Post Job Free
Sign in

Site Engineer Construction Manager

Location:
5th arrondissement of Paris, 75005, France
Posted:
February 15, 2022

Contact this candidate

Resume:

CURRICULUM VITAE MANAGEMENT DATA JAHANZAIB KHAN

NAME JAHANZAIB KHAN

PRESENT POSITION Site Engineer (Post tensioning and Concrete Works) EDUCATION DAE. Civil Engineering from

Govt. College of Technology, D.I.Khan, Pakistan.

SPECIALIZATION Structural Pre-stressing Post tensioning and Concrete Works YEARS OF EXPERIENCE 11 Years

Email: ***********@*****.***

Mob No: +966*********, +923*********

WORK SUMMARY

. DAE (Civil) having 11years of practical experience in pre-stressing pre-tensioning, post tensioning and concrete works (i.e. I girders post tensioning, Segmental box girders post tensioning, Cast in-situ box girder post tensioning, precast members pre-tensioning and grouting work for post tension structure) . Concrete works for different structures ( i.e. Flyover bridges, Wadi bridges,RCBC,RCPC, Slope protection, Grouted riprap,Irish crossing, Retaining walls, Concrete Pilling,Precast T girders,Precast I girders.

. Currently working with Al-Ayuni Investment and contracting Company as Site Engineer for stressing work and concrete works for different projects in KSA. Summary of Projects

S.NO COMPANY PROJECT DESIGINATION LOCATION

1 Al-Ayuni Investment

&Contracting Com

Majma Railway Project

(CTW400

Site Engineer MAJMA,KSA

2 Al-Ayuni Investment

&Contracting Com

Al-Qaseem Railway Project Site Engineer Qasim, KSA 3 Al-Ayuni Investment

&Contracting Com

Bisha-Aryn-Riyadh Road

Interchange Project

Site Engineer Bisha, KSA

4 Al-Ayuni Investment

&Contracting Com

Taif Hada road intersection

Project

Site Engineer Makkah

Mukarmah,KSA

5 Al-Ayuni Investment

&Contracting Com

Tabuk Madinah Expressway

Project

Site Engineer Tabouk, KSA

6 Al-Ayuni Investment

&Contracting Com

Interchanges at Second Ring

Road Madinah project

Site Engineer Madinah

Munawrah,KSA

7 Al-Ayuni Investment

&Contracting Com

Batha Quraish Intersection

with 4th Ring Road Makkah

Site Engineer Makkah

Mukarmah,KSA

8 Al-Ayuni Investment

&Contracting Com

Wadi Hanifa Segmental Box

Girder Bridge Project

Site Engineer Riyadh,KSA

9 Al-Ayuni Investment

&Contracting Com

Riyadh Interchange Project Site Engineer Naseem

Riyadh,KSA

10 Al-Ayuni Investment

&Contracting Com

Al kharj Eastern Link Project Site Engineer Al Kharj,KSA 11 Al-Ayuni Investment

&Contracting Com

Unaizah Interchange Project Site Engineer Qasim,KSA 12 Al-Ayuni Investment

&Contracting Com

Al-jouf Cement Factory

Interchange Project

Site Engineer Turaif,KSA

13 Al-Ayuni Investment

&Contracting Com

Assir Group 8 Project Site Engineer Bisha,KSA

14 Al-Ayuni Investment

&Contracting Com

Jazan University project Site Engineer Jazan,KSA

15 Al-Ayuni Investment

&Contracting Com

Sharma Tabouk Maintenance

Bridge

Site Engineer Sharma, KSA

16 Al-Ayuni Investment

&Contracting Com

Jeddah Interchange Project 3rd

Industrial City

Site Engineer Jeddah, KSA

17 Al-Ayuni Investment

&Contracting Com

Preventive Maintenance of

Quriyat road

Site Engineer Quriyat, KSA

18 Hasnain Cotex Private

Limited, Pakistan

Indus Highway Road-2

Project, From D.I.Khan to

Lakki Marawat, Pakistan

Site Engineer D.I.Khan

Pakistan

19 Zaam Trading and

Construction Pvt.

Limited

Road and Bridges

Construction Project

Trainee Engineer Lakki.Marwat

Pakistan

Prime Responsibilities are:

Fabrication of long Pre-Stressed concrete girders in the girder yard and then monitoring the transportation and launching of girders.

Supervision and monitoring post-tensioning activities of pre- stressed girders as per SFF design and AASHTO manual.

Check, approve and sign Pre-Stressed Girder design.

Inspection of overall design in Co-ordination between multiple disciplines.

Review comments and approval of shop drawings.

Preparing technical reports.

Making arrangements for meetings and ensuring that proceedings are recorded and communicated.

Study and evaluation of the project requirements and scope.

Monitoring the progress of the project and timely completion.

Acts professionally and with due diligence to safe guard the interests of the company.

Preparation of weekly and monthly progress reports for onward submission to the Construction Manager.

Supervise/Control safety at all the working site.

Liaise with Supervisors, Foreman and Consultant’s Engineers. Input to the Planning Engineer as required.

Conduct Training Courses for all new Junior Staff as required.

Assist the Construction Manager with meetings with Client/Consultants as required. Recommend innovative ideas to the Construction Manager. Special Technical Skills

Pre-stressing coefficient and formula of several bridges and Silos. Reading and comment in bridges design Post- tensioning works and structures.

Increment Launching Method

Maintenance, Qualities Control

Accounting the quantities for the bridges materials.

Profiling, ducts placing-anchorages, Strand Stressing, Threading, All types of grouting, Expansion joint, Fixing, Pot Bearings, Neoprene, Pads, installation. PRACTICAL EXPERIENCES

March 2012 – To date

Company: AL-Ayuni Investment and Contracting Company, Saudi Arabia. Designation: Site Engineer (Structural Pre-stressing Post tensioning and Concrete Works) Projects:

1. Majma Railway Project (CTW400), which includes the construction of Railway line and all Bridges (i.e 6-Camel crossing, 10-UR, 4 OR bridges, and 11-OW Bridges). Fabrication of long Pre-Stressed concrete girders in the girder yard and monitoring the transportation and girder erection at bridge.

2. Al-Qaseem Railway Project, which includes the construction of Railway line and all Bridges (i.e Camel crossing, UR, OR bridges, and OW Bridges). 3. Bisha-Aryn-Riyadh Road Interchange Project, which includes the Construction of Interchange Bridges.

4. Taif Hada road intersection with Ibrahim Jaffali road project which include the construction of Interchange Bridges.

5. Tabuk Madinah expressway project which includes the construction of road and all bridges (interchange, camel crossing, OW bridges). 6. Improvement of interchanges at second ring road Madinah project which includes bridges and roads.

7. Preventive Maintenance of Quriyat road which includes bridge and road. 8. Batha Quraish intersection with 4th ring road Makkah which includes interchange bridges, culvert and road.

9. Wadi Hanifa segmental box girder bridge project which includes 514m long segmental bridge and road.

10. Jazan university project which includes 2 building Nursing College and Business College. Each building have 3 stories and 1000m2 area. 11. Riyadh Interchange Project which includes interchange bridges, 169m long box girder fly over bridge and wadi bridges

12. Al kharj eastern link Project which includes interchange bridges, roads and box culverts

13. Unaizah Interchange project which includes interchange bridge and roads 14. Jeddah interchange project 3rd industrial city which includes interchange bridge,box culverts and roads

15. Sharma Tabouk Maintenance bridge which includes bridges and roads 16. Preventive Maintenance of Quriyat road(1302) which includes bridges and roads 17. Al-jouf Cement factory Interchange project which includes interchange bridge and roads

18. Assir Group 8 Project which includes bridges and roads. October 2010– To March 2012

Company: Hasnain Cotex private Limited, Pakistan

Designation: Site Engineer

Project: Indus Highway Road-2, From D.I.Khan to Lakki Marawat, Pakistan This Project was Construction of Highway Road of around 150 Km which includes the construction of Road and Several Bridges.

Prime Responsibilities were

Overall management of the Construction work, approvals of submittals, Co-ordination with the Client, Project planning and Cost Control.

Check, approve and sign Road and Bridges design.

Fabrication of long Pre-Stressed concrete girders in the girder yard and then monitoring the transportation and launching of girders.

Check, approve and sign Pre-Stressed Girder design.

Supervision of the Construction operations to implement the designs properly.

Review comments and approval of shop drawings.

Preparation of weekly and monthly progress reports for onward submission to the Construction Manager.

Check and Approve material and machinery suppliers invoices for Construction Manager Signature.

Check and ensure that site work correctly reflects the agreed designs.

Developing and implementation of Project planning and cost control system.

Management of all Construction activities.

Providing the proper safety during all project activities.

Cost calculation for both Road and Bridges construction work.

Proper planning to achieve the production required by site operations.

Approval of daily work schedule from consultants.

Developing quality and safety standards to client and consultants standards. . Ensure profitability of projects and timely receipt of amount due.

Liaise with Supervisors, Foreman and Consultant’s Engineers. Input to the Planning Engineer as required.

Controlling of all the subcontractors working with Hasnain Cotex Pvt Limited. Motivation of Construction team to meet the production demand. Worked As Trainee Engineer: From

• July 2010 To September 2010

• June 2009 To September 2009

• June 2008 To September 2008

Company: Zaam Trading and Construction Pvt. Limited, Pakistan. Project

: Road and Bridges Construction Project.



Contact this candidate