PROFILE SUMMARY:
Result oriented Electrical Engineer with 8.3 years of work experience in Project execution, Site management & Project management. As a dynamic professional I have worked on MEP Construction, Infrastructure and Power plant projects of international standards with Client as well as Contractor. I am well versed with construction procedures & methodologies. ACADEMIC CREDENTIALS:
Bachelor of Electrical Engineering (B.E)
Anjuman College of Engineering and Technology, RTM University Nagpur, India, 2009. COMPUTER SKILLS:
• AutoCAD,
• MS Office(Excel,Word) and Internet surfing.
TOTAL EXPERIENCE: 8.3 Years (MEP Projects in Gulf - 5.3 Years + Power Plant in India - 3 Years ) EMPLOYMENT HISTORY:
Worked in Rima Services Trading & Cont. L.L.C. Oman as a “Site Electrical Engineer” from December 2016 to August 2019.
Worked in Berge Qatar Construction W.L.L. Qatar as a “Site Electrical Engineer” from February 2016 to August 2016.
Worked in Al Manawir Trading L.L.C. Oman as a “Site Electrical Engineer” from November 2012 to November 2014.
Worked in Janani Enterprises Pvt Ltd. India as a “Site Electrical Engineer”, from July 2009 to August 2012.
JOB RESPONSIBILITIES:
• Installation,Testing and Commissioning of Transformer, LV Panel, APFC Panel, LT Motors, MDB, SMDB, RFDB, DB,MCC & Other control panels, Small power and lighting system.
• Supervisionof different types of cables laying, glanding & termination of MV& LV cable,
• Testing of MV Cable like IR, HI POT, Continuity.
• Installation of cable tray, ladder and Trunking.
• Knowledge of Cable sizing calculation for DB, SMDB, MCC board, transformer, capacitor bank and motors.
• Supervision of Fire alarm system and ELV system installation.
• Project coordination with civil, electrical, HVAC, firefighting and other services for the smooth running of project.
• Installation of lightning & Earthing protection system.
• Installation,Testing and Commissioning of Plumbing system like (Water supply, Drainage system, pumps and all saniatary fixture as per specification and standard).
• Erection, Testing, Commissioning & Maintenance of various Transformer and Reactor.
• Erection of Tranformer like 82 MVA, 270 MVA,Reactor 63 MVAR (Single phase & Three phase) at site.
• Erection of 400kV Class OIP & SF6, HV & LV bushing, Erection of Radiator, Cooler Bank, Tap Changer On Load, Off Load, Bucholz relay,SPR,OFI & other Accessories.
• Oil filtration,BDV check and Oil topup in transformer at site.
• Testing of 400kV Class Bushing, Instrument Transformer, CT Testing,Transformer Winding (HV&LV). Created with
PDFBear.com
• Commissioning of Generator Transformer, Distribution Transformer, Converter Transformer, and Reactor at various sites up to 300 MVA.
• Maintenance of Generator Transformer, Distribution Transformer & Reactor, Replacement of Gasket, 400kV HV Bushing, LV Bushing, Tap changer.
• Responsible in reviewing all field construction activities, installation of field lighting, lighting panel,cable pulling termination and installation of all field electrical equipment.
• Lighting & small power design, calculation and preparation of single line diagram and layout.
• Manages projects within an established budget and sequence of activities.
• Proven track record in Project Planning, Management & Execution. Fair knowledge in quality assurance, quality control, review and final project delivery.
• Expertise in approved electrical engineering drawings, review drawings of wiring installation.
• To raise of TQs/RFI to client /consultant inspector in order to assure the construction process.
• Preparation of MAS and obtaining client and consultant approval.
• Reviewing material status reports, analyzing notes of items being delayed, preparing comments & submitting them to the concerned superintendent as well as Quantity Surveyor
• Attending progress meeting for quick finalization of the project, Progress reports, Meeting with engineers’ team and attend meeting with suppliers, subcontractors & Client, Raise the issues, clarifications and found the solutions.
• Preparation of daily and weekly progress report for the project.
• Reviewing the estimate of physical completion percentages.
• Queries and complaints handling.
• Preparation of monthly invoice and getting approval from consultant / main contractor.
• Coordinating with Architect’s / Consultant’s representative if any queries / doubts in the specifications
/ designs.
• Responsible for detailed electrical design of all the projects according to client’s standard and specifications including load calculation & estimation.
• Preparation of DB schedule.
• As Built Drawings.
PROJECT HANDLED:
Project Name : Residential & Commercial Building At Azaiba, Oman Position : Site Electrical Engineer
Client Name : Faiq Dawood Allawati
Cosultant : Lions and Vision L.L.C. Oman
--
Project Name : Finnish School German University At Halban, Oman. Position : Site Electrical Engineer
Client Name : Oman Educational Services L.L.C. Oman Cosultant : Hoehler + Al Samlmy L.L.C.
Project Name : Refurbishment of AL Haditha Petroleum services Camp at Wadilatham, Oman Position : Site Electrical Engineer
Client Name : Al Haditha Petroleum Services SAOC – Oman Consultant : Occidential Oman L.L.C.
Created with
PDFBear.com
Project Name : Construction of Transformer factory at Rusayl Industrial Estate, Oman Position : Site Electrical Engineer
Client Name : Federal Transformer And Switchgears L.L.C. Oman Consultant : Semac and Partners L.L.C. Oman
Project Name : Logistics Hub at Bu Sulba, Qatar
Position : Site Electrical Engineer
Client Name : Gulf Warehousing Company
Consultant : Qatar Design Consortium W.L.L.
Project Name : Soldiers Accomodation at Halban, Oman. Position : Site Electrical Engineer
Client Name : ROP
Project Name : Construction of Marble & Granite factory at free zone, Sohar., Oman Position : Site Electrical Engineer
Client Name : S & T Group L.L.C.
Consultant : Semac and Partners L.L.C. Oman
PROJECT HANDLED IN INDIA:
Project Name : Replacement of ABB 300 MVA Converter Transformer,Chandrapu Maharastra. Position : Site Electrical Engineer
Client Name : HVDC
Main Contractor : ABB
Project Name : 4x200MW, Hydro Power Station 11.8kV/400Kv, Koldam Himachal Pradesh Position : Site Electrical Engineer
Client Name : NTPC
Main Contractor : BHEL
Project Name : 6 x 660 MW, Thermal power plant,22kv/765kv Singrauli Madhya Pradesh. Position : Site Electrical Engineer
Client Name : Reliance Power Plant, Sasan (MP)
Main Contractor : L & T
Project Name : Sub Station 400Kv/220Kv Bidadi Banlore. Position : Site Electrical Engineer
Client Name : Power Grid
Mian Contractor : BHEL
ACHIEVEMENT:
• Have successfully completed reputed projects from all inspections, testing &commissioning till civil defence approval.
• Have been successful in meeting company monthly targets by executing engineering and site activities on time.
Created with
PDFBear.com
• Have successfully managed engineering & site execution of Fire Pump room for reputed projects.
• Have been successful in identifying & claiming variation in work by timely identification.
• Have successfully managed team of engineers & supervisors by providing right inputs considering consultant comments and solutions in time.
• Have successfully executed commissioning of Fire Pumps (Patterson-USA) by implementing right practices and procedures.
PERSONAL SKILLS:
• Comprehensive problem solving ability.
• Excellent knowledge of the installation and maintenance of electrical system and equipment.
• Ability to deal with people diplomatically.
• Willingness to learn.
• Team facilitator and hard worker.
• Capable of reading or writing diagrams and instructions for electrical panels or equipment. PERSONAL DETAILS:
Date of birth : 1stMarch 1984 Passport No. : U2378006 Nationality : Indian Date of Issue : 07/01/2020
Marital status : Single Date of Expiry : 06/01/2030 Language Known : English, Hindi Place : Patna
I hereby declare that all statement above are true, complete & correct to the best of my knowledge and belief.
Date : (Abdul Nasir)
Created with
PDFBear.com