Seeking senior level assignments in Operation & Maintenance/commissioning
With an organization of high repute
Steag Energy Services Pvt Ltd, 2400 MW, Senior Manager Operations May’21 - Present Capacity: (4X600MW)
Steag Energy Services Pvt Ltd, 1980 MW, Senior Manager Operations Nov’18 - Apr’21 Capacity: (3X660MW)
Reliance Ultra Mega Power Plant 3960 MW, Senior Manager Operations Oct’13 - Nov’18 Capacity: (6X660MW)
Adani Power Ltd, 4620 MW, Assistant Manager Operations July’10 - Oct’13 Capacity: (5X660 MW + 4X330 MW)
GVK Power & Infrastructure ltd 469 MW, Engineer Operations Aug’07- July’10 Capacity: (469 MW CCPP)
Key Responsibilities:
Managed end-to-end operations of 660-MW Supercritical Units (Make-China) encompassing start- up, shutdown and emergency handling with a team of Field & Desk Engineers.
Coordination and communication with load dispatch center for operation of plant as per prevailing conditions and grid requirements.
Responsible for issuing Permit to work (PTW) for equipment with ensuring proper isolation & safety measures through Lockout Tagout Procedures.
To co-ordinate with maintenance team for isolation, work permits, trials, certification (Work Closure)
Involved in process safety management.
Independently identify problems, perform thorough root cause analysis and record findings.
Expertise in Desk Operation, Responsible for optimal start-up, shutdown and safe emergency handling of power plant.
Monitoring the critical parameters of the plant and find out the reason if there is any deviation from its normal value & try to resolve it.
Monitor and guide to optimize Heat rate, SOC, APC, DM make up.
Planned, organized and procured resources like fuel and water for smooth plant operations
Hands on experience of Switchyard 400KV Operation.
Highlights:
Successfully reduced the SHR & APC with specific initiatives.
Lead for startup time & oil consumption reduction.
Erection & Commissioning:
Having experience in Commissioning activities of G13E2 & its auxiliaries.
Successful completion of steam blowing activity, COD & other performance acceptance tests.
Coordinated with commissioning team as an operational support to complete the commissioning activities of 469 MW Combined Cycle Power Plant.
Team Management:
Excellent man-management, time management, team building and leadership skills.
Providing direction, motivation & training to team for ensuring optimum performance.
Post graduate diploma course in 2007 1st Division (69.45%) Thermal Power Plant Engineering
National Power Training Institute, Durgapur, West Bengal
Bachelor of Engineering (Mechanical) 2006 1st Division (67.95%)
Hemchandracharya North Gujarat University, Patan, Gujarat
Supercritical 660 MW Thermal Power Plant, Simulator training from Adani Power Training Research Institute, Mundra, India
Attended training of Alstom GT 8C, GT 13E2.
Completed 469 MW combined cycle power plant operation training by Alstom.
Languages Known : English, Hindi & Gujarati
Date of Birth : 5th April 1985
Permanent Address : 29, Dhanyata society, Vastrapur railway crossing,
Satellite, Ahmadabad - 380015.
Passport No. : R4032407, Valid 21/09/2027
Notice Period : 3 Month ( Negotiable)
Skype id : bhavesh894
Place:
Date: (BHAVESH K. PARMAR)
A competent professional with 15 years of quality experience in Power Plant. Presently associated with 4 * 600 MW Steag Energy Services Pvt Ltd as a Senior Manager. Previously worked with Supercritical 3* 660 MW Steag Energy Services Pvt Ltd as a Senior Manager, Supercritical 6* 660 MW Reliance Power Ltd as a Senior Manager, Adani Power Ltd as an Assistant Manager 4 * 330 MW & Combined cycle power plant 469 MW GVK power & infrastructure Ltd as an Engineer.
Executed various roles such as Commissioning Engineer, Operation Desk Engineer, Master Desk Engineer, Unit Controller, Commercial Load Manager and presently working as a Shift In charge.