Post Job Free

Resume

Sign in

Cad Technician Quality Controller

Location:
Karachi, Sindh, Pakistan
Posted:
December 09, 2021

Contact this candidate

Resume:

Personal Details

Nationality Pakistani

Profession CAD

Position in the Firm Senior CAD Technician

Date of Birth 01-05-1978

Address Flat No. C-106 Block 13/D2

Gulshan-e-Iqbal Karachi

Pakistan

Marital Status Married

Contract +92-333-*******

+92-303-*******

Email Address adplpr@r.postjobfree.com

Key

Qualifications

More than Seventeen years experience in preparation of design drawings for Bridges and Culverts, Highways and Satellite Map Digitizing, Multistory and High rise Buildings, Commercial plazas, shopping centers, Hospitals and RCC shop drawings.

Education and

Professional

Status

Passed the Metric from Sindh Board of Karachi.

Passed the Civil Diploma of Sindh Technical Education Board Karachi.

Passed the Civil Drafting Certificate for Trade Tasting Board in Karachi.

Passed the Auto CAD Course from the City Institute of Computer

Technology.

Passed the Windows & Auto Cad Courses from the Pro Soft Professional Software's.

Software's:

Auto CAD Release 14, 2000,to 2015

Micro Station. V8i

Project Wise

Revit Certificate by Autodesk

Multi Rebar

MS Office

Windows Xp

Language Ability Urdu Excellent

English Good

Employment

Record

March 2018 – Present Khobar: Senior CAD Technician,

Saudi Arabian Parsons LTD.

·Energy Industrial City in Aramco Projects.

The project involved the Drafting of Roads, Bridges, Culverts, Buildings, Residential Buildings, Mosque and Concrete reinforcement detailing.

·Bridge – 6 Interchange with ERP.

The project involved the Drafting of Bridges, retaining walls and Flume lining. The Bridge was cast in place with cast in place wing walls and approach slab. The flume lining was made of precast panels.

·Camel Crossing Bridge with ERP.

The project involved the Drafting of Bridges, retaining walls and Flume lining. The Bridge was cast in place with cast in place wing walls and approach slab. The flume lining was made of precast panels.

·Railway Crossing Bridge with ERP.

The project involved the Drafting of Bridges, retaining walls and Flume lining. The Bridge was cast in place with cast in place wing walls and approach slab. The flume lining was made of precast panels.

Feb. 2017 – March 2018 Riyadh: Senior CAD Technician,

Saudi Arabian Parsons LTD.

·Qiddyah Project.

The project involved the Drafting of Buildings, Residential society, Entertainment city and Parks Concrete reinforcement detailing.

Dec. 2014 – January 2017 Muscat: Senior CAD Technician,

Renardet S.A. & Partners

Responsible for drafting detailing & Shop Drawings of R.C.C Structures in conformance with BS and ACI Standards. Worked on the following structural projects:

·PDO in Muscat project.

The project involved the Drafting of Buildings, Villas.

Reinforcement Detailing and shop Drawings.

·Sohar port in project.

The project involved the Drafting of Steel structure work.

Concrete Reinforcement detailing.

July 2014 – October 2014 Sharjah: Senior CAD Technician,

Freelance 3 Months WSP Group

Contract Job Responsible for drafting detailing & Shop Drawings of R.C.C Structures in conformance with BS and ACI Standards. Worked on the following structural projects:

·Orbital Highway in Qatar project.

The project involved the Drafting of Bridges, retaining walls and Flume lining. The Bridge was cast in place with cast in place wing walls and approach slab. The flume lining was made of precast panel and reinforcement detailing.

May 2011 – April 2014 Muscat: Senior CAD Technician,

Parsons International

Responsible for drafting detailing & Shop Drawings of R.C.C Structures in conformance with BS and ACI Standards. Worked on the following structural projects:

·Batinah Expressway.

The project involved the Drafting of Bridges, retaining walls and Flume lining. The Bridge was cast in place with cast in place wing walls and approach slab. The flume lining was made of precast panels.

·Muscat Expressway.

The project involved the Drafting of Culverts, retaining walls and Flume lining. The culvert was cast in place with cast in place wing walls and approach slab. The flume lining was made of precast panels.

·Design Nizwa – Tumrait Raod.

The project involved the Drafting of Culverts, retaining walls and Flume lining. The culvert was cast in place with cast in place wing walls and approach slab. The flume lining was made of precast panels.

·Design Darsait - WAK Design.

The project involved the Drafting of Culverts, retaining walls and Flume lining. The culvert was cast in place with cast in place wing walls and approach slab. The flume lining was made of precast panels.

·Underpass at Bait Al Barka Roubdabad.

The project involved the Drafting of Culverts, retaining walls and Flume lining. The culvert was cast in place with cast in place wing walls and approach slab. The flume lining was made of precast panels.

·Al Mahaj Interchange.

The project involved the Drafting of Bridge Detail Drawings.

·Al Athaibah Interchange.

The project involved the Drafting of Bridge Detail Drawings.

·Al Faroosiya Street Interchange.

The project involved the Drafting of Bridge Detail Drawings.

Jan 2007 – March 2011 Abu Dhabi: CAD Technician,

WS Atkins & Partners Overseas

Responsible for drafting detailing & Shop Drawings of R.C.C Structures in conformance with BS and ACI Standards. Worked on the following structural projects:

·Al Sowa Island.

The project involved the Drafting of Bridge Detail Drawings.

·Bahrain Bay Infrastructure Manama Bahrain:

The project involved the Drafting of Bridges, retaining walls and Flume lining. The Bridge was cast in place with cast in place wing walls and approach slab. The flume lining was made of precast panels.

·Abu Dhabi International Airport Expansion.

The project involved the Drafting of Building Details Drawings.

§Al Jazira Club Towers:

The project involved the Drafting of Building Details Drawings.

§First Gulf Bank.

Head Quarter Extension - W38 Abu Dhabi:

The project involved the Drafting of Building Details Drawings.

§Bridge way.

Mixed Use Development - W68 Abu Dhabi:

The project involved the Drafting of Building Details Drawings.

§Ipic New Head Quarters Building Abu Dhabi:

The project involved the Drafting of Building Details Drawings. Tower Fin Steel Truss Details.

§Al Durrah Tower:

Residential Tower Trade Centre 1 in Dubai

The project involved the Drafting of Building Details Drawings. Tower Fin Steel Truss Details.

Feb 2004 – December 2006 Pakistan: CAD Technician, Halcrow Pakistan

Responsible for draughting detailing & Shop Drawings of R.C.C Structures in conformance with BS and ACI Standards. Worked on the following structural projects:

·College of Technology, Qatar: Prepared steel detailing for various buildings in College. Prepared 32 number drawings for various pours in conformance with BS4466 and maintained direct liaison with the client. Woods Bagot, Connell Mott MacDonald and KEO International Consultants offered consultancy Services for the project and United Engineers (Malaysia) Berhad was the Contractor.

§Dubai Airport Expansion Project: Prepared steel detailing drawings for Concourse 2 and Terminal 3 of Dubai Airport. The project conformed to both BS and ACI standards and maintained information management designed by the Joint Venture of Contracts Laing O'Rourke and Al-Naboodah. ADPi and Dar al-Handasah designed the project.

§(JBR) Jumerh Beach Residence (U.A.E): Detailing & Bar Bending Schedule preparation of structural member - (Wall, columns, slab,) using Multirebar (Following BSS 8666).

§(DFC) Dubai Festival City (U.A.E): Detailing & Bar Bending Schedule preparation of structural member - (Beam, slab,) using Multirebar (Following BSS 8666).

§Third Inlet Flume, Bahrain Petroleum Co.

The project involved the Drafting of Culverts, retaining walls and Flume lining. The culvert was cast in place with cast in place wing walls and approach slab. The flume lining was made of precast panels.

§Khor Fakkan South Gateway.

The project involved the Drafting of Bridge Detail Drawings.

§Diftah Clover Leaf Interchange:

The project involved the Drafting of Bridge Detail Drawings.

§Abu Shagara Underpass:

The project involved the Drafting of Bridge Detail Drawings.

April 2002 - January 2004 Dubai: M/s Wilbur Smith Associates.

Responsible for drafting detailing Drawings of Road & presentation. Worked on the following Highways projects.

§Dubai Fujairah Highway:

The project involved the Drafting of Road Detail Drawings.

§Dubai Bypass III:

The project involved the Drafting of Road Detail Drawings.

§Oud Muteena Highway:

The project involved the Drafting of Road Detail Drawings.

October 2000 - March 2002 Pakistan: M/s Fugro Geodatic LTD.

§Fugro Pakistan and Fugro Holland “Landbouw, Natuurbeheer en Visserij (LNV)” Project for Ministry of Agriculture and Fisheries Holland. This huge and long digitizing project covered all agricultural area of Holland by using Micro Station and Microsoft Access Database.

§Worked on 20M Contour Capture Project as Quality controller for Geospatial Sciences Queens Land Australia.

§

August 1999 - August 2000 Dubai: M/s Syna Management Engineering Consultants.

(One Year Contract)

§Hilton Hotel (Abu-Dhabi)

§Buildings & Villas.

§Etisalat Building (Sharjah)

§Buildings, Factory.

§Hostel Building.

May 1996 – July 1999 Pakistan: Engineers Consortium (Consulting Engineers Practical Experience of R.C.C. + Pre-Stressed Structures on the following projects

§Rashid Minhas Road Fly-Over Karachi.

§Al-Noor Sugar Mills Building.

§Dewan Sugar Mills Work Shop Building.

§Engro Pak Tank Terminal Port Qasim.

§Aga Khan Hospital.

§Oxford University Building.

§120 m. Kohat P.S.C. Bridge (N.W.F.P)

§23 m. Single Span P.S.C. Bridge at Pingal (N.W.F.P)

§20 m. Single Span P.S.C. Bridge at Chamarkand (N.W.F.P)

§450 m. (5 Lanes) P.S.C. F.T.C. Flyover at Junction of Shahrah-e-Faisal & Korangi Road,

§Karachi (Design for Turnkey Tender)

§Makran costal Highway project.

NWFP Highway Project.

§Motorway (M-1) From Km. 149.300 to Km. 154.400, Extension of RBOD From Sehwan to Sea, Wana (South waziristan) to Khar Bajaur (644 Km.) Project.

§FTC Interchange (Shahra-e-Faisal), Rehabilitation of Gujjar Nala Including Service Road, Hub Bypass Project.

§Hyderabad Section N-5 (Km. 101.000 to Km. 149.000), Tori Khan Bridge on Harnai Sanjavi road, Kotal Bridge Project, Larkana – Khairpurg Project.