Post Job Free
Sign in

Crane Operator Site Engineer

Location:
Quebec City, QC, Canada
Posted:
February 17, 2022

Contact this candidate

Resume:

HERALD P. MAJADAS

New Industrial City, Al Ojiemi Area Al Kharj Road, Exit 12 Riyadh, Saudi Arabia

Mobile No. +966-*********

Email Add: *******.********@*****.***

PERSONAL INFORMATION

Permanent address : Ph.1 Sitio Matalvis, Brgy. Inhobol, Masinloc, Zambales

Birthday : February 23, 1981

Birth Place : Sta. Cruz, Davao Del Sur

Height : 5 feet, 3 inches

Weight : 176 lbs.

Sex : Male

Civil Status : Married

Religion : Roman Catholic

Nationality : Filipino

DEPENDENTS

Father : Saturnino O. Majadas

Birthday : October 19, 1954

Birth Place : Palompon, Leyte

Occupation : Retired fisherman

SPOUSE

Spouse : Milyn M. Majadas

Birthday : June 9, 1985

Birth Place : Sta.Rosa, Laguna

Civil Status : Married

Occupation : Sales clerk

CHILDREN

Daughter : Jenyvee M. Majadas

Birthday : June 19,2005

Birth Place : Parañaque City, Philippines

Civil Status : Single

Occupation : Student

Son : Jhiro M. Majadas

Birthday : July 24, 2007

Birth Place : Parañaque City, Philippines

Civil Status : Single

Occupation : Student

SIBLING

Brother : Aiza P. Majadas- Sancha

Birthday : March 30, 1983

Birth Place : Patnanungan, Quezon Province

Occupation : Housewife

EDUCATION

Elementary 1988 - 1994

Masinloc Elementary School

Masinloc, Zambales

Secondary 1994 - 1998

San Andres High School

Masinloc, Zambalez

Vocational 2000 – 2002

Ramon Magsaysay Technological University

Major in Machinist

Iba, Zambales

EMPLOYMENT HISTORY

Process Improvement Specialist

United Technology of Electric Substation and Switchgear

Riyadh, Saudi Arabia

August 12, 2021 – Present

Duties & Responsibilities

Observe the people and study how to make production more efficient.

Continue how to make improvements the flow of works and maintain the clean of working place.

Supervisor

United Technology of Electric Substation and Switchgear

Riyadh, Saudi Arabia

August 1, 2019 – August 11, 2021

Duties & Responsibilities

Support the Production Manager to comply the schedule and the target date job order.

Supervise the people and giving the task to maintain the flow and to reach the Schedule of Delivery date.

Supervise the people those Assembler, Wiring and Bus bar panel to avoid any re works or mis information from the Design Department.

As a Supervisor we must be monitor and communicate to the people in a proper way of Safety and give what they need tools and materials for the panel.

Coordinate with the Mechanical and Electrical Design Department if there is any update or adjustment in the drawing to avoid happened again.

Assembly Foreman

United Technology of Electric Substation and Switchgear

Riyadh, Saudi Arabia

January 1, 2018 – July 31, 2019

Duties & Responsibilities

As a Foreman give the instructions of people according to the plan to reach the date and target for delivery.

Coordinate with supervisor for the any delay of work, materials, confusion of drawing from the design department.

Comply the quality and quantity required by the Supervisor to avoid any delay.

Monitor the people what they are doing work to avoid miscommunication between the lay out and electrical components.

Assembler

United Technology of Electric Substation and Switchgear

Riyadh, Saudi Arabia

November 11, 2010 – April 15, 2014

Duties & Responsibilities

Follow the instructions of Foreman what they given task.

As a Assembler we should follow the blue print or drawing from Design Department before we start assembly.

Check the GC of the Drawing to make it sure that the materials received from the has been correct.

Check the Dimension,Color and Lay out before Assembly.

Assembler/Wiring

Riyadh Factory for Panel Board

Riyadh, Saudi Arabia

April 26, 2008 – May 31,, 2010

Duties & Responsibilities

Follow the instructions of Supervisor or Foreman, what they given task or duty’s.

We will make Assemble the panel according to the approved drawing by mechanical and electrical design.

We must be countercheck the drawing of Mechanical and Electrical Design Layouts Dimension, Components required before they start to assemble the panel.

Press Break Machine Operator/Site Installer

Plug Electric Manufacturing Corporation

Parañaque city, Philippines

March 1,2003 - April 19, 2008

Duties & Responsibilities

As a Press Break Machine Operator we need to check the materials, specially the bending detail and most important the Safety.

Follow the Supervisor what they giving task for Priority job.

Site installer of Panel Board and Cable Tray we must be follow the blue print for which location or Advice from Site Engineer to install.

To fixed all panels s cable tray in the Standard required dimension or lay out.

SPECIAL SKILLS

●Computer literate – Intermediate

●Assembler

●Wireman

●Basic mig welder

●Basic Auto Cad

●Forklift Operator

●Overhead Crane Operator

INTEREST

●Playing Basketball

●Swimming

CHARACTER REFERENCE

Engr. Ahmed Elaalim

Production Manager

United Technology of Electric Substation and Switchgear

Riyadh, Saudi Arabia

Contact No.+966*********

Engr. Eric Bangahon

M-BAY Powering Technology Corporation

Parañaque, Philippines

Contact No.+639*********/+639*********



Contact this candidate