Post Job Free
Sign in

Site Engineer Land Surveyor

Location:
Al Dafna, Qatar
Salary:
15000
Posted:
January 26, 2022

Contact this candidate

Resume:

W

O

S

P

D

g

C

l

t

p

E

E

E

(

R

P

C

P

Working Ex

Objective:

SAMIKANN

Post Box No

Doha, Qata

* **

* **

* **

Seek

gives expos

A Ba

Construction

evel, CADD

thought out

per the requ

Ethical. Res

Educationa

D

B

Employme

(QD-SBG) Q

RPERIOD:

Project: 1

Client

Position

xperience:

NU KRISHN

o.32316,

r.

ars in QD-S

ears in a LE

ears in a CC

king a chall

sure to new

achelor of T

n. Well exp

D. Possess

decisions.

uirement on

sourceful in

al qualifica

Diploma in c

B Tech civil

nt History:

QATARI DI

OCT 2017

12 YEARS

NAN

P OST APP

SBG (Qatar

EIGHTON C

CCL Constru

enging env

Ideas and

Technology

erienced in

strong ana

Expert in pr

n easy unde

the comple

tion:

civil Engine

Engineerin

AR – SAUD

TO TILL DA

: DUKHA

Upgradi

street 3

: Pub

: Proje

S

C URR

PLIED FO

ri Diar Saud

Contracting C

uction Com

vironment th

stimulates p

in Civil Eng

handling D

alytical and

reparing ne

erstanding a

etion of proj

eering -2004

ng -2012 to

DI BIN LAD

ATE (3 YEA

AN ROAD E

ing two maj

.0 km)

Five inte

Underpa

APM Tu

Drinage

Road wo

lic Works A

ect Surveyo

RICULAM V

OR SENIOR

di Bin Laden

Company a

mpany at Ind

hat encoura

personal an

gineer havin

DIGI BAR (R

problem so

cessary rep

and verificat

ects and ef

4 to 2007

o 2015

DEN GROU

ARS)

EAST CONT

jor highway

erchanges

ass (4.237m

unnel (412m

e Micro Tunn

ork (approx

Authority ( A

or.

VITAE

Skype

Mobile

Emai

R LAND S

n Group) Do

at Doha-Qat

dia.

ges continu

nd professio

ng 12 Years

Rail Alignm

lving skills w

ports on sur

tion. Highly

ffective at m

P WLL

TRACT PR

ys “Dhukhan

m long)

m long)

nel (1.6 & 2

x. 9.500 km)

shghal)

e id: samik

e No: +974

l:samikann

URVEYOR

oha - Qatar

tar.

uous learnin

onal develop

s’ experienc

ment), Total

with the abi

rvey and top

Trustworth

multitasking.

ROJECT (DO

n Road” (6.5

2.4 m dia)

)

kannu21

-30445546

nu53@gma

R

ng, creativity

pment.

ce in Survey

l Station, G

lity to make

pographica

y, Discreet

OHA –QAT

5Km) & “Gh

/ 77474059

ail.com

y and

ying and

GPS, Auto

e well

l survey as

and

AR)

harrafa

9

J

C

w

L

W

P

C

P

J

Job Respo

Chec

Invol

Prep

Esta

Calc

Piling

mark

Daily

Atten

Atten

Checking sla

with consulta

LEIGHTON

W.L.L., P ER

Project: 2

Client

Position

Job Respo

Track

Track

Prepa

Repo

Estab

Calcu

Piling

marki

Daily

Attend

Makin

nsibility:

cking and dir

ving and res

paration of Su

blishing Hori

ulate setting

g Point Co-o

king.

y survey prog

nd project rev

nds inspectio

ab edges shu

ants

CONTRAC

RIOD: 01.0

nsibility:

k center line m

k, Turnouts a

aration of Su

rting Survey

blishing Horiz

ulate setting o

Point Co-ord

ng.

survey progr

d project rev

ng as built su

recting the C

solving issue

urvey Report

izontal and v

out data and

rdinates calc

gress report f

view meeting

on works with

uttering befor

CTING COM

6.2010 TO

: Pe

Pe

co

co

: QA

: Tra

marking,

lignment,

rvey Reports

Progress de

zontal and ve

out data and

dinates calcu

ress report fi

iew meeting

urvey Reports

CAD & Survey

s between d

ts and Final a

vertical surve

d drawing co

culation in Au

file up and s

g with Client

h consultants

re casting an

MPANY QA

TILL DATE

eoples Mov

eople Mover

untry which

nstruction,

ATAR FOUN

ack Surveyo

s and Final a

etails to Surv

ertical survey

drawing co-

ulation in Aut

ile up and sa

with Client a

s.

y Teams,

esign and as

as-built surve

ey control poi

o-ordinates p

uto CAD from

ame has to s

and solving

s for Approva

nd inspection

ATAR

E (7 YEARS

vers System

r System in

h consists 1

Undergroun

NDATION

or.

as-built surve

vey manager.

y control poin

-ordinates pr

to CAD from

ame has to se

and solving t

s-built drawin

ey

ints.

prior to field s

m Drawings a

send the Pla

the site prob

al.

n

S)

m, Educatio

Education

7 No’s Tram

nd technica

ey

.

nts.

rior to field su

m Drawings a

end the Plan

he site probl

ngs

survey works

and giving to

nning team.

blems.

on City, Do

City, The fi

m stops, 24

al rooms and

urvey works

nd giving to

nning team.

ems.

s

o Site Survey

oha - Qatar

rst Tram pr

KM of trac

d Depot bui

Site Survey

y Team for

r.

roject in the

k

ildings.

Team for

Attends inspection works with consultants for Approval.

Checking slab edges shuttering before casting and inspection with consultants. P roject: 3 : GTC-600 RESERVOIRES&PIPE LINES

120 KM of 1600 diameter ductile iron pipe, Air valve and flow control chamber

Client : KHARAMA

Consultant : HYDER

Project value : 395 Million QAR.

Position : Senior Surveyor

P roject: 4 : New Al AZIZIYA Road improvement works 13.5km-Long road, 3 junction with traffic signal.

Client : ASHGHAL

Consultant : Parsons International

Position : Surveyor

P roject: 5 : New Al Kaban RPS Associated Pipelines 3 Reservoir building (7million gallons), 26 km pipe lines, Electrical substation, pump rooms, Roads, Lagoons Moats, Contouring, Underground services such as Cables, Drainage, and infrastructure works.

Client : Kharama

Consultant : Parsons International

Position : Surveyor

P roject: 6 : DUHAIL Kahramaa Reservoir, Road and Pipe Line Project, 9 Reservoir building (21million gallons), 26 km pipe lines, Electrical substation, pump rooms, Roads, Lagoons Moats, Contouring, Underground services such as Cables, Drainage, and infrastructure works.

Client : KAHRAMAA

Consultant : KEO International Consultant

Position : Assistant Surveyor

J

(

I

P

C

C

P

P

C

C

P

P

J

P

Job Respo

Prep

Coor

in tim

Moni

done

Main

certif

Perio

Prep

by th

Moni

store

Coor

Prep

Prov

(CCCL) CO

NDIA ( FRO

Project: 1

Contractor

Client

Period

Position

Contractor

Client

Period

Position

Job Respo

S

c

P

c

C

U

E

f

Project: 2

onsibility:

paring the con

rdinating with

me with qualit

itoring the su

e in site for th

ntaining the c

ficates are re

odic checking

paring daily p

he survey ins

itoring the us

e.

rdinating with

paring, submi

viding worker

ONSOLIDAT

OM 2007 TI

:

:

:

:

:

:

:

:

:

:

nsibility:

Supervise an

customer sat

Preparation o

contractor bil

Checking of q

Using the late

Execution &

foundation w

ntrol points

h the superin

ty.

urveyors, cha

he stakeouts

calibration du

ecorded.

g in site and

progress repo

struments to d

ser daily reco

h draftsman a

itting and clo

rs statistics o

TED CONS

ILL 2010) (3

MIT – MAN

CCCL – C

MANIPAL

Mar 2008 t

Junior Eng

: INFOSYS

CCCL – C

INFOSYS

May 2007

Site Super

nd monitor th

tisfaction.

of bar bendin

lls etc. Execu

quality of RC

est Project M

supervision o

works, cooling

ntendents an

ainmen and p

and levels.

ue dates of th

maintaining

orts, as built

drawings.

ords of all su

and surveyo

osing the surv

on a daily bas

TRUCTION

3 YEAR’S)

NIPAL INST

OSOLITED

MEDICAL

to May 201

gineer

HOSTEL P

OSOLITED

to Mar 200

rvisor

he site activit

ng schedule

ute the steel

CC works suc

Management

of Industrial

g towers etc.

d engineers

providing the

he devices a

the accuracy

of work done

rvey machin

rs to prepare

vey inspectio

sis to the Su

N CONSOR

TUTIUE OF

D CONSORT

COLLEGE.

0

PROJECT,

D CONSORT

8

ies force thro

duly approve

as per appro

ch as founda

t technique in

structures an

for their surv

em latest app

nd tools and

y and good q

e and using A

neries and oth

e as built dra

on reports fo

perintendent

RTIUM LIMIT

F TEGHNO

TIUM CON

.

MYSORE -

TIUM CON

ough forema

ed. Studying

oved structu

ations, colum

n Planning a

nd foundatio

vey requirem

proved drawi

d sending the

quality of wor

AutoCAD, tra

her accesso

awings for su

r the consult

t and Human

TED -

LOGY, MA

STRUCTIO

- INDIA

STRUCTIO

an, monitoring

of B.O.Q.s a

ral design.

mns, beams, w

nd Execution

n for convey

ments to finish

ings for the w

em to calibrat

rk.

ansferring th

ries taken fro

bmission.

tants.

n Resource D

ANIPAL, IND

ON LTD.

ON LTD.

g the work as

and preparat

walls and sla

n.

yors, DG

h the project

work to be

tion and

e data raised

om the site

Department

DIA

s per

tion of sub-

abs etc.

t

d

Pockets fixing & removing work, bolts fixing and alignment and grouting works for heavy machines and its foundation works & erection works.

On site experience as a site engineer for Construction of high rise building.

Execution and supervision of finishing works like all type of masonry, flooring, false ceiling, structural glazing, joineries, aluminum works and painting etc.

Allocate work to other members of team in order to ensure delivery of design to quality, time and budget.

Designed and prepared engineering designs, plans, drawings, specifications and cost estimates.

I nstrument and Equipment Handled.

Levels, Theodolite, Plummet : Leica, Sokkia, Topcon, Trimble and Nikon

Total Station : Leica, Sokkia, Nikon, South and Trimble

GPS : Leica, Trimble

DIGI BAR : For Rail Alignment

C omputer knowledge:

Archi CAD,

Auto Cad 2007, 2013 & 2017

MS office, MS word,

Wrench,

Track survey studio,

DIGI BAR SOFTWARE

CIVIL 3D

Personal Details:

Date of Birth : 08.11.1985

Sex : Male

Marital Status : Married

Nationality : Indian

Passport No : G7015745

Languages Known : English, Hindi, Tamil, Malayalam and Kannada License : QATAR & INDIA valid Driving license

D eclaration:

I hereby declare and confirm that the information given above is true to the best of my knowledge and belief.

Date : Yours Faithfully,

Place : (Samikannu .k)



Contact this candidate