VELARDE, RAFAEL RAE CARMELO B.
Contact No. +639*********
E-mail Add.:
**************@*****.***
SUMMARY OF QUALIFICATIONS
Having 8 desirable years combined experience in Industrial Engineering, construction of Coal Fired Power Plant Project, Liquefied Natural Gas (LNG) Project, Malls and Warehouses. Have an experienced in Heat Tracing Installation.
Have an experience in Estimating and computing E&I schedule of works. Have an experienced in hands-on trouble shooting of electric motors, quarterly checking of electrical system and monitoring of manpower and procuring materials needed in the plant. Leads project coordination with designers, vendors, subcontractors, procurement department, site construction team for installation, testing and commissioning, verification of technical specifications, interpretation of construction and technical drawings, verification of cost implications as per contract, and update project progress status report. Leads in punch listing, rectification and modification of installed electrical works prior to Start- Up Commissioning.
Experienced in 2D Basic Auto Cad works
Experienced in materials estimation for duct bank installation, heat tracing, grounding system, FDAS, CCTV, PG/BM, Auxiliary and Power House System. Had a tough aspiration to learn more in the field of Electrical Engineering. Time-efficient, flexible, results-driven, self-motivated and a team-player. Proven leadership and management skills.
Can work under pressure & with minimum supervision. He is qualified Electrical Engineer
WORK EXPERIENCES
Sept. 2017 – Oct. 2021 KCC Property Holdings Inc.
Project: Mall Branches, Warehouses, Terminals
Sr. Electrical Engineer - Construction Management Group (CMG) Duties and Responsibilities:
2017 - 2018: Electrical and Instrumentation, FDAS and auxiliary supervision of maintenance facilities of the mall as well as the construction / renovation itself. 2019 - 2021: - Construction Management of Mall Branches and Warehouses. We do BOQ of electrical system, power house including transformer and Genset, PGBM, Auxiliary, FDAS, CCTV and Grounding system which includes lightning arrester. Estimate of materials, monitoring of estimated time arrival of materials. Weekly coordination meeting with contractors and department involve. Evaluate progress billing report subject for approval. Evaluate specification of device and equipment to be installed prior to approval of the owner. Create As- built plan based on the actual punch listing subject for rectification and approval of the owner. Oct. 2016 - Sept. 2017 QPIGS Livestock Corp.
Project: Piggery
Design, Electrical Engineer - Engineering Department Duties and Responsibilities:
Supervised electrical installation works and electrical materials estimated needed in the design as well as FDAS installation. Estimate the materials including labor cost based on approved and latest plan. Create punchlist subject for turn-over the project. Contractor to rectify, owner to approve. April 2016 – Oct. 2016 Rell and Renn Fishing Inc.
Project: Holy Child College in Information Tech.
Project Development Supervisor, Proj. Devpt. Section Duties and Responsibilities:
Ensure that the electrical design, lay-out and specification of materials were synchronized in the latest Philippines Electrical Code (PEC).
Provide electrical material and equipment estimates needed in the project. Supervise the electrical installation, CCTV system and Telephone system. Prepare Electrical man-hour and schedule of works. Prepare daily monitoring schedules for progress and completion of works. Ensure the Works being supervised are being carried out in a safe and controlled environment. Responsible for raising purchase requisition (PR) of electrical materials to complete relevant projects and provide technical assistance to procurement department. May 2015 – January 2016 Atlantic Gulf and Pacific (AG&P) Project: Yamal Liquefied Natural Gas Project
E & I Field Engineer, PMO Department
Duties and Responsibilities:
Ensure that the project quality plan, construction specifications for electrical equipment and systems are Complete, consistent with the design and fit with the project requirements. Conduct visual Inspection of E&I materials received from the vendor and prepared / raised RFI with data sheet itself prior to QC inspection.
Prepare Electrical and Instrumentation schedule of works per discipline for those modules and look ahead work plan coordinated with the Planning Engineer.
Participate and actively follow-up electrical construction and commissioning activities and attend site coordination meetings with the client.
Prepare E&I man-hours and schedule of works.
Review and verify instrumentation and electrical and heat trace drawings prior to installation. Prepared an extensive spread sheet program to monitor the actual cable lengths installed versus on design lengths, which also serves as the monitoring.
Managing and supervising the installation of electrical, heat tracing system and instrumentation works. Ensure the Works being supervised are being carried out in a safe and controlled environment. Prepared Material Take-Off (MTO) for all Modules included Lighting System, Heat Tracing System, Grounding System and Instrumentation.
Raised RFI (Request for Inspection), data sheet and packing list for those electrical and instrumentation materials received prior to inspection preparation for the upcoming installation. Interprets schematic and connection diagrams and other technical drawings. Raised PR (Purchase Requisition) for those consumable materials needed in temporary electrics. Review and check P&ID’s Isometric drawings prior to installation. Estimating electrical materials and equipment added due to Design Change Notice (DCN). January 2015 – April 2015 KWM Philippines
Project: 1 X 200MW Sarangani Power Plant Project
Sarangani Electric Cooperative (SEC) Unit 1 –
On Going Project
Instrumentation Site Engineer, Instrumentation Department Duties and Responsibilities:
Managing and supervising the installation of conduit and Perforated Tray in Boiler and STG Estimating conduit materials needed in Boiler area. Prepare daily manpower schedule / histogram. Prepare an extensive spread sheet program for the conduit and perforated tray installed in Boiler area. Consolidate the BOQ of conduit and junction boxes needed in Boiler area. Review and verify instrumentation drawings prior to installation. Provide punch-listing subject for rectification prior to turn-over the project. March 2013 – December 2014 Leighton Contractors Philippines Inc. (LCPI) Project: 2 X 150MW Davao Power Plant Project Unit – Therma South Energy Units 1&2 – FINISHED
PROJECT
Black and Veatch – Leighton Consortium (BVL)
Electrical Engineer (Asst), M.E.P.F. Department
Duties and Responsibilities:
Supervision the installation of Duct Bank works, installation of Grounding works, and testing of Grounding System.
BOP Electrical System Inspection with QA/QC Engineer. Prepare monitoring schedules for progress and completion of works by subcontractors. Prepare manpower histograms and daily monitoring of subcontractor manpower.Assist in the coordination with QA/QC for the WPN notification for inspection and testing of works in accordance with the ITP’s. Conduct monthly testing of portable electrical hand tools and power leads ensuring they are safety compliant. Tag those tools and log all test results.
Maintain a schedule for all MEPF Plant and Equipment. Ensure the Works being supervised are being carried out in a safe and controlled environment. Monitor the installation of the BOP electrical systems in the technical buildings and structures. Estimating materials needed for duct bank and grounding system. Coordinate operation team for any actions performed at site including the materials and equipment used subject to charges to third parties.
Consolidate BOQ of Electrical materials needed in the Plant as per Contract. Punch listing all the electrical installation as well as the instrumentation / FDAS prior to commissioning. Review and verify constructions drawings and specifications prior to releasing to subcontractors. Interprets schematic and connection diagrams and other technical drawings. Responsible for raising purchase requisition of electrical materials through Maximo System to complete relevant projects and provide technical assistance to procurement department. Prepared an extensive spread sheet program to monitor the actual cable lengths installed versus on design lengths, which also serves as the monitoring for all circuits pulled, tested and terminated, and generate project progress report status.
Conduct site walkthrough to monitor all works done and those works that needs rectification prior to testing and commissioning.
June 2012 – Feb. 2013 Jomary Pulp Packaging Industries (JPPI) / ABFI Export Quality Products
Maintenance Engineer, Engineering Department
One of the biggest suppliers of an export quality of pineapple trays and egg trays in the Philippines, and a sister company of Ana’s Breeders Farm Inc.
Duties and Responsibilities:
Monitoring the electrical supply balance in the plant. Quarterly check-up the electrical system, included the motor control panel, electrical room and auxiliary system.
Support the procurement for purchase the electrical materials that needs to be replaced. Monitor the operation manpower. 2D basic AutoCAD works. Trouble-shooting of electric motors.
EDUCATIONAL BACKGROUND
Degree: Bachelor of Science in Electrical Engineering Western Philippines University, Puerto Princesa City, Philippines April 2011 Project Feasibility: Electrical System Design of WPU-Dormitory (Grade – 1.5) TRAININGS AND SIMINAR
● OJT at Coral Bay Nickel Company
o Riutuba Bataraza, Palawan (February 2009)
● IIEE Seminars and Training
o Rizal Ave. Puerto Princesa City, Palawan (September 2009)
● Job Safety and Environmental Analysis Training
o Leighton Contractor (Philippines) – Davao Project, June 05, 2013
● Risk Assessment and Hazard Identification Training o Leighton Contractor (Philippines) – Davao Project, March 18, 2013
● Pollution Control Officer I & II Seminar
o Ana’s Breeders Farm Inc., Davao City Philippines July 10-11 2012
● Hand and Power Tools Training
o Leighton Contractor (Philippines) – Davao Project June 13, 2013
● Electrical Safety Training
o Leighton Contractor (Philippines) Davao Project June 06, 2013
● Butt Fusion Training
George Fischer Pte Ltd. – Davao City, August 16 2013
● COSH Certified
South Osmina St. General Santos City
SKILLS AND KNOWLEDGE
● Knowledge in Maximo System (Procurement)
● Knowledge in CMCTS-Construction Management Commodity Tracking System Computer
● Literate (Microsoft word, excel, PowerPoint and Access)
● Wiring Installation
● Motor Trouble Shooting
● Electrical Materials Estimate 2D Basic AutoCad
● Proven leadership and management skills.
● Can work under pressure & with minimum supervision Strong in oral and written communications
● Can read and understand P&ID’s
● Planning and Scheduling
● Supervised and Managing Manpower
PERSONAL INFORMATION
Age: 35 Years Old
Birth Date: 14 July, 1986
Civil Status: Single
Citizenship: Filipino
Birth Place: Hicban Subd. Lagao General Santos City, Philippines Present Address: #22 Hicban Subd. Lagao General Santos City, Philippines Home Address: #22 Hicban Subd. Lagao General Santos City, Philippines Height: 5’10”
Weight: 81 Kg.
Passport No.: EB5190162
Expiration Date: 18 April 202
REFERENCES:
ENGR. ARNOLD JACOB
LEIGHTON Contractors Phil. Inc. (LCPI)
Sr. Electrical Engineer Head
Contact No. 099********
ENGR. SUSANO MARANAN
ATLANTIC GULF & PACIFIC (AG&P)
E&I Sr. Engineer / Supervisor
Contact No. 099********
ENGR. NESTOR YANA
LEIGHTON Contractors Phil. Inc. (LCPI)
Sr. Mechanical Engineer Head
Contact No. 091********
ENGR. AILEEN CARAIG
ASIA GULF & PACIFIC (AG&P)
E&I Site Engineer
Contact No. 097********
ENGR. REYNALDO SANTOS
KCC Properties Holdings Inc.
CMG Manager
Contact No. +639*********
ENGR. RYAN JOSE LEONICO
KCC Properties Holdings Inc.
Sr. Civil Engineer
Contact No. 091********
Ma. ERLINA MICHELLE TATIL
Peoples Group Manager
KCC Properties Holdings Inc.
Contact No. +691********
EDWARD RYVEN ALMANZOR
Custodian Supervisor
KCC Properties Holdings Inc.
Contact No. +639*********