To take all my technical and practical knowledge combined with my experience and use them at your company’s disposition.

Employment & Experience History

Pipe Superintendent

April 2021 – Present, BRW Contracting, Inc. (Large Apartment Complex and Large Subdivision Site Developer)

Plan, direct, and coordinate all activities to be performed by four Pipe crews each one consisting of Pipe Foreman, Pipe layer, Excavator Operator, Loader Operator, Tail man, and Hillman

Elaboration of Work Plans, JHA’s and Step by Step Operation Narratives for Pre-Installation Meeting Presentations

Coordination of equipment transportation and material handling to/from jobsite, job scheduling, work together with the Project Manager on the RFI’s, Change Orders and material purchase for the safety and productive construction of water main, sanitary (gravity and force main), storm sewer pipe lines and lift station installation & plumbing.

Field Superintendent

August 2019 – March 2021, Kiewit (Selmon Expressway West Extension, Tampa, FL and Loveland Grand Master Lift Station, Port Charlotte, FL)

Plan, direct, and coordinate all activities to be performed by three Pipe crews, each one consisting of Pipe Foreman, Pipe layer, Excavator Operator, Loader Operator, Tail man and Hillman

Elaboration of Work Plans, JHA’s and Step By Step Operation Narratives for Pre-Installation Meeting Presentations

Coordination of equipment transportation and material handling to/from jobsite, job scheduling, work together with the Project Engineer on the RFI’s, RFM’s and material purchase for the safety and productive construction of water main, sanitary (gravity and force main), storm sewer pipe lines, lift station installation & plumbing with above pipe installation and roadways.

Pipe Foreman

February 2019 – July 2019, Kiewit (Selmon Expressway west Extension, Tampa, FL)

Plan, direct, and coordinate all activities to be performed by two pipe crews, each one consisting of Pipe Foreman, Pipe layer, Excavator Operator, Loader Operator, Tail man and Hillman

Some of the responsibilities include the coordination of equipment transportation and material handling to/from jobsite, job scheduling, work together with the field engineer on the RFI’s and RFM’s and material purchase for the safety and productive construction of water main, sanitary (gravity and force main) and storm sewer pipe lines.

Assistant Superintendent

May 2018 – January 2019, The Middlesex, Corp. (Orlando Airport Civil Utilities Project)

Plan, direct, and coordinate all activities to be Self-performed and/or Sub-contracted

Elaboration of JHA’s and Step by Step Operation Narratives for Pre-Installation Meeting Presentations

Coordination of equipment transportation and material handling to/from jobsite, job scheduling, work together with the Project Engineer on the RFI’s, RFM’s and material purchase for the safety and productive construction of water main, sanitary (gravity and force main), storm sewer pipe lines and roadways.

Pipe General Foreman

March 2017 – April 2018, The Lane Construction, Corp. (I-4 Ultimate Project Orlando, FL)

Plan, direct, and coordinate all activities to be performed by two pipe crews, each one consisting of Pipe Foreman, Pipe layer, Excavator Operator, Loader Operator, Tail man and Hillman

Some of the responsibilities include the coordination of equipment transportation and material handling to/from jobsite, job scheduling, work together with the field engineer on the RFI’s and RFM’s and material purchase for the safety and productive construction of water main, sanitary (gravity and force main) and storm sewer pipe lines.

Pipe Foreman

February 2016 – February 2017, SGL Constructors (I-4 Ultimate Project Orlando, FL)

Plan, direct, and coordinate all activities to be performed by a 5-person crew (Pipe layer, Excavator Operator, Loader Operator, Tail man and Hillman)

Some of the responsibilities include: water, sanitary (gravity and force main) and storm sewer pipe installation, Heavy Equipment and Materials Inspections

Project Superintendent

July 2015 – December 2015, LPC Construction, Inc., Yuma AZ

As General Contractor coordinate, plan, organize, or direct activities of sub-contractors concerned with the construction or maintenance of structures, facilities, or systems. Some of the construction projects include, but are not limited to, earth work for building construction, building renovations, demolition of buildings, street construction and water, sanitary, and storm sewer pipe installation.

Senior Survey Technician/Crew Chief

January 2015 – June 2015, Core Engineering Group, PLLC, Yuma, AZ

Record the results of surveys, including the shape, contour, location, elevation, and dimensions of land or land features.

Prepare and maintain sketches, maps and reports of surveys.

Compute geodetic measurements and interpret survey data to determine positions, shapes, and elevations of geomorphic and topographic features.

Calculate heights, depths, relative positions, property lines, and other characteristics of terrain.

Project Superintendent

April 2013 – December 2014, VC Equipment, Corp., San Juan, PR

Plan, organize, or direct activities concerned with the construction or maintenance of structures, facilities, or systems. Some of the construction projects include, but are not limited to, earth work for building construction, demolition of buildings, street construction, and water, sanitary, and storm sewer pipe installation.

Project Manager

January 2006 – March 2013, Santana Equipment, Dorado, PR

Plan, organize, or direct activities concerned with the construction or maintenance of structures, facilities, or systems. Some of the construction projects include, but are not limited to earth work for building construction, demolition work, roadway construction, water mains, storm sewer, sanitary sewer and lift station installation & plumbing with aboveground & underground pipe installation.

Participate in the conceptual development of a construction project and oversee its organization, scheduling, budgeting, and implementation.

General Foreman

January 2004 – December 2005, E.C.O Construction, Inc., Naguabo, PR

Plan, direct, or coordinate all activities concerned with the construction of 46 home units starting at $350,000 each.

Some of the responsibilities were land development, earthwork, water main, storm sewer, sanitary sewer and lift station installation & plumbing with aboveground & underground pipe installation, street construction, and house construction.

Land Survey Crew Chief

February 2001 – December 2003, F & R Construction Group, Inc., Rio Piedras, PR

Record the results of surveys including the shape, contour, location, elevation, and dimensions of land or land features.

Prepare and maintain sketches, maps and reports of surveys.

Compute geodetic measurements and interpret survey data to determine positions, shapes, and elevations of geomorphic and topographic features.

Calculate heights, depths, relative positions, property lines, and other characteristics of terrain.

Produce drawings using computer-assisted drafting systems (CAD) or by hand using compasses, dividers, protractors, triangles and other drafting devices.

Land Survey Coordinator

January 1998 – January 2001, I.C.A. Miramar Metro, Bayamon, PR

Plan, direct, or coordinate all activities of two land survey crews composed of two people each, at a segmental bridge contract in Bayamon, P.R.

Some of the responsibilities included geometric control of pre-cast segments, balanced cantilever segment erection, transition zone segment erection, erection of segments with launching girder, producing drawings using computer-assisted drafting systems (CAD), and As-Built survey of the guide way.

Project Superintendent

June 1996 – December 1997, Powertronics, Inc., Hato Rey, PR

Plan, direct and coordinate all activities concerned with the replacement of the whole sanitary sewer system at the U.S. Naval Station of Sabana Seca, P.R.

Land Survey Crew Chief

March 1994 – May 1996, Redondo Construction, Corp., Guaynabo, PR

Record the results of surveys including the shape, contour, location, elevation, and dimensions of land or land features.

Prepare and maintain sketches, maps and reports of surveys.

Compute geodetic measurements and interpret survey data to determine positions, shapes, and elevations of geomorphic and topographic features.

Calculate heights, depths, relative positions, property lines, and other characteristics of terrain.

Produce drawings using compasses, dividers, protractors, triangles and other devices.

Road and street layout, storm sewer layout, bridge layout, and earthwork.

Land Survey Crew Chief

July 1993 – February 1994, Araujo & Asociados (PLS) Trujillo Alto, PR

Record the results of surveys including the shape, contour, location, elevation, and dimensions of land or land features.

Prepare and maintain sketches, maps and reports of surveys.

Compute geodetic measurements and interpret survey data to determine positions, shapes, and elevations of geomorphic and topographic features.

Calculate heights, depths, relative positions, property lines, and other

Career Pages characteristics of terrain.

Produce drawings using compasses, dividers, protractors, triangles and other devices.

Road and street layout, storm sewer layout, bridge layout and earthwork.

Geotechnical Technician

January 1993 – June 1993, Suelos, Inc. (Geotechnical Engineers) San Juan, PR

Perform soil density test for compaction with nuclear gauges and record the results in data sheets.

Collect earth samples and perform tests such as grading, classifications, plastic and elastic limits and proctor for compaction and shrinkage/expansion index and record the results in data sheets.

Collect concrete samples and perform tests such as slump test and concrete cylinders breaking for concrete strength tests and record the results in data sheets.

Draftsman/Office Clerk/Rodman/Instrument man

June 1992 – December 1992, José A. Rivera & Associates (PLS) San Juan, PR

Produce drawings using compasses, dividers, protractors, triangles and other devices.

Compute geodetic measurements and interpret survey data to determine positions, shapes, and elevations of geomorphic and topographic features.

Record all land survey data from field books to a computer software and produce coordinates and elevations

Perform office duties, such as archive plans and documents, prepare letters and documents and office maintenance.

Perform field duties, such as boundary surveys, topographic surveys, construction staking, road layout, building layout, etc.

Education

1996 – 1998, Polytechnic University of Puerto Rico

Two years of Land Surveying and Mapping

1990 – 1992, University of Puerto Rico

Associate Degree in Civil Engineering Technology

Job Related Training and Skills

Back Hoe, Excavator, Bulldozer, Wheel Loader, Roller Compactor and Fork Lift All Terrain, Operator OSHA Certification.

CPN Training Course on Radiation Safety and Use of Nuclear Gauges for Soil Compaction, from Boart Longear Company, Deerfield Beach, FL.

Proficient with AutoCAD, Bluebeam, Carlson Survey, and Microsoft Office.

Knowledge and experience with TDS RECON and NOMAD Data Collectors with survey equipment like NIKKON, TOPCON, SOKKIA, LEICA, ZEISS and PENTAX.

Knowledge and experience with Trimble GPS, Robotic Total Stations and Data Collectors

Experience with Segmental Bridge Technology (Survey layout and Construction).

Experience with Lift Station Installation & Plumbing

Experience with aboveground pipe installation

Wide experience with underground utilities installation

References

Dale Ellis

The Lane Construction Corp.

General Superintendent

407-***-****

Craig Rehwaldt

The Lane Construction Corp.

Project Manager

863-***-****

Billy Sanchez

Archer Western

Bridge Superintendent

504-***-****

Matt Uribe

Kiewit

Project Manager

727-***-****

Juan Arana

Kiewit

Project Engineer

502-***-****

Thomas Thorn

Kiewit

Sponsor

Cody Jensen

Kiewit

Sponsor



Contact this candidate