Post Job Free

Resume

Sign in

Electrical Engineer Power Plant

Location:
Khobar, Eastern, Saudi Arabia
Posted:
December 01, 2021

Contact this candidate

Resume:

Curriculum Vitae

Personal Information

Full Name : Ibrahim Aied Alqunoon

Profession : Electrical Engineer

Mobile No. : 056*******

E-Mail : adpivc@r.postjobfree.com

Date of Birth : November, 5

th

,1990

Nationality : Jordanian

Passport No. : P056831

Memberships

: Saudi Council of Engineers

Jordan Engineers Association

Qualifications & Education

University Name : Jordan University of Science and Technology Degree : Bachelor

Specialization : Electrical Engineering, Power & Control GPA : 83.2

Graduation Date : June 10th 2013

Training & Scientific Courses

Company: National Electrical Power Company (NEPCO) Location: Electrical training center (ETC)

- Attending the training course in the field of power electric system contain of the following: 1) Transformer operation, Testing & maintenance.

2) Specification of transmission and distribution network. 3) MV switchgear testing & operation.

4) Transmission lines simulator & HV laboratory.

5) Programmable logic control (PLC).

6) Underground power cables design.

7) AC motor control.

8) House wiring fundamentals.

IT knowledge

• MICROSOFT OFFICE

• AUTODESK: AUTOCAD

• ETAP

• DIALUX

• ABB: E-DESIGN

• SIEMENS: SIMARIS

• SCHNEIDER ECODIAL

Experiences

Country: Kingdom of Saudi Arabia

10th of June 2014 – 2nd of October 2019

Company: Alayuni Investment and Contracting Company Position: Construction, Electrical Engineer

Project #1

Project: 4th Extension of Arar Power Plant.

Client: Saudi Electricity Company.

Consultant: ILF Consultants & Engineers.

Project Description: This Project Is the Fourth Extension of Arar Power Plant to Increase the Electricity Generating Capacity. It Includes Installation Two Siemens Gas Turbines Units with Auxiliaries, Generators, Iso-Phase Bus Ducts, Generators Circuit Breaker (Alstom), Power Control Center, Unit Auxiliary Transformers (Hyundai), Generator Step Up Transformer (ABB), HV Cables, MV Cables, LV Cables, RGS Conduits, EMT Conduits, Cable Ladders, Cable Trays, Lighting Fixtures and Wiring Devices ...etc.) And BOP Activities (Emergency Diesel Generator, MV Switchgears (ABB Unigear-ZS1), LV Switchgears, Battery Chargers, Battery Banks, UPS System, Duct Bank, Lighting Poles, Crude Oil Treatment Plant, Water Treatment Plant, Air Compressor Building, Four Storage Tanks…. etc.

-The Work Responsibility Includes:

1. Supervising Assembly of MV Switchgear, LV Switchgears, And Transformers as Per Vendor Manual and Drawings.

2. Supervising Cable Pulling and Laying Include Continuity and Insulation Tests, Glanding, And Termination.

3. Follow Up and Contribute in Testing and Commissioning of Power Transformers, Generator Circuit Breaker, MV Switchgear, LV Switchgear with Commissioning Team. 4. Supervising Earthing and Lightning Protection Systems Installation Include Earth Rods Testing.

5. Supervising Installation of Duct Bank, Cable Ladder and Trays, Conduits, Lighting Fixtures.

6. Contribute with Start-Up Teams in Energizing Different Parts of System. 7. Prepare RFI (Request for Inspection).

8. Prepare Test Reports and CCC (Commissioning Clearance Certificate). Project #2

Project: Water Transmission Pipe Line West Abha Reservoir to Rabeaa And Rofyda Villages. Client: Directorate of Water Services-Aseer Region. Consultant: Khatib & Alami

Project Description: This Project Includes Secondary Substation Connected to Saudi Electricity Grid At 13.8 KV To Feed 4 Large Pumps At 400 V Through Power Transformer 13.8/0.4 KV, Also Include Main Distribution Switchboard, Distribution Panel Boards, Motor Control Center, Lighting Panel Boards, Automatic Transfer Switch Panel, Capacitor Bank, And Two Backup Diesel Generators with Synchronizing Panel.

-The Work Responsibility Includes:

1. Prepare Material Requests for The Project.

2. Review Technical Offers of Material Requested Include but Not Limited of Transformer, RMU, Diesel Generators, LV Distribution Panels, Motors, Cables, Telephone System, Fire Detection and Alarm System to Check Matching with Client Specification Requirements, Then Submit the Matching Offers to Client for Approval. 3. Prepare Shop Drawings to Submit to Client for Approval. 4. Provide Technical Support to Supply Chain.

5. Follow Up Electrical Material Receiving, Handling, Storage and Installation 6. Supervise All Electrical Installation Works Include but Not Limited of Electrical Panels Installation, FACP, PABX, Duct Bank, Cable Trays, Cable Pulling, Cable Glanding, Cable Terminations, Earthing and Lightning Protection System, Lighting Fixtures, Wiring Devices, Smoke Detectors, Heat Detectors, Smoke Beam Detectors, Fire Alarm Bells, And Telephones.

7. Testing and Commissioning of Power Transformer, Electrical Panels and Energize Them. 8. Prepare WIR (Work Inspection Request) And MIR (Material Inspection Request) For Electrical Works.

Project #3

Project: Pumping Works and Water Transmission Line from Alsad Pump Station to West Abha Reservoir.

Client: Directorate of Water Services-Aseer Region. Consultant: Khatib & Alami

Project Description: This Project Include Secondary Substation Connected to Saudi Electricity Grid At 13.8 KV To Feed 4 Large Pumps At 4.16 KV Through Power Transformer 13.8/4.16, Also Include 13.8 KV Switchgear, 4.16 KV Switchgear,4.16 KV Motor Control Center, And Two 13.8 KV Backup Diesel Generators with Synchronizing Panel.

-The Work Responsibility Includes:

1. Review Technical Offers of Different Electrical System Components Include but Not Limited of Transformers, Diesel Generators, Motors, Cables to Check Matching with Client Specification Requirements, Then Submit the Matching Offers to Client for Approval. 2. Prepare Shop Drawings to Submit to Client for Approval. 3. Follow Up Electrical Material Receiving, Handling, Storage and Installation 4. Supervise All Electrical Installation Works Include but Not Limited of MV Switchgears Installation, Duct Bank, Cable Trays, Cable Pulling, Cable Glanding, Cable Terminations, Earthing System.

5. Prepare WIR (Work Inspection Request) And MIR (Material Inspection Request) For Electrical Works.

Country: Kingdom of Jordan

1st of December 2019- 1st of May 2021

Company: Roots Establishment of Engineering

Position: Electrical Design Engineer

-The Work Responsibility Includes:

1. Prepare Load Estimation List, Single line diagrams. 2. Prepare Lighting Calculation

3. Cable Sizing Calculation.

4. Prepare Electrical System Studies; Power Flow, Short Circuit, Harmonic Study…. Etc. 10th of September 2013- 31st of May 2014

Company: The Consolidated Sulphochemical and Detergents Industries Company LTD. Position: Maintenance-Electrical Engineer

-The Work Responsibility Includes:

1. Troubleshooting Faulted Circuit and do Needed Maintenance. 2. Install All Needed Electrical Installation for New Warehouses Added to Facility. 3. Execute Daily, Weekly, And Monthly Preventive Maintenance. 4. Prepare Maintenance Reports and Raise It to Higher Management. References

All Documents Are Available Upon Request



Contact this candidate