pg.*
AmshajSulaiman
LandSurveyor
Kerala,India
Mob:+917*********
Email:*************@*****.***
OBJECTIVE:
AHighlySuccessfulLandSurveyorwithover16yearsofexperienceinmanagingallandsurveying activitiesandstaffing;responsibleforensuringbestpracticesarefolowedandqualityassurancegoals areobtained;aswellasparticipateindevelopmentofbestpracticesasrelatedtolandsurveying. KEYQUALIFICATION:
• 16yearsofexperienceinsurveying&levelingaspectsforvariousstagesofcivildesign andconstructionofhighways,Buildings,Reservoir&infrastructureprojects.Sincethe majorpartofemploymentwiththeContractor,thepracticalefficiencyisbeingsignificant element.TheareasofexpertiseincludeComplexitySetting-outs,JointSurveys,Basic programming,AsBuiltSurveys,QuantitiestakingandConstructionMethods/Activities.
• Plan,manageandmonitortheimplementationofcorrectQA/QCproceduresareinplace forsurveysection.Identifyingerrorsandhelpsurveyorsintroubleshootingareas, ensuringzerodefectsinsettingouts,colectandreviewsurveydata,maintenanceand inspectionofsurveyequipmentandpreparingandmaintainingcalibrationscheduleand records
• Establishandachievelongtermgoalsandobjectives
• ConversantinalHighwayGeometry&Settingoutactivities
• Experiencedinlatestsurveyinstruments(Leica,Nikon,Sokkia,Topconetc.)
• FulyconversantinConstructionWorksi.e.Roads,Bridges,PipeLines,&Buildings.
• ExperiencedinAutoCADCivil3DSurveyprogram,EWXPprogramforCalculatingEarth WorkQuantity&AutoCAD(upto2018versions)
• Abilitytoplanandmanageworkloadsandpeopleinamulti-project/multi-disciplined environment.
• Highlymindfulofsafetyandsecurityprocedures;Usesequipmentandmaterialsproperly. EDUCATIONALQUALIFICATIONS:
2002 SurveyorNCVT-RecognizedbyKeralatechnicalboard,India(AttestedbyUAEEmbassy) 2005 DiplomainCivilEngineering–LunaEngineeringtechnology,India.(AttestedbyQatar Embassy)
2002 AutoCAD2002
2009 CivilDraughtsmanAutoCAD–2D(NCVT)(CorrespondentCourse) 2011 Civil3D–SurveyProgram
DrivingLicenseforLightVehicle–Qatar+Saudivalid
InstrumentUsedforSurvey(GPS,TotalStation&DigitalLevelInstruments Sokkia,Lieca,Topcon,Nikon&Trimble
Software,whichisusingwithSurveyinstrument
SokkiaLinkversion1.03,LeicaGeoofficetool,&TopconLinkV8,GNSSSolution pg.2
Personalinformation:
DATEOFBIRTH : 19-05-1983
LANGUAGEKNOWN : ENGLISH,HINDI,ARABIC,TAMIL&MALAYALAM LICENSE(QATARVALID) : 283********
RELIGION : ISLAM
PASSPORTNUMBER : T2477645
DATEOFEXPAIRY : 09-02-2029
MARITALSTATUS : MARRIED
VISASTATUS : CancelledfromSaudiArabia
EMPLOYMENTRECORD
12/2020to12/2021 SCANLANDSURVEY&ENG.LLP.KERALA,INDIA PositionHeldSr.LandSurveyor
Project:-
GailGasLineProject(UnnikulamtoThamarasseriJn.).
02/2018to11/2020 CADDELLCONSTRUCTIONCo.KSA
PositionHeld SurveyEngineer
Project:-
U.S.DiplomaticMissionCompound,Dhahran,SaudiArabia–SPXBuildingConstruction
(B+G+2),NOBBuildingConstruction(B+G+3)withTunnel,ParkingEtc. 08/2016to11/2017 ALBAWAKIRUNICONGROUPLLC,QATAR
PositionHeld SeniorLandSurveyor
Projects:-
NewOrbitalHighway&TruckRoute(P023)C-4–ElectricalCabling&IndoorSubstation Construction
MarbleFactory–NewIndustrialArea–PlotA1512–548–G+2Building&Factory Construction
KharamaWaterLineNetwork-AlSakhmaZone–70
pg.3
05/2015to08/2016 THEMEENGINEERINGSERVICEPVTLTD,Jaipur,India PositionHeld SurveyEngineer
Project:-
Authority'sEngineerForSupervisionOf(A)Improvement&AugmentationOf Thanjavur-PudukottaiSectionOfNH-226To2LaningWithPavedShoulders FromKm0.000ToKm55.228(ExistingChainageFromKm0.000ToKm56.460)
(TotalDesignLength55.228
11/2013to05/2015 ALCATROCKBLASTINGENGINEERINGWLL,DOHA,QATAR PositionHeld ProjectSurveyor
Projects:-
RockBlastingatALUDEIDAIRBASEAPOPROJECT(Z-105-25),QATAR
RockBlastingatGREENLINEUNDERGROUND–ALMESSILAMETROSTATION,QATAR
RockBlastingatCOASTGUARDBASEEXPANSIONOFTHEMAINNAVIGATIONCHANNEL& TURNINGBASIN,QATAR
OfficeBuilding,BRingRoad,Doha.–ClientofMrAliMuhammedJaidah 11/2011to08/2013 RANIINFRASTRUCTUREDEVELOPMENTLIMITED,SRILANKA PositionHeld SeniorSurveyor
Project:
REHABILIATION/IMPROVEMENTSTOB269ROADFROMMANKULAMTOVELLAMKULAM(KM 0+000TO37+810),SRILANKA
IMPROVEMENTSOFKANDALAMALARESERVOIR–IRRIGATIONDEPARTMENT,SRILANKA Client: RDA(ROADDEVELOPMENTAUTHORITY)&IRRIGATIONDEPARTMENTSRI LANKA
Consultant IMCWORLDWIDE,ECLENGINEERS&EMLENGINEERS
01/2011to11/2011 ISUPROJECTSPVTLTD,HYDERABAD,INDIA pg.4
PositionHeld SeniorSurveyor
Project:
SixLANINGOFVADAKKANCHERYTOTHRISSURSECTIONOFNH–47(CONTRACT PACKAGENO.NS2/BOT/KL-3)(Km:257.000toKm:264.400)
Concessioner KMCConstructions
Client: NationalHighwaysAuthorityofIndia
Consultant HalcrowEngineeringConsultancy(PMC)
08/2009to08/2010 ROWADALJAZEERAHOLDINGCOMPANY,KSA. PositionHeld LandSurveyor
Project:
DUALISATIONOFABOQAMEESPORTROAD:-Constructionof6LinesRoadsandBridgewith Flyover
Client: KingdomOfSaudiArabiaMinistryOfTransport
Consultant: DARALRIYADHConsulting.Riyadh,KSA
04/2007to02/2009 HEILBRONNCONTRACTINGCOMPANY.LLC,UAE. PositionHeld LandSurveyor
Projects:-
EMIRATESHEADQUARTERS:-InfrastructureWorks
Client: FlyEmirates Consultant :CansultManualsonEngineering
JUMEIRAHISLANDS&LUXUARYVILLAS:-InfrastructureWorks Concessioner :L&TConstruction Consultant:ParsonInternational
EMIRATESSPORTS(RUGBYSTADIUM)-EarthWorks&InfrastructureWorks Client : FlyEmirates Consultant : DesignConcepts
PROPOSED(B+G+7)DKPROPERTIESatPLOT394-516(E183),DUBAI:-Construction 03/2003to03/2007 ROADBUILDER(M)SDNBHD,KOLALAMPUR,MALYSIA PositionHeld Surveyor
Project:
Upgradingofstatehighway(KSTP),KERALA,INDIA
Client: KeralastateTransportproject(KSTP)
Consultant RitesIndiaPVTLTD
Importantresponsibility:-
Monitoringatsitevarioussurveyingfunctionsincludingtopographysurveys, constructionsurveys,etc.
pg.5
Dataprocessingsuchaspreparationofaldata,asbuilt,charts,plots,maps,records, anddocumentsrelatedtosurveys.
Concentrate&involvesitesurveyworkssuchasmarkingfortheAnchorBolts,Embed plateinstalationwithalignment,boundarylines,excavations,footing,gridline,slab edge,manholes&internalinfrastructures.
Instructsurveycrewsincludingfivesurveytechniciansinthefieldlayoutofthemore difficultconstructionprojects,inreplacinglostsurveymonuments,insettingproperty cornersoncitylandfromlegaldescriptionsandtitleinformation,andinperforming otheraspectsofsurveywork
CoordinatewithUSDiplomaticconsultancy&OBOConcernedpersonsas requirements
PreparetheSlabFlatnessreportasperthespecificationandsubmitthesameto clientasperschedule.
Reviewandanalyzeworkmethodstoincreaseefficiencyandproductivityandprovide inputintothewritingofperformancestandards.
Computegeodeticmeasurementsandinterpretsurveydatatodeterminepositions, shapes,andelevationsofgeomorphicandtopographicfeatures.
Preparetheblastingprogramdrawingandsubmitthesame,Participatedinpreparation ofengineeringservicesproposalsincludingthecalculation/estimation oftime schedulesandcostsoftheproposedwork.
Markingtheboundarylineforblasting,surveyaftereveryblastingandpreparethe sketch,
Physicalstockmeasurementforcrushedmaterials,
Preparefinalquantitydrawingfortheblasting&physicalstocksbyusingAutoCADCivil 3DProgramandsubmitthesametoclient.
Monitoringthesurveycrewforsettingoutal(boundarylimitsforIdentification, excavationpurpose,roadcenterline,kerblines,&culverts),surveyfor(NGL,afterexc. levels)keeptheproperdocuments,checkingthelevels(Subgrade,GSB&WMMLevels)
Technicalactivitiesbesidesco-ordinationintercommunicationbetweenConsultant andClientOffice.
Keepdetailedandaccuraterecordsofsurveydata.
Iherebydeclarethataltheinformationfurnishedaboveistruetothebestofmyknowledgeandbelief. PLACE AMSHAJS
DATE (SurveyEngineer)
pg.6