A B O U T M E
SHADY ABDELSALAM GAAFAR EISSA
CONSTRUCTION DIRECTOR RAIL INFRASTRUCTURE
EXPERIENCE
CONSTRUCTION DIRECTOR –ORASCOM
CONSTRUCTION
(July 2020 –Till Date)
November 2021 –Till date
Cairo Metro Line 4 NPC 402 Construction Director
- Contract Value 13,500,000,000 EGP.
- Assist in bidding stage( Commercial & Technical),with Tender Teams.
- Choice of Mid managament Level staff.
- Choice of Equipment and supplies .
- Startup Budget .
- Assist in choices of subconsultants for Design and temporary works March 2021-September 2021
MYHC Deputy Project Director
(Magdy Yaacoub Heart Center In cairo)
- Contract Value 2,780,000,000 EGP Turnkey EPC.
- Responsible for startup of Magdy Yaacoub New Heart Centre in Cairo.
- Project scope includes (Civil-Architectural-MEP-Medical Furnishing).
- Capacity of 300 beds, 6 OR, intensive care units.
- Staff Allocation and Staffing Choice and allocation throughout the project duration, including evaluation and choices of key persons.
- Initiate startup budget, (structure and compliance to tender breakdown).
July 2020-March 2021
Precast Yard Manager- Bombardier, Orascom &Arab
Contractors Greater Cairo Monorail
- Contract Value 2,650,000,000 Euro.
- Responsible for Precast Yard for 6 October monorail with a budget of 1,800,000,000 EGP
- Zone 2 consists of 3 over ground stations and 9 km bridge.
- Manpower include 3 full crews for 3 areas, reaching up to 800 men at peak, excluding subcontractors.
- Precast Yard of pre- stressed Beams 88,000 L.M
- 3 production lines with 13 molds from (Ninive International).
- 6 Gantry cranes of capacity 110 Tons and 4 RTG cranes.
- Precast Yard of area =52000 m2
- Responsible for Steel yard, Training center, batching plant. 17 years experienced Civil
Engineer in Mega projects
(Infra structure – Industrial –
Complicated Structures) with
Multi National Tier
Corporates.
C O N T A C T
adpngx@r.postjobfree.com
https://www.linkedin.co
m/in/shady-a-salam-
4282141b
Cairo, Egypt
E D U C A T I O N
HIGHER TECHNOLOGICAL
INSTITUTE 10TH OF
RAMADAN
CLASS OF 2004
GPA 3.14
GRADUATION PROJECT:
CONSTRUCTIONAL
MANAGEMENT
GRADE A
CERTIFICATES
CIEH - LEVEL 3 (03/2016 – 03/2016)
SAFETY MANAGEMENT FOR
MANAGERS AND SUPERVISORS’ LVL3
CIEH - LEVEL 4 (08/2016 – 08/2016)
SAFETY MANAGEMENT FOR
MANAGERS AND SUPERVISORS’ LVL4
CMQ/OE PREP COURSE
CERTIFIED MANAGER OF QUALITY
/ORGANIZATIONAL EXCELLENCE
PMP PREP COURSE
PROJECT MANAGEMENT
PROFESSIONAL
ORGANIZATIONS
EGYPTIAN SYNDICATE OF ENGINEERS –
MEMBERSHIP
LANGUAGES
ARABIC :NATIVE
ENGLISH :FLUENT
FRENCH :INTERMEDIATE
DEPUTY UNDER GROUND MANAGER – VINCI
CONSTRUCTION GRANDS PROJETS
(October 2017-June 2020)
- Contract Value 1,100,000,000 Euro.
- Responsible for all Underground works related to Greater Cairo Metro Line 3 phase 3.
- Liaison between Station Managers and other departments.
- Champion temporary works until a TWC (Temporary Works Coordinator) is hired and a Temporary works procedure is in place.
- Startup Initial budget and setup requirements for phase 3A and follow up approval and validation.
- Choice of Material and Formwork systems to be in place for forecast activities.
STATION MANAGER –PORR-SBG-HBK (PSH) JV –
DOHA METRO GREENLINE
(March 2014-August 2017)
- Contract Value 2,500,000,000 Euro.
- Responsible for Civil/Architectural/MEP works for Al-Rayaan Al- Messila Underground Station.
- Control Manpower Involved is almost equal to (1200 men) including Subcontractors.
- Plan and assign Mitigation Plans for any delays occurring during Construction.
- Bottom up method for station, and NATM tunnel for under passes.
- Handing over of station to RKH QITARAT a consortium between RATP Dev, Keolis and Hamad Group Trading, Including rooms, systems …etc.
SENIOR ENGINEER -VINCI CONSTRUCTIONS
GRANDS PROJETS- VARIOUS PROJECTS
(September 2007-February 2014)
- (Dec-2013-March 2014) Senior Engineer Sluice way New Assiyut Hydro Barrage.
- (Oct 2009-Dec 2013) Senior Engineer Stadium Station Greater Cairo Metro Line 3phase 2,construction and handing over to cairo metro company for operations
- (Jan 2009- Oct 2009) Senior Engineer Cut and cover tunnel Greater Cairo Metro Line 3 phase 1.
- (Sep 2007- Dec2008) Deep Foundations Engineer Abbasia and Attaba Stations Greater Cairo Metro Line 3 phase 1. SITE ENGINEER–HASSAN ALLAM HOLDING –
NATIONAL MUSEUM OF NUBIAN CIVILIZATION
(July 2006-June 2007)
- Responsible for civil works of part 7, 8 of the museum with 5,500 m2 area and 28 m height.
- Responsible for Architectural works of Basement of the museum with 36,000 m2.
TECHNICAL ENGINEER -ALAMAR
CONTRACTING - VARIOUS PROJECTS
(August 2005-June 2006)
- Private villas in New Cairo (Earth Works - Civil Works) 7,300,000 L.E.
- New Maadi club handball stadium execution (Civil Works) 6,500,000 L.E.
- Port Ghalib Marine port shoreline 3 km (Guide wall and capping beam construction including concrete trimming) 550,000 L.E excluding material.
SITE ENGINEER – FORMING CONTRACTORS –
VARIOUS PROJECTS
(Novmber2004-July 2005)
- Fabrication and installation of M shaped blocks with ventilation pipes for filtration units of water treatment plants.
- Fabrication and installation of precast slabs (2.0x1.0) m with ventilation pipes for filtration units of water treatment plants PERSONAL DETAILS
Date of Birth: 28/06/1982
Place of Birth: Cairo, Egypt.
Nationality: Egyptian.
Gender: Male.
Marital Status: Married.
SOFTWARE AWARENESS
MS OFFICE
MS PROJECT
AUTOCAD
PRIMAVERA P6