PRINCIPAL PIPING DESIGNER Sr. PDS PDMS & SP*D

Seventeen years in Design: Leadership with technical and administrative functions.

Responsible for developing piping arrangements and isometric production, for process and utility systems. The responsibilities include the design and the modeling of all components of complex areas using CAD system (PDS 3D Intergraph Version 8.0 & PDMS Version 12.0), AutoCAD 2D / 3D, CADWorx.

Support to construction and PDS coordinator.

17 YEARS EXPERIENCE

MARKET SECTORS

LNG, Petrochemical, Refinery, Ammonia.

Languages skills:

Spanish (Native)

English 85%

Computer skills:

Microsoft applications (Excel, Word, etc.)

PDS 3D

Orthogen

Smart Plan Review

PDMSp

SP3D (training)

AutoCAD 2D / 3D

MICROSTATION 2D

Pellican Forge, etc.

LFM (Laser Scan)

CADWorx Plant Profesional

Revit Autodesk

CAREER HIGHLIGHTS

2019 -2021- Aliana Corporation

PRINCIPAL PIPING DESIGNER

Project PORT EDWARD LNG MAIN FACILITY – PRINCE RUPERT, BRITISH COLUMBIA

CAD WORX

Responsibilities

Design of master plant layout of C250N Liquefaction and Pretreatment units with storage tanks and truck loading bays Phase 1 Modularization and Phase 2 conceptualizacion for shippment and installation.

Project C100K LIQUEFACTION LNG PLANT MODULARIZATION GEORGE WEST - TEXAS

CAD WORX

Responsibilities

Design of all equipment and skids modeled as modules and interconnecting for Liquefaction, and Pretreatment units.

Project EFG AMINE GAS PLANT LAREDO - TEXAS

CAD WORX

Responsibilities

Design of Amine Gas plant, reconecting Dehy 1-2 and 3, interconnecting

Project HEP COUNTY LINE CRYO NGL Gas Plant Train 1 -Reeves TX

CAD WORX

Responsibilities

Design of modifications on Slug Cather, improvements to the previous design, PSV’s modifications, Flare system modifications, Process gas Scrubbers general arrangement, pipe supports proposal, Open and Close drain system for 700gpm Amine skid, Sump tanks and Sump pumps locations, Thermal Oxidizer design and Tie-ins locations.

2015 – Bechtel Houston Tx.

PRINCIPAL PIPING DESIGNER

Project: Sabine Pass Liquefaction LNG (Cheniere)

Principal Designer

PDS

Responsibilities

Checker to detail design of several Areas using piping isometrics.

Generated and drafted (microstation ) several kind of drawings like O&E load sketches, equipment location plans.

Piping Arrangements and modeled equipment.

Designed the small bore piping arrangements of the area.

Generated and checked clash reports as well as resolved conflicts.

2012 / 2015 – KBR Houston Tx.

PRINCIPAL PIPING DESIGNER / CHECKER

Project: Marshalltown

Principal Designer / Checker

PDMS

Responsibilities

Designed layout and piping arrangements of Main Rack Area and Train 1 and Train 2, Fuel Gas Area (stage 1 and 2).

Checker to Detail Design (stage 3) of several Areas using piping isometrics.

Generated and Checked clash report of all Areas.

Yellow-off Activities of all areas.

Project: Agrium Project

Principal Designer / Checker

PDS / PDMS

Responsibilities

Designed layout and piping Arrangements of Compressor Area

Designed modifications to preexistent process lines using laser scan.

Checker to Detail Design (stage 3) of several Areas using piping isometrics using Laser Scan

Generated and Checked clash report of all Areas.

Yellow-off Activities of several Areas.

Project: Dyno Nobel

Principal Designer

PDS

Responsibilities

Designed piping arrangements, Extracted isometrics, scrubbed isometrics, and fixed clashes

Project: INEOS OL2 SCORE Furnace Addition EP

Principal Designer

PDS

Responsibilities

Support design Area Furnaces and Quench water system.

Generated and Coordinated clash report.

2011 / 2012 - CB&I Houston Tx.

PRINCIPAL PIPING DESIGNER

Project: Natrium Extraction Plant

Principal Designer

PDS

Responsibilities

Design Compressor Area and Lube Oil system and Main Rack Area.

Elaboration of Plot Plans, Piping Plans using Orthogen

2011 /2011 – KBR Houston Tx.

PRINCIPAL PIPING DESIGNER

Project: KIOR FCU Refinery

Responsibilities

Designed piping arrangements and support design of Compressor Area, Hydrotreater Area and Converter Area

Principal Designer

PDS

2006 /2011 – KBR Moterrey, Mexico.

PRINCIPAL PIPING DESIGNER / CAD COORDINATOR

Project: Yanbu Export Refinery Project

CAD Coordinator./Principal Designer

PDS and Manual

Project: Air Product Escravos (GTL / EPC)

Designer / Checker

PDS and Manual

Project: SAUDI KAYAN (Petrochemical Complex)

CAD Coordinator.

PDS

Project: YEMEN LNG (liquid Natural Gas) - South Africa

CAD Coordinator and Checker

PDS

PIPING DESIGNER

VIGEN, Mexico.

Project: PB-KU-Z Offshore Platform – (Production)

PDS

CPI (Coorporacion Profesional de Ingenieria)

PIPING DESIGNER

Project: PB-KU-H Offshore Platform – (Production)

PDS

REICHHOLD QUIMICA DE MEXICO

Project: PR2 Conversion Project.

Detail Design & support to construction.

Location: Atlacomulco, Mexico.

AutoCAD

INSTITUTO MEXICANO DEL PETROLEO

Project: Complex KU-MALOOB ZAAP – México, DF. – Oil Platform –

Location: Bay of Campeche