OMER IBRAHIM
adpi8m@r.postjobfree.com
+1-703-***-**** https://www.linkedin.com/in/omer-ibrahim/ SUBSTATION PROJECT MANAGER
Worked with reputable electrical utilities in project management, Sub-station specifications, Sub-station design, base design of protection and control system of Sub-stations, condition monitoring and asset management, failure investigation & root cause analysis, Technical & financial evaluation of bid documents for 400/220/132/33/11kV Sub-stations and maintenance & operation of Sub-stations. Project Management Substation Design Tender Documents Evaluation business Plan Budget Estimation Substation maintenance planning Communication Problem Solving Leadership Teamwork Microsoft Office Electrical Engineering Electromagnetic Transients Program (EMTP/ATP) EXPERIENCE
Qatar General Electricity & Water Corporation Feb 2003 – October 2021 Senior Engineering Services Engineer and Substation Engineer Project Management, business plan for new Projects, budget preparation for Substations up to 400kV, substation design, Preparation of scope of work and specifications for power transformers, GIS (Gas insulated switchgear) and MV Switchgear, Protection design, condition monitoring & asset management,, failure investigation and root cause analysis, technical evaluation of substations projects, annual outage planning, monitoring of quality of work execution, progress and completion schedule of all contracts, conduct prequalification for Power Transformer Factories and witnessing FAT and type test for power transformers and switchgear. Saudi Electricity company (SEC) –South Region April 1997 - Feb2003 Substation Project Engineer
• Project management including assurance of compliance of contract terms and conditions by contractors, follow up the time schedule of project, monitoring of cash flow in accordance with the price schedule, inter-departmental co-ordination work within project s scope of work. Follow up of monthly reports and weekly progress of work. Verification of measurements of work done and issuance of Provisional and Final Taking Over Certificates in accordance with terms and conditions of the contract. Flow up of punch list and warranty defects.
• Review and approval of design, drawing and material submittals related to 132kV Sub-stations layout and equipment, for example: 132kV GIS Switchgear, Power Transformer, MV Switchgear, DC system etc.
• Review and approval of base design for protection and control system of 132kV Sub-stations including relay types/ characteristics, relays settings and schematic drawings.
• Site supervision, testing and commissioning of sub-station equipment in accordance with approved commissioning schedules and site test protocol. Testing of all protective schemes and metering equipment in accordance with specification and relevant international standards.
• Participation in Technical and financial evaluation of bid documents submitted by various bidders for 132/33/13.8kV new and extension of existing Sub-stations National Electricity Corporation – Sudan
December 1989 – November 1996
Substation Engineer
• Operation and Maintenance of high voltage substations
• Installation, commissioning and testing of 220/110 substations EDUCATION
Bachelor of Science, Electrical Engineering
University of Khartoum, Sudan.
MSc Electrical Power System
University of Bath, UK
LANGUAGES
English, Arabic.