JIMMY SSEBUFU
Phone: +256-***-***-***
Email: ************@*****.***
Address: Kawempe, Lugoba, Kampala, Uganda.
PROFESSIONAL SUMMARY
Results-driven electrical engineer with a graduate degree and about 4 years of working experience in the engineering sector as Electrician and Project engineer. Possesses a valid class B ERA installation permit (Permit Number: ERA/EIP/CLB/020/4041). Currently pursuing a Post graduate diploma in Project Planning and Management at UMI. WORK EXPERIENCE
DATE, DESIGNATION AND EMPLOYER RESPONSIBILITIES
FEB 2020-Date,
Projects Coordinator,
CHAPA GENERAL ENTERPRISES LTD
• Design and draw electrical
installation drawings for Power
Lines and Building Services Projects
• Perform Load flow analysis,
Transformer sizing, cable selection
and sizing, sag calculation
• Prepare Engineering Design
reports, construction Methodology,
Procurement Plan, Implementation
schedules
• Prepare bidding documents, BOQs
• Directly perform procurement of
Materials, Equipment and tools,
check compliance with the standard
requirements
• Perform Financial Appraisals and
Scope Appraisals at every stage of
implementation
• Prepare Mobilization schedules,
Interim payment Certificates
• Attend FATs for Materials
• Attend Progress review meetings
with sake holders
• Direct Supervision and coordination
of construction works during project
implementation
• Attend site inspections, handovers,
Pre-commissioning and
commissioning meetings and
processes
• Schedule Material issuance and
Perform material reconciliations
• Perform onsite quality checks and
material audits
Aug. 2019 –Feb. 2020,
Projects Engineer,
SOLUTIONS ON POINT LIMITED
• Sizing of solar systems
• Design electrical installation
drawings for building services
and solar PV and SWH systems
• Conduct onsite energy audits
• Supervise the installation of solar
systems
• Conduct energy efficiency
training to Clientele
• Prepare Bids
• Perform direct procurement of
equipment
• Supervise electrical installation
works onsite
Nov 2019-Date
Sales Engineer
EXPONENTIAL ENERGY SOLUTIONS LTD
• Perform direct sales for Solar PV,
Capacitor banks, AC systems and
SWH system
• Preform Cost Benefit Analysis for
Renewable Energy Sources for
facilities
• Conduct site assessment, design
and draw installation drawings
• Coordinate installation of systems
at Facilities
• Negotiate with Clientele and
Suppliers
July 2018- August 2019
Site Engineer
CEYLEX ENGINEERING (PVT.) LTD
Interpret electrical drawings as
approved by the consultants
Supervise Power lines
construction works in the field
Perform Quality checks to
ensure that construction is as per
approved structural drawings
and standards at all stages (i.e.
Pegging, Pit excavation, Pole
transportation, Pole offloading,
Pole positioning, Pole erection,
Plumbing, Ramming, aligning,
dressing, stringing, sagging,
Jumper closing, Earthing works,
Switch gear installation,
transformer wiring)
Advise stake holders on
inevitable design changes
Manage and coordinate the
construction teams
Ensure safety through conduction
of tool box talks
Plan Daily works and prepare
daily working reports
Prepare Material requests and
ensure timely delivery of
materials
Organize and plan for
deployment and demobilization
Perform on Site Material Audits
Prepare monthly progress
reports
Endorse or disapprove
subcontractors’ invoices
Consent for wayleave and
engage stake holders where
need be
Attend FATs for Materials
Attend Power Lines Inspection
Arrange for shut downs
Capture as built drawings using
GPS
Attend commissioning and pre
commissioning meetings
May 2017- August 2017
Electrician-Internee
Master Power Systems Company Ltd-Kampala,
UG
Interpret Electrical Installation
Drawings
Perform hands on electrical
installation works including
Chizzling, Piping, Lay of Cable
trays and Truncking, Distribution
boards
Perform Earthing works for
generators and transformers,
Install Lightning arresters and
copper tape
May 2016-September 2016
Electrical Engineer-Internee
Rural Electrification Agency-Kampala, UG
Guided Design of Power Line
networks in AutoCAD
Prepare DAILY AND Monthly
Progress reports
Coordinate contractor’s works
Supervise Power lines
construction works in the field
Attend progress review meetings
Attend Factory Acceptance Test
exercises
May 2016-July 2016
Electrical Engineer-Internee
West Nile Rural Electrification Company, UG
Perform Pole servicing
metering and emergency
disconnection of loads
Switching on the network,
Operation of LBS, Auto recloser
Bush clearance
Fault checks and power
restoration
July 2016-September 2016
Electrical Engineer-Internee
Haso Engineers Company Limited, UG
Engaged in Power line
construction works including;
Pegging and Bush clearance
Pit excavation
Poles offloading and positioning
Pole erection, Plumbing,
ramming and backfilling
Pole drilling and dressing
Installation of stay assemblies
Cable and conductor stringing
Sagging and Jumper closing
Transformer Earthing, installation
of switch gears, LBS, Auto
recloser, ABS, Dropout fuses
Transformer wiring, installation of
surge arresters and arcing horns
OTHER EXPERIENCES
September 2019- May 2020
Coordinator- Electrical
Isima Electrical Consultant Ltd
November 2020- June 2021
HAMLET GROUP
Engineer -Electrical
Coordination of Power Lines
Construction Works
Conducting Quality Checks
Conducting Site Audits
Conversion of Mulago Hospital
Kitchen from Biomass to Electric
SKILLS
SKILL LEVEL SKILL LEVEL
MICROSOFT OFFICE Good
PROJECT MANAGEMENT Good
AUTOCAD Good
ELECTRICAL
INSTALLATION
Good
COMMUNICATION Good
Digi silent Good
Mat lab Good
Html & CSS Good
Bootstrap Good
PLS CAD Beginner
EDUCATION
YEAR OF COMPLETION CERTIFICATE AQUIRED AND INSTITUTION MAY. 2018 Bachelor of Science: Electrical Engineering Makerere university - Kampala, Uganda
DEC. 2013 Uganda Advanced Certificate of Education Jinja senior secondary school -Jinja, Uganda
DEC. 2011 Uganda Certificate of Education
St. Noa Mawaggali SS -Jinja, Uganda
DEC. 2007 Primary Leaving Education
MM Wanyange Primary School-Jinja, Uganda
LANGUAGES
LANGUAGE PROFICIENCY
English Fluent
Luganda Native
Kiswahili Basic
ACCOMPLISHMENTS
I am privileged for having received an opportunity to work on various projects in power lines construction both using concrete and wooden poles in the capacities described above. I have also gained vast experience in building services, sales and coordination, below are some of my accomplishments
• Under Ceylex Engineering (Pvt.) Ltd, as site engineer, I directly Supervised and directed the works up to commissioning, for the construction of over 120km of 33kV concrete pole power lines Under IDB III, Lot 3a in Lira, Kole, Agago, Pader, and Kitgum districts along with the related LV networks up to commissioning
• Under Chapa General Enterprises Limited, I supervised the construction of over 80km of 33KV wooden pole power lines and the related low voltages in various regions of Uganda under ERTIII 3STS, Lot 2 and 3, ERTIII 10STS Lot 2, OFFGRID Projects Lots 1,2,3 and Variations in various regions in the country.
• Under Haso Engineers Ltd, I was Part of the team that constructed the 30 km of the 33kV wooden pole power line from kizira-nfumbi to the proposed kabaale Airport in Hoima district
• Under Master Power Systems Ltd, my team and I worked on the electrical industrial installation for Toyota Uganda Building in Namanve, Wild Life authority building at Kanjokya street-Kamwokya, Church house and Kyambogo University Modern Teaching Facilities.
Participated in Total Energy’s Training while at Makerere University REFEREES
1. K.A. Weerarathne (Srilanka)
Project Manager, Ceylex Engineering (Pvt) ltd
Tel: +256(0)776279126, *************@*****.***
2. Eng. Martin Amaruma (Uganda)
Resident Engineer, Rural Electrification Agency, Northern Uganda, IDB1 Tel: +256(0) 752363781, +256(0)772363781
3. Eng. Gerald Kisekka
Lecturer Makerere University
Tel: +256(0) 774968930