo, Oxy

Project Controls Manager – Managing all aspects of the Project Controls group consisting of P6 Schedules, Estimates, Weekly Cost Reports and document control in the Corpus Christi main office

• KAP Project Services – 05/14 – 01/16 Flint Hills Resources

Planner/Scheduler for Maintenance Refinery T/A’s Responsible for building resource loaded schedules, creating budgets, manpower reports and FCN’s (Field Change Notices) for all Maintenance T/A’s

• ZACHRY 12/13 – 05/14 Citgo Refinery Corpus Christi, TX

Planner/Scheduler for Maintenance Refinery T/A’s Responsible for building resource loaded schedules, creating budgets, manpower reports and FCN’s (Field Change Notices) for all Maintenance T/A’s.

• Polaris Engineering - 9/12 to 6/13 Captain Morgan Rum Distillery (DIAGEO)

Construction Manager for LPG & Cogen Project for Diageo USVI $18,000,000. – Responsible for all field activities (civil, structural, mechanical, I & E, Boiler & Turbine) for the entire capital project this included building schedule, overseeing all procurement of equipment and materials, installation of all major equipment

• Antillean Engineers Inc VI 08/09 to 9/10 Captain Morgan Rum Distillery (DIAGEO)

Site Supt. / Coordinator Diageo USVI (Captain Morgan Rum) for Barrel Warehouse, Distillery and Molasses Tank areas $185,000,000. Responsible for all field activities (civil, structural, mechanical, I & E) for the entire capital project this included building schedule, coordinating between separate contracts and contractors for the different scope of work.

• Wyatt VI St. Croix VI 01/08 to 08/09 Hovensa St Croix USVI

Planner/Scheduler/Estimator/Subcontract Coordinator for Base Refinery T/A’s up to $6,000,000 Responsible for building resource loaded schedules, creating budgets, manpower reports and FCN’s (Field Change Notices) for all Maintenance T/A’s.

• ENGlobal St. Croix VI 11/07 to 01/08 Hovensa St Croix USVI

Planner/Scheduler/Estimator/Subcontract Coordinator for Base Refinery T/A’s up to $6,000,000 Responsible for building resource loaded schedules, creating budgets, manpower reports and FCN’s (Field Change Notices) for all Maintenance T/A’s.

• KAP Project Services St. Croix VI 05/06 to 11/07 Hovensa St Croix USVI

Planner/Scheduler/Estimator/Subcontract Coordinator for Base Refinery T/A’s up to $110,000,000. Responsible for building resource loaded schedules, creating budgets, manpower reports and FCN’s (Field Change Notices) for all Maintenance T/A’s.

• Jacobs Engineering, Houston, TX 12/05 to 05/06 Flint Hills Resources Corpus Christi, TX Planner/Scheduler/Cost Control for Coke Drum Replacement Project (New Construction) for Flint Hills Resources up to $175,000,000.00. Responsible for building a EPC manpower loaded schedule by systems to maintain the project. Worked very closely with the engineering firm to develop a combined engineering and construction schedule.

• CB&I-Howe Baker, Houston, TX 04/05 to 12/05 Valero Houston, TX

Planner/Scheduler/Cost Control for Global Project Controls for multiple Modular Units, Valero Houston. Responsible for building manpower loaded schedules for Modular Unit installation and connection of these units in the refinery.

• Comforce LLC, Everett, WA 03/05 to 08/05 Boeing Seattle, WA

Planner/Scheduler/Cost Control for Aerospace Industry 787 Dreamliner Project for Boeing. One of many Project Controls Analyst responsible for a portion of the project that was conceptual scheduling for the fiber optics of this project.

• Beragaila & Associates, Anchorage, AK 10/04 to 03/05 ConocoPhilipps

Planner/Scheduler/Cost Control for multiple Capital Projects for NANA/Colt Engineering, LLC(ConocoPhilipps). Responsible for building manpower loaded schedules and creating budgets for multiple projects on the North Slope of Alaska.

• H.B. Zachry, Psacagoula, MI – 07/04 to 10/04 Chevron

Planner/Scheduler/Cost Control for Capital & Maintenance Turnaround for Hydrogen Unit and a Gas Turbine. Responsible for building a manpower loaded schedule and budget for a major T/A of the Hydrogen Unit.

• Universal Personnel, St. Croix VI – 04/04 to 06/04 Hovensa St Croix USVI

Capital Projects Planner for Low Sulfur Diesel and Waste Water Project

• Fishbone Solutions LLC, Corpus Christi, TX - 03/03 to 02/04 Flint Hills Resources, Citgo Construction Coordinator - Compiling Scopes and Coordination of contractors at various refineries and chemical plants for Multi Unit T/A’s.

• Koch Specialty Plant Services, Corpus Christi, TX - 03/02 to 03/03 Flint Hills Resources

Planner/Estimator/Projects Control - Subcontract coordination for turnaround projects.

• Repcon, Inc., Corpus Christi, TX - 03/01 to 03/02 Flint Hills Resources, Valero, Shell

Planner/Estimator/Projects Control - Coordination for both capital and turnaround projects. Projects range from capital improvements to large complex turnaround revamps. Responsible for building manpower loaded schedules and estimates, procuring all materials and subcontractors to perform the T/A’s in various refineries and chemical plants across the country.

• Bergalia & Associates, LCR, Pasadena, TX - 7/00 to 03/01 Lyondell-Citgo Pasadena, TX

Planning, Scheduling & Cost Control for all small capital & maintenance projects at Lyondell-Citgo Refinery & Offsite Piping for Calpine Cogeneration Plant.

• H.B. Zachry, Tenaska Cogeneration Plant, Franklin, GA - 4/00 to 7/00

Project Controls Manager - Scheduling, cost control and document control for $285MM project.

• Becon / Bechtel, Gregory Power Plant, Gregory, TX - 8/99 to 4/00

Engineering Technician - Managed three week look-ahead schedule, all back charges and cost reporting on $250MM project.

• Mohawk Field Services, Formosa Plastics, Point Comfort, TX - 1/99 to 8/99

Planner - Completed project schedules, procured materials, interfaced between subcontractors and client on $15MM project on major Heater expansion project.

• Flour - Daniel, Koch Refinery, Corpus Christi, TX - 7/98 to 1/99

Planner/Scheduler for small capital and maintenance projects.

• Bay Ltd., Corpus Christi, TX - 5/97 to 7/98

Planner - Developed schedules for offshore platforms, modular skid units on offshore projects, T/A’s and New construction at various refineries and chemical plants. Project sizes ranged from $500K to $45MM.

• CDI Engineering Group, Hoechst-Celanese, Bishop, TX - 12/96 to 5/97

Draftsman/Designer - Developed routing for new & existing piping, upgraded orthographic and P&ID’s.

• Onyx Engineering, Corpus Christi, TX - 5/96 to 12/96

Project Controls - Planning, Scheduling and Estimating for various clients from engineering to construction

• Chemstress Consultant Company, Houston, TX - 1/95 to 5/96

Piping Designer - Designed, developed new piping isometric, orthographic and P&ID’s.

• Harmony Construction Corporation, Air Products, Deer Park, TX - 1/95 to 7/95

Planner/Scheduler/Estimator/Field Engineer

• Brown & Root Industrial Service, Occidental Chemical, Deer Park, TX - 9/94 to 12/94

Draftsman - Responsible for all small capital and maintenance isometrics (new lines and replacement lines in all units of plant).

• Jacobs Engineering Group, Arco Chemical, Channelview, TX - 4/94 to 9/94

Planner/Scheduler – Responsible for EPA PSV replacement project for POSM I/II units.

• Wyatt Field Services Company, Houston, TX - 7/93 to 2/94

Job Superintendent - Responsibilities for new construction, turnarounds, Boiler and Tank projects. Projects ranged from $750K - $25MM.

• Harmony Construction Corporation, Exxon Chemical, Baton Rouge, LA - 11/92 to 7/93

Field Engineer - Complete progress updating, red line drawings, bar charts for progress and cost control for Eagle-Lion project.

• H.B. Zachry, Phillips 66, Pasadena, TX - 7/92 to 10/92

Construction Coordinator for Civil/Structural Department instrumental in rebuilding of the plant.

• Belmont Constructors, Exxon Chemical, Baytown, TX - 2/92 to 7/92

Assistant Project Manager/Planner/Scheduler for NAPTHA project - new construction.

• Harmony Construction Corporation, Houston, TX - 6/82 to 2/92

Superintendent/Planner/Scheduler/Estimator at various locations nationwide & worldwide.

References upon request



Contact this candidate