AutoCAD & MS Office
*************@*****.***
Room 5, Flat No : 207, My
Govinda’s Restaurant Building,
Dubai, UAE
sabeersalamkk
SKILLS
LANGUAGES
English
Professional Working Proficiency
Hindi
Professional Working Proficiency
Malayalam
Native or Bilingual Proficiency
WORK EXPERIENCE
Electrical Engineer
VB Engineering
08/2019 - 12/2021, India
Building Contractor
Achievements/Tasks
Advised for planning & quantity estimation wherever is necessary. Guided Draftsman to prepare shop drawing
Co-ordinated between Civil, Electrical & Mechanical Engineers to avoid clashes between the Building Construction services.
Managed 'Installation of Switch gears, Electrical Wiring of Buildings (light & Power), LV & Instrumentation Cable glanding and Termination, LV Cable laying & dressing and works related to 'Lightning Arrestor, Cable Tray laying, Grounding, Fiber Optic Cable, Fire & Safety, etc.' ' Pre - commissioned the activities within Substation building. Electrical Engineer
Nasser Al Hajri Corporation
05/2017 - 07/2019, KSA
Industrial Contractor
Achievements/Tasks
Carried out planning & quantity estimation wherever is necessary. Guided Draftsman to prepare shop drawing
Coordinated Construction activities in PDC Building of Air Separation unit (Air Products - Saudi Aramco) at IGCC Project, Jazan Economic City, Saudi Arabia
Managed 'Installation of Substation Switch gears, Installation of External Lighting System (Pole mounted, Ceiling mounted, structural mounted), Electrical Wiring of Substation Building (Lighting & Power) and Transformer erection, MV, LV & Instrumentation Cable glanding and Termination, LV, MV & HV Cable laying & dressing and works related to 'Lightning Arrestor, Cable Tray laying, Grounding, Fiber Optic Cable, Fire & Safety, battery Installation etc.' '
Pre - commissioned the activities within Substation building. Assistant Engineer (Contract Basis)
KSEB Ltd. - 66/11 kV Substation
07/2015 - 04/2017, India
Power Transmission Center
Achievements/Tasks
Inspected 'Yard Equipment, Trip Circuit Healthy (TCH) Indication of feeder panels, HV & LV Switch Gears including Control Wiring' etc. and checked 'Temperature and Oil level of Transformers, Leakage current of Lighting Arrestors, Voltage of Battery Chargers etc.' Prepared Reports of 'Voltage & Current Reading for 66kV & 11kV Lines, feeders Maintenance work, Interruptions of 66kV & 11kV Side, Voltage & Specific Gravity of Batteries etc.' Coordinated with the different section offices sub engineers as well as within the substation team. Maintained log of daily routine and emergency operations with line outages and weather conditions. Asst. Electrical Engineer
VB Engineering
07/2013 - 07/2015, India
Contracting Company
Achievements/Tasks
Planned & Estimated Quantities for Light & Power System Works. Prepared Shop Drawings as per Site requirements.
Executed Light and Power System including Cable Glanding, termination and Busbar Grounding. Construction Site
Supervision & Project
Management
Quality Checking of
Electrical Works (IEC, NEC,
NFPA,NEMA Standards)
Sabeer Kotta Kunnummal
Electrical Engineer
B.E Electrical graduate with 8 years experience in different sectors with a remarkable experience of 2 years from Saudi Arabia's leading Industrial Contractor.
ACHIEVEMENTS
Certificate of Appreciation from SAIPEM (2018 - 2019) For the outstanding contribution to the successful energization of substation 007 of Jazan Integrated Gasification Combined Cycle Project.
Certificate of Recognition from SAIPEM - 2 Times (2018 - 2019) For the successful achievement of assigned tasks as E&I Engineer of Jazan Integrated Gasification Combined Cycle Project. EDUCATION
Bachelor of Engineering in Electrical
Anna University, Chennai
2009 - 2013, Chennai, India