Name: ABHIJIT SARKAR

CONTACT PH. NO. 896******* & 628-***-****

Email: adp8xq@r.postjobfree.com & adp8xq@r.postjobfree.com

Address: GREEN PARK, MUKHERJEE BAGAN, PO.BANDEL.

DIST: HOOGHLY, WB 712123

Educational Qualification:

Passed Madhyamik Examination from WB Board of Secondary Education with 60.3%

Passed Higher Secondary Examination from West Bengal Council of Higher Secondary Examination with 50% of marks .

Passed B.Sc (pure) from Rahara RKMVCC under University of Calcutta in 1985

Passed Diploma in Electrical Engineering (DEE) in 1990 from HIT under State Council of Engineering & Technical. Education, Govt. of WB with 74% marks.

Completed certificate course of Package Equipment Engineering Training (PEET related to HVAC) from Carrier Aircon Ltd. Mumbai, in 1994.

Present job & activity :

Joined at WEAVERBIRD CONSULTANT PVT. LTD. Kolkata on 1st Oct. 2018 and since then working at ROODRAKSH MALL, GUWAHATI.

Position: TECHNICAL cum FACILITY MANAGER

Nature of Job: Looking after operation & maintenance of below mentioned equipment AND facility services too.

33KV HT VCB (3 nos) AND 2 nos 1600 KVA dry type power transformer.

Main LT Panel, Auxiliary panels e.g. HVAC, AHU, Fire Panels etc.

Floor wise Metering Panel, UPS, CCTV, Split RAC, washroom equipment etc.

Cummins Jackson make 1010 KVA DG set (standby unit).

Schindler make Elevator and Kone make escalator 7 no’s each.

Daikin make 2 x 305.0 TR screw chiller unit with connected piping and pumps, AHUs and cooling towers.

WOHR make Multi Level Car Parking (MLCP).

Fire Fighting Equipment comprising of Fire hydrant system, sprinkler system, fire detection & alarm system (FDA), jockey, diesel fire pump and portable fire extinguishers.

Pump House (PHE) consisting of transfer pump, MG filter, softner etc.

Responsible for planning and keeping critical spare for all main equipment.

Periodically inspect the log book, check list & execution as per PPM schedule.

Responsible for ensuring safety compliance of equipment for statutory obligation.

Ensure adherence to service provider SLA /Mall SOP

Effectively manage facility team (housekeeping/Security/Car Parking/ Mall Attendee) to ensure on time deliverable system.

Emphasize on Energy Management Program, saving opportunities.

Responsible for setting up the maintenance contract to ensure risk mitigation for smooth operation.

Supervision of fit out work of upcoming multiplex/stores.

In addition to the above, others related activity e.g. Govt./client communication job, in house documentation work viz. DMR, MMR, LPG & Water consumption for invoicing. Finally man management.

Previous Working Experience & Skill:

A) Worked at Gillanders Arbuthnot & Co. Ltd MICCO Division Kolkata from Nov. 2014 to Nov. 2017 as a Manager Electrical Project (@ 6.8L CTC per annum).

Project handled: i) External water supply system (EWSS) to BRC & LF3 at SAIL DSP Durgapur. WB

ii) 2 nos Gas Holder project BF & LD (Capacity of 150000 & 85000 CUM respectively) & iii) LD Gas Export System both at Tata Steel Ltd. Kalinganagar Odisha.

B) Worked at SHAPOORJI PALLONJI & Co LTD. EPC Division Kolkata from 23rd July 2007 to Oct. end 2014 as a Sr. Electrical Engineer.

Project dealt: Coal Dust Injection System (CDI) at SAIL ISP Burnpur WB. Project consortium leader was CISRI China.

C) Worked at SOVA ISPAT LTD Mejia, Bankura from July 2004 to July 2007 as an Electrical Engineer. Its 350 TPD DRI Plant (Sponge Iron & Ore crushing plant) & sister concern of Sova Group of Industries, Durgapur.

D) Worked from May 2003 to Jun. 2004 as an Asst. Manager (Elect.) in Sun Machinery System Pvt. Ltd. Howrah. It’s a machine building company. Looked after the electrical part of machines like bar bending, bar straightening machine

E) Worked from Jan. 2001 to May 2003 as an Erection Engineer under dealers of Amtrex Hitachi Appliances Ltd. Kolkata.

Nature of Job. Complete installation work of Split & Ductable AC System including interaction with architect, consultants, and clients for smooth installation. Also looked after the procurement activity, co-ordination with principal contractor, billing etc. (Testimonials are not available)

F) Worked at CUREWORTH INDIA LTD. Sauser, MP from Jan 1995 to Oct. 1999 as an Electrical Engineer. It’s a bulk drug manufacturing unit and sister concern of Uniworth Group.

G) Worked at M/s AK Gandhi Mrktg. Pvt. Ltd. (Dealer distributor of Carrier Aircon Ltd.)

Nagpur, Maharastra from Jan 1994 to Dec. 1994 as an Installation Engineer of AC system.

Nature of Job. Complete installation work of Split & Ductable including interaction with architect, consultants, clients, sub contractors for smooth installation. Also looked after the procurement activity, co-ordination with principal contractor. (Testimonials are not available).

H) Worked at BATLIBOI & CO LTD. ACR Division Calcutta from Jan 1992 to Nov. 1993 as a Technical Sales Representative (TSR) of Package AC initially & later worked as an Erection Supervisor of DX system at MES Umroi, Shillong

SKILL

1) Storing, Erection, testing & commissioning of HT Isolator, VCB’s, Oil & Dry type power transformer, Bus duct etc.

2)Storing, Erection, testing & commissioning of IMCC, PCC, MLDB, UPS, ACDB, APFC etc.

3)Storing, Erection, testing & commissioning of VVVFD, soft starter, PLC, HMI, RIO.

4)Cable tray, cabling & earthing.

5)Field instruments:. Proper storage and then erection of Pressure transmitter, Temp. Transmitter, USLT, Dial gauges, pneumatic valves, SS impulse tubing etc.

6)Installation of equipment / devices: Rotary kiln, sludge scrapper, water softening plant, electrical hoist, Hydraulic power pack, Bag filter, Wet ESP, Pumps, ID fans, etc.

7)HVAC: Erection testing and commissioning of Chiller package AC, split AC and washed air ventilation system etc.

8)Supervision of Fire protection system: Medium Velocity Water Spray System (MVWS), Fire Detection & Alarm System, Fire hydrant system & Extinguisher.

9)Provided construction power supply to various machineries viz. winch piling m/c, bar cutting m/c, tower crane, concrete mixture etc. apart from area lighting, taken care of DG set, labour hutment electrification etc.

10)Preparation of Joint Measurement Protocol as per billing schedule & executed job for client billing and simultaneous certification of contractor billing,

11)Dealing with HT bill, State Electricity Board, Electrical Inspector, other statutory Govt. bodies, Local procurement, stock inventory and at last man management.

Project Management :

. Scope understanding, visioning with client and consultants, Cost monitoring, Extra claim, Timely review of project progress, interaction with vendors/ suppliers, keep records of all relevant drawings & jobs, ISO documentation, Ensure that the execution meets the adequate safety measure by working closely with Q & HSE team to avoid safety hazards and proper maintained of statutory compliance, and finally can handle 2-3 projects simultaneously.

.

Other relevant information:-

Father’s Name : Late Ashutosh Sarkar

Date of Birth : 07.10.1965

Marital Status : Married, Having 2 sons

Total Experience : More than 29 years

Present CTC : 4.7 lakh per annum plus other perks etc.

Expected CTC : Negotiable