Milind Yuvraj Kamble
Quantity Surveyor-MEP
NICMAR, Pune, India
Dubai
United Arab Emirates
+971-*********, +971-*********
adp2cv@r.postjobfree.com
OBJECTIVE
To obtain a position as a Professional Quantity Surveyor in an organization wherein I can utilize my skills and contribute towards the company's growth as well as my knowledge development.
EXPERIENCE
Smart Technology Services DWC-LLC (SMARTWORLD), Dubai, UAE Quantity Surveyor-ELV (BGM, WIFI, ICT, Parking Management, ICT Server Equipment & Control Room works)
August 2020 – January 2022
Construction of Sitewide Security and ICT System, Dubai Harbour Masterplan. Project Value – AED. 29,860,679.59/-
The View @ Plam Jumeirah, Nakheel Mall
Project Value – AED 503,336.68/-
Sobha Engineering & Contracting LLC, Dubai, UAE
Quantity Surveyor-MEP
June 2018 - May 2020
Kempinski Business Bay Hotel, Dubai
(2B+G+23 Floor, 1Building.) Project Value – AED. 49,584,051/-
Dubai Hills - MBR-DH-ACACIA 1 at Park Heights, Dubai
(2B+G+10 Floor, 3Building), Project Value – AED.110,000,000/-
(Worked on Variation part)
Brayan Electromechanical Works LLC, Dubai, UAE
Quantity Surveyor-MEP
Dec 2016 - May 2018
Akoya Oxygen, Dubai
(640 Nos. Villa), Project Value – AED.75,000,000/- Trinity Engineering Services LLC, Dubai, UAE.
Sr AutoCAD Draftsman MEP
Nov 2014 – Nov 2016
Manar Mall Redevelopment, Ras Al Khaimah, Project Value – AED. 74,700,000/- SKILLS
Client Billing, Subcontractor’s payment
certification, Identification, submission
and substantiations of variations.
SOFT SKILLS
Auto CAD
Plan Swift- Takeoff for
Estimation Rivet MEP
QS PROFESSIONAL COURSE
National Institute of Construction
Management and Research.
Graduate Programme in Quantity
Surveying (March- 2016)
LANGUAGES (Read and Write)
English, Hindi, Marathi
CORE AREA
Post Contract
Payment Application, Variation Claim,
Variation Assessment Response,
Subcontract Management, Cash flow
preparation, Attending the Client
Meetings and workshops.
Pre-Contract
Preparation of Tender Documents, BOQ
Preparation, Estimation, Tender Evaluations
Page 2 of 3
Voltas Limited, Muscat, Oman
Sr AutoCAD Draftsman MEP
Mar 2014 - Nov 2014
Kempinski Hotel and Apartment, Muscat, Oman
(G+3 Floor, 11Building)
Voltas Limited, Abu Dhabi, UAE
Sr AutoCAD Draftsman MEP (Plumbing)
Apr 2006 - Oct 2013
Jumeirah Beach Residence Sector -4, Dubai
(2B+G+50 Floor, 8 Buildings)
DIFC- Distric Cooling Projet, North Plant Empower, Dubai
Central Market Redevelopment Project, Abu Dhabi
(2B+G+85 Floor, 2 Buildings)
Yas Mall, Abu Dhabi
EDUCATION
National Institute of Construction Management and Research, Pune, India Graduate Programme in Quantity
Surveying 2014-2015
Karnataka State Open University, Mysor
Diploma in Mechanical
Engineering 2011-2013
Shiri G V Gandhi, Gurukul Polytechnic, Mumbai, India Mechanical Draftsman
1996-1998
ROLES AND RESPONSIBILITIES
POST CONTRACTING
Payment Application: Preparation of Interim Payment Application as per Contractual terms, Material Inspection, Physical/Drawing Measurement and Supporting documents.
Payment Certification: Certification of Sub-Contractor’s Running account bills as per contract specification, Contractual terms, Physical/Drawing Measurement and supporting documents.
Identification of Variation: From the Engineering Instruction (EI), RFI, Shop Drawing and Material Submittal comments shall be identifying the variation and notify to the client
OTHER TECHNICAL KNOWLEDGE
Revit MEP, for MEP co-ordination drawings.
From MCTC Education Institute, Dubai
Apr 2016- Jul 2016
PRE CONTRACTING
Tender Documents: Preparation of BOQ.
Estimation: Preparation of Estimation
along with back up like Rate analysis,
Quantity Takeoff, Drawing backups,
Quotation reference, Price list
Vendor Selections: It can be evaluated
from the vendor’s profile, based on the
project experience, Turn over, solvency,
cash flow, type of buildings, manpower,
Equipment list and project value each year.
Data Bank: Updating the price, vendor’s
profile, etc.,
WORK ORDER/LOI:
Preparation of BOQ for work order of
subcontract work.
Page 3 of 3
Variation Claim: Preparation of variation claim for the new scope of works or changes in Quantity/specification from the contract, Cost proposal along with the proper highlighted drawings, Supplier Quotation, Star Rate Buildup, Rate Analysis and Related supporting documents
Variation Assessment: Preparation of Assessment to the Sub contractor’s variation claims.
Reconciliation: Preparation of Material Reconciliation statement based on Material Received Quantity, installation quantity & Store Quantity, to identify the Surplus and shortage Quantity for the completion of project.
AutoCAD Drafting: Preparation of Drawings for supporting documents of variation claim, measurement takeoff, clarifications to the sub-contractors, highlighting & identifying the variations through AutoCAD software to easy reference. Anticipated/Forecasting cost: Preparing and updating the cost based on the Changes or addition of the works/quantity up to date.
Co-ordination with Client: Clarifying client’s or Consultant’s query in variations, cost proposal through direct meeting or arranging workshops with them in order to clear all doubt and move forward our submissions
PERSONAL DETAILS
Father’s Name: Yuvraj Dattu Kamble
Date of Birth: 28.07.1979
Nationality: Indian
Material Passport Driving E-mail License: : Status: Number: milindkamble.Married Valid M6582379 kamble.UAE Driving adp2cv@r.postjobfree.com com Mobile Number:
Declaration:
I hereby declare that above given statements are true to the best of my knowledge and belief. Yours sincerely,
(Milind Kamble)
Place: Dubai