W
O
S
P
D
g
C
l
t
p
E
E
E
(
R
P
C
P
Working Ex
Objective:
SAMIKANN
Post Box No
Doha, Qata
Seek
gives expos
A Ba
Construction
evel, CADD
thought out
per the requ
Ethical. Res
Educationa
D
B
Employme
(QD-SBG) Q
RPERIOD:
Project: 1
Client
Position
xperience:
NU KRISHN
o.32316,
r.
ars in QD-S
ears in a LE
ears in a CC
king a chall
sure to new
achelor of T
n. Well exp
D. Possess
decisions.
uirement on
sourceful in
al qualifica
Diploma in c
B Tech civil
nt History:
QATARI DI
OCT 2017
12 YEARS
NAN
P OST APP
SBG (Qatar
EIGHTON C
CCL Constru
enging env
Ideas and
Technology
erienced in
strong ana
Expert in pr
n easy unde
the comple
tion:
civil Engine
Engineerin
AR – SAUD
TO TILL DA
: DUKHA
Upgradi
street 3
: Pub
: Proje
S
C URR
PLIED FO
ri Diar Saud
Contracting C
uction Com
vironment th
stimulates p
in Civil Eng
handling D
alytical and
reparing ne
erstanding a
etion of proj
eering -2004
ng -2012 to
DI BIN LAD
ATE (3 YEA
AN ROAD E
ing two maj
.0 km)
Five inte
Underpa
APM Tu
Drinage
Road wo
lic Works A
ect Surveyo
RICULAM V
OR SENIOR
di Bin Laden
Company a
mpany at Ind
hat encoura
personal an
gineer havin
DIGI BAR (R
problem so
cessary rep
and verificat
ects and ef
4 to 2007
o 2015
DEN GROU
ARS)
EAST CONT
jor highway
erchanges
ass (4.237m
unnel (412m
e Micro Tunn
ork (approx
Authority ( A
or.
VITAE
Skype
Mobile
Emai
R LAND S
n Group) Do
at Doha-Qat
dia.
ges continu
nd professio
ng 12 Years
Rail Alignm
lving skills w
ports on sur
tion. Highly
ffective at m
P WLL
TRACT PR
ys “Dhukhan
m long)
m long)
nel (1.6 & 2
x. 9.500 km)
shghal)
e id: samik
e No: +974
l:samikann
URVEYOR
oha - Qatar
tar.
uous learnin
onal develop
s’ experienc
ment), Total
with the abi
rvey and top
Trustworth
multitasking.
ROJECT (DO
n Road” (6.5
2.4 m dia)
)
kannu21
-30445546
nu53@gma
R
ng, creativity
pment.
ce in Survey
l Station, G
lity to make
pographica
y, Discreet
OHA –QAT
5Km) & “Gh
/ 77474059
ail.com
y and
ying and
GPS, Auto
e well
l survey as
and
AR)
harrafa
9
J
C
w
L
W
P
C
P
J
Job Respo
Chec
Invol
Prep
Esta
Calc
Piling
mark
Daily
Atten
Atten
Checking sla
with consulta
LEIGHTON
W.L.L., P ER
Project: 2
Client
Position
Job Respo
Track
Track
Prepa
Repo
Estab
Calcu
Piling
marki
Daily
Attend
Makin
nsibility:
cking and dir
ving and res
paration of Su
blishing Hori
ulate setting
g Point Co-o
king.
y survey prog
nd project rev
nds inspectio
ab edges shu
ants
CONTRAC
RIOD: 01.0
nsibility:
k center line m
k, Turnouts a
aration of Su
rting Survey
blishing Horiz
ulate setting o
Point Co-ord
ng.
survey progr
d project rev
ng as built su
recting the C
solving issue
urvey Report
izontal and v
out data and
rdinates calc
gress report f
view meeting
on works with
uttering befor
CTING COM
6.2010 TO
: Pe
Pe
co
co
: QA
: Tra
marking,
lignment,
rvey Reports
Progress de
zontal and ve
out data and
dinates calcu
ress report fi
iew meeting
urvey Reports
CAD & Survey
s between d
ts and Final a
vertical surve
d drawing co
culation in Au
file up and s
g with Client
h consultants
re casting an
MPANY QA
TILL DATE
eoples Mov
eople Mover
untry which
nstruction,
ATAR FOUN
ack Surveyo
s and Final a
etails to Surv
ertical survey
drawing co-
ulation in Aut
ile up and sa
with Client a
s.
y Teams,
esign and as
as-built surve
ey control poi
o-ordinates p
uto CAD from
ame has to s
and solving
s for Approva
nd inspection
ATAR
E (7 YEARS
vers System
r System in
h consists 1
Undergroun
NDATION
or.
as-built surve
vey manager.
y control poin
-ordinates pr
to CAD from
ame has to se
and solving t
s-built drawin
ey
ints.
prior to field s
m Drawings a
send the Pla
the site prob
al.
n
S)
m, Educatio
Education
7 No’s Tram
nd technica
ey
.
nts.
rior to field su
m Drawings a
end the Plan
he site probl
ngs
survey works
and giving to
nning team.
blems.
on City, Do
City, The fi
m stops, 24
al rooms and
urvey works
nd giving to
nning team.
ems.
s
o Site Survey
oha - Qatar
rst Tram pr
KM of trac
d Depot bui
Site Survey
y Team for
r.
roject in the
k
ildings.
Team for
Attends inspection works with consultants for Approval.
Checking slab edges shuttering before casting and inspection with consultants. P roject: 3 : GTC-600 RESERVOIRES&PIPE LINES
120 KM of 1600 diameter ductile iron pipe, Air valve and flow control chamber
Client : KHARAMA
Consultant : HYDER
Project value : 395 Million QAR.
Position : Senior Surveyor
P roject: 4 : New Al AZIZIYA Road improvement works 13.5km-Long road, 3 junction with traffic signal.
Client : ASHGHAL
Consultant : Parsons International
Position : Surveyor
P roject: 5 : New Al Kaban RPS Associated Pipelines 3 Reservoir building (7million gallons), 26 km pipe lines, Electrical substation, pump rooms, Roads, Lagoons Moats, Contouring, Underground services such as Cables, Drainage, and infrastructure works.
Client : Kharama
Consultant : Parsons International
Position : Surveyor
P roject: 6 : DUHAIL Kahramaa Reservoir, Road and Pipe Line Project, 9 Reservoir building (21million gallons), 26 km pipe lines, Electrical substation, pump rooms, Roads, Lagoons Moats, Contouring, Underground services such as Cables, Drainage, and infrastructure works.
Client : KAHRAMAA
Consultant : KEO International Consultant
Position : Assistant Surveyor
J
(
I
P
C
C
P
P
C
C
P
P
J
P
Job Respo
Prep
Coor
in tim
Moni
done
Main
certif
Perio
Prep
by th
Moni
store
Coor
Prep
Prov
(CCCL) CO
NDIA ( FRO
Project: 1
Contractor
Client
Period
Position
Contractor
Client
Period
Position
Job Respo
S
c
P
c
C
U
E
f
Project: 2
onsibility:
paring the con
rdinating with
me with qualit
itoring the su
e in site for th
ntaining the c
ficates are re
odic checking
paring daily p
he survey ins
itoring the us
e.
rdinating with
paring, submi
viding worker
ONSOLIDAT
OM 2007 TI
:
:
:
:
:
:
:
:
:
:
nsibility:
Supervise an
customer sat
Preparation o
contractor bil
Checking of q
Using the late
Execution &
foundation w
ntrol points
h the superin
ty.
urveyors, cha
he stakeouts
calibration du
ecorded.
g in site and
progress repo
struments to d
ser daily reco
h draftsman a
itting and clo
rs statistics o
TED CONS
ILL 2010) (3
MIT – MAN
CCCL – C
MANIPAL
Mar 2008 t
Junior Eng
: INFOSYS
CCCL – C
INFOSYS
May 2007
Site Super
nd monitor th
tisfaction.
of bar bendin
lls etc. Execu
quality of RC
est Project M
supervision o
works, cooling
ntendents an
ainmen and p
and levels.
ue dates of th
maintaining
orts, as built
drawings.
ords of all su
and surveyo
osing the surv
on a daily bas
TRUCTION
3 YEAR’S)
NIPAL INST
OSOLITED
MEDICAL
to May 201
gineer
HOSTEL P
OSOLITED
to Mar 200
rvisor
he site activit
ng schedule
ute the steel
CC works suc
Management
of Industrial
g towers etc.
d engineers
providing the
he devices a
the accuracy
of work done
rvey machin
rs to prepare
vey inspectio
sis to the Su
N CONSOR
TUTIUE OF
D CONSORT
COLLEGE.
0
PROJECT,
D CONSORT
8
ies force thro
duly approve
as per appro
ch as founda
t technique in
structures an
for their surv
em latest app
nd tools and
y and good q
e and using A
neries and oth
e as built dra
on reports fo
perintendent
RTIUM LIMIT
F TEGHNO
TIUM CON
.
MYSORE -
TIUM CON
ough forema
ed. Studying
oved structu
ations, colum
n Planning a
nd foundatio
vey requirem
proved drawi
d sending the
quality of wor
AutoCAD, tra
her accesso
awings for su
r the consult
t and Human
TED -
LOGY, MA
STRUCTIO
- INDIA
STRUCTIO
an, monitoring
of B.O.Q.s a
ral design.
mns, beams, w
nd Execution
n for convey
ments to finish
ings for the w
em to calibrat
rk.
ansferring th
ries taken fro
bmission.
tants.
n Resource D
ANIPAL, IND
ON LTD.
ON LTD.
g the work as
and preparat
walls and sla
n.
yors, DG
h the project
work to be
tion and
e data raised
om the site
Department
DIA
s per
tion of sub-
abs etc.
t
d
Pockets fixing & removing work, bolts fixing and alignment and grouting works for heavy machines and its foundation works & erection works.
On site experience as a site engineer for Construction of high rise building.
Execution and supervision of finishing works like all type of masonry, flooring, false ceiling, structural glazing, joineries, aluminum works and painting etc.
Allocate work to other members of team in order to ensure delivery of design to quality, time and budget.
Designed and prepared engineering designs, plans, drawings, specifications and cost estimates.
I nstrument and Equipment Handled.
Levels, Theodolite, Plummet : Leica, Sokkia, Topcon, Trimble and Nikon
Total Station : Leica, Sokkia, Nikon, South and Trimble
GPS : Leica, Trimble
DIGI BAR : For Rail Alignment
C omputer knowledge:
Archi CAD,
Auto Cad 2007, 2013 & 2017
MS office, MS word,
Wrench,
Track survey studio,
DIGI BAR SOFTWARE
CIVIL 3D
Personal Details:
Date of Birth : 08.11.1985
Sex : Male
Marital Status : Married
Nationality : Indian
Passport No : G7015745
Languages Known : English, Hindi, Tamil, Malayalam and Kannada License : QATAR & INDIA valid Driving license
D eclaration:
I hereby declare and confirm that the information given above is true to the best of my knowledge and belief.
Date : Yours Faithfully,
Place : (Samikannu .k)