Post Job Free
Sign in

Communications Engineer

Location:
Toluca, Mexico, Mexico
Posted:
November 17, 2021

Contact this candidate

Resume:

*

* ****** **** *****

Sergio Nava Mejía

EDUCATION

Engineer in Communications &

Electronics. 1995-2000 IPN

Master of Science in Education.

****-**** ****

Diploma in leadership &

management. 2014-2014 ETAC

PMI Project Management Skills

Certification.

2018-2018 ITESM

SKILLS

Project Manager.

Field Engineer.

Instructor.

Teamwork.

Staff managment..

Installation &y commissioning.

Work at heights.

Effective negotiation.

Troubleshooting..

Attention cellular network failures.

Initiative & fluid learning.

***************@*****.*** 722-***-**** 722-***-****

EXPERIENCE ATelz, Inc. 5G Project Supervisor / Installer Sept 2019 a Sept 2020 Installation of 5G NOKIA and ERICSSON equipment (RRU, antennas, FO, jumpers, SQUID, supports, B nodes, power plant, cabinets, batteries), detection and solution of alarms, work at height, control of supplies, site delivery auditor and projects for T-Mobile and AT&T in Washington and California USA. CYS SA de CV Radio Frequency Engineer Feb 2018 a Jul 2019 Attention to reported alarms for nodes B and microwave links, work at height, replacement of ODU in microwave links, antenna alignment, tilt and orientation of RF antennas for the Movistar cellular network. TECNOLOGIAS EOS SA DE CV. Project coordinator Jun 2016 a Dic 2017 Installation and commissioning of SilverSpring microwave links for the smart meter network, coordination of AMI projects for CFE (meters, collectors, poles, wiring, transformers). Support for microwave links and advanced measurement software, teaching courses for CFE (Tabasco, Chiapas, Oaxaca, Nuevo León and Tamaulipas).

Radiomóvil DIPSA (TELCEL) Field Operation and Maintenance Engineer 1 Jul 2004 a 31 May 2016 Attention and alarm solution for Ericsson Node B and microwave links (NEC, Ericsson, Nokia), work at height (inclination and orientation of antennas to improve coverage), troubleshooting, local connection to equipment of the cellular network Telcel, Element manager and other software, hardware replacement, creation of VLANs and TX routes. Coordinator of contractors for the installation of new sites and site maintenance.

Ericsson Communications Engineer Jun 2001 a Dic 2002 Project Leader for Installation, installation, configuration and support of transmission, GSM, transmission and external plant equipment. Coordinator and supervisor of attention to failures and start-up projects for new technologies.

LANGUGES ENGLISH Intermediate. 1 year of language immersion working in the USA and 2 years working with English-speaking clients COURSES Emotional intelligence

Oct 2005

The great challenge yourself.

Agosto 2005

Time management.

Nov 2010

Idea networks

May 2012

The power of knowledge

May 2014

Service experiences.

Agosto 2015

Leadership & management.

May 2016

Project management

Oct 2018

Project Scope.

Nov 2018

Resource management.

Dic 2018

Effective negotiation.

Enero 2019

Quality plan of a project.

Feb 2018

SERGIO NAVA MEJIA

2 SERGIO NAVA MEJIA

TECHNICAL COURSES DIGITAL NETWORKS

ESIME (IPN)

23 Jun – 28 Oct 2000

BSC OPERATION

Ericsson

13-17 Aug 2001

Basic of Transmission

Ericsson

25-29 Jun 2001

Telecommunication Networks

Ericsson

02-06 Jul 2001

CMS 8800 Basic

Ericsson

16-20 Jul 2001

GSM System Survey

Ericsson

09-12 Jul 2001

RBS 2000

Ericsson

13 Jul 2001

Signaling C7

Ericsson

23-27 Jul 2001

Datacom Networking

Ericsson

30 Julio-02 Aug 2001

Ericsson Datacom Solutions

Ericsson

03 Aug 2001

UNIX SUN Solaris 7

System & Administrator I

NETEC

06-10 Aug 2001

BASIC IP WORKSHOP

TELCEL

20 Apr 2010

E-RAN SISTEM

SPIDER CLOUD

27 - 30 oct 2015.

CPP NODE FEATURES /

FUNCTIONS

ERICSSON EDUCATION

CENTER

14 MAR 2008

INTERNET WORKING

OVERVIEW

ERICSSON EDUCATION

CENTER

21 – 23 Sep 2008

ATM

ERICSSON EDUCATION

CENTER

15 A 16 OCT 2008

GSM 2206-2106 TESTING /

MAINTENANCE DELTA

ERICSSON EDUCATION

CENTER

11 A 12 MAR 2009

NODE B COMISSIONING

ERICSSON EDUCATION

CENTER

31 JUL 2009

WCDMA SYSTEM OVERVIEW

ERICSSON EDUCATION

CENTER

10 Y 11 Aug 2009

PDH PASOLINK MX NEC

ACEPTACION DE SITIOS O&M

NEC DE MEXICO

21 - 23 FEB 2005

CISCO 7600 SERIES

ESSENTIALS

GLOBAL KNOWLEDGE

26 Apr 2010

INTERCONNECTING CISCO

NETWORKING DEVICES PART 2

(ICND2)

CTT CORPORATION 25 -

29 OCT 2010

WCDMA RAN P7 FIELD

MAINTENANCE

ERICSSON EDUCATION

CENTER

29 Aug 2011

WCDMA RAN P7 PROTOCOLS

AND PROCEDURES

ERICSSON EDUCATION

CENTER

7-10 Feb 2012

TECHNIQUES OF CLIMBIMG &

WORKING AT HEIGHT BASIC.

SUQUINSA SA DE CV.

1-3 Aug 2012

CABLE IQ EQUIPMENT & DTX

1800 EQUIPMENT

TELCEL

29 Jan 2013

ANTENNA BASIC TRAINING

HUAWEI TRAINING CENTER

29 NOV 2013

TECHNIQUES OF CLIMBIMG &

WORKING AT HEIGHT

ADVANCED.

MECI PLUS

17-19 FEB 2014

CISCO CATALYST 6500

SERIES AND ASR9000

OVERVIEW TRAINING

GLOBAL KNOWLEDGE

25 - 28 Nov 2014

TECHNIQUES OF

CLIMBIMG & WORKING AT

HEIGHT EXPERT.

MECI PLUS

30 MAR – 1 Apr 2015

RBS 6000 OVERVIEW

ERICSSON EDUCATION

CENTER

20 Apr 2015

ADVANCED MEASUREMENT

INFRASTRUCTURE AMI

EOS

JUL 2016

OPERATION &

MAINTENANCE PASOLINK

NEO + MODULO TE

NEC DE MEXICO 21 -

23 Apr 2015

LTE 6601 FIELD

MAINTENANCE ERICSSON

EDUCATION CENTER

12 Aug 2015.

Competent Climber/Rescue

Meets ANSI Z359/ Z490/OSHA

29 CFR 1926

Feb 2020

TOWER SAFETY &

INSTRUCTION

Sep 2019

CPR, AED & Basic first AID

AMERICAN SAFETY & HEALTH

INSTITUTE

Sep 2019

FIRST AID, CPR, RF

AWARENESS, OSHA 30,

CLIMBER RESCUE,

RIGGING, MYNDCO

FEB 2020



Contact this candidate