MR.TUFAIL MUHAMMAD
Address: Hor AL Anz, Dubai
Contact No: +971-**-*******
Email: *****************@*****.***
Nationality Pakistani
Passport. No 162030-344639-9
Date of birth March-03-1992
Religion Islam
Marital Status Single
Visa Status Visit
Expiry Date 10-Jan-2022
Languages English, Urdu, Pashto, Arabic
3
D.A.E Computer (3 Year)
2012
1st
B.T.E Peshawar
Micro Soft Word, Micro Soft Excel, Auto cad 2009 and Internet etc Leica Total Station Sokkia 620 K Sokki 630 R
Topcon GTS 229 Topcon GTS 230 Topcon GTS 610
Trimble Total Station
Trimble GPS
S.NO EDUCATION YEAR OF
PASSING
DIVISION BOARD / UNIVERSITY
1 S.S.C(Science) 2008 1st B.I.S.E Mardan
2
Diploma of Associate
Engineering 2015 1st B.T.E Peshawar
PERSONAL INFORMATION:
ACADEMIC RECORD:
COMPUTER SKILLS:
SURVEY INSTRUMENTS:
2
All kinds of level machines
Having more than 05 years experience in roads, Infrastructure and Land Scaping with Civil Construction Companies
Road: Setting out of road,center line,baseline+Curb stones level for roads +land scaping.
DURATION: 1st NOV 2017 To 05TH July 2018..
Worked with AL MARWAN.GEN.CONTR.CO(MGCC) As a Surveyor at jawazia devolopement project.water pipe line+sewerage line+fire fighting+istallation of foundation+chambers+precast concrete works.
DURATION: 18TH MAR 2016 TO 27TH OCTOBER 2017.
Worked with AL MARWAN GEN.CONTR.CO.(MGCC) as a surveyor at university Project: Installation of chambers,manholes,gullies,water pipe line, irrigation and storm water line.
Worked with AL MARWAN GEN.CONTR.CO.(MGCC) as a land surveyor at Truck Toll Plaza project (incuding infrastructure gullies chambers all kind of ducts ready-made rooms and concrete etc.
DURATION: 10th july 2018 TO 30Thoctober 2018
Worked with Habib Rafiq Construction Company At DHA Islamabad Phase II on Water Treatment Plant.
DURATION: 10TH JAN 2010 TO JUN 15 th2011
Working with AL MARWAN GEN. CONTR. CO. (MGCC) As a Surveyor at Development of the Road between Al Gharayen – Al Noaf Area and the Roads between JN. 14 to JN. 85 – Sharjah, UAE.
DURATION: 10TH APRIL 2017 TO TILL DATE.
I was responsible to handle all under mention activities and works whenever I was working at the above described Projects.
Supervision of Building Layouts.
Supervision of Asphalt road construction.
Supervising and ensuring the contractor’s workmanship quality. Supervise all works of building and roads.
Coordination with Consultancy, Project Manager, Construction Manager, quantity Section, Procurement, Machinery Material & Store etc.
Making Request and approved by Consultants.
PROFESSIONAL EXPERIENCE:
DUTIES AND RESPONSIBILITIES:
3
Preparation of X-Section Building etc.
Making Ordered for all types of Materials to the manufactures.
Daily, Weekly & Monthly Progress Reports and Working Schedules.
Layout of center line & fixing of preservation of all control points of the whole project.
Fixing of Base Points.
Taking X. section with total station plotting of NSLs & Calculation of Quantities.
Traversing.
Preparation of bar Bending Schedule of all type . Supervision of complete Road Survey and structure works.
Bench marks Shifting and Closing.
Layout of horizontal Curve, Reverse Curve, Compound Curve.
Calculate Super Elevation and Embankment and Widening in Curve Portion. Preparation of Embankment sub grade, sub base, W.B.M. Aggregate Base
Course, Asphalt Base Course and Wearing Course.
STRUCTURE:
Layout and leveling of Culverts Retaining Walls, Breast Walls and Side Drain. Layout and leveling of structure.
Excavation of side Drain layout, leveling and observe work done X- Section. Alignment of Culverts.
Shop Drawings of Culverts, Retaining Walls, Breast Walls and Side drain. QUANTITIES:
Calculation of Concrete.
Calculation of Steel Weight and Stone Masonry.
Bar Bending Schedule of Structure