Mahmoud Amin Ahmed
*st Settlement, New Cairo, Egypt
+2-010******** – +2-012********
adp19r@r.postjobfree.com
PROFILE
• Ten years of experience in Project Management & Coordination (OSP & ISP), RF and transmission field engineering, Solid experience in team leadership and Management, as well as my commitment to effective communication and team collaboration, I am confident that I would significantly benefit your organization.
• I’m able to co-ordinate multiple projects /tasks at the same time.
• My main task is to get the job done by time management and dealing with work requests and removing the blockers that arise to stop the implementation. KEY ACHIEVEMENTS
• Suez Canal _New Tunnels Project: Connect Suez Canal Hosp Switch with new tunnels Control Rooms Via Fiber Optical Network.
• Ring Road Lighting Project: Smart lightning (Establish Fiber Optic Network through Ring Road with 100Km length to control Ring Road Lightning.)
• STC Maintenance Project (Optical and Copper Network) in Eastern region of Saudi Arabia
• SAS, PDS Project (SEC) Saudi Arabia.
• Dawiat OSP Project (SEC Company) at Eastern region: 865 KM of Fiber Optic cables and 20535 House-hold.
-providing an end-to-end design.
- Making the full Survey, Doing the Needed BOQ, supplying & installation of the needed Active and passive components (Cabinets & Racks, Optical fiber cables, accessories, Optical splitters, ODFs, closures & media converters, etc).
• IBS Project (Vodafone Egypt)
-Cairo festival City. -Point 90 mall – Lake view residence -Down-town Mall
- Sanstefano hotel - Marriot Hotel – Mall of Arabiya –Zahraa Mtx –Bani suef Mtx
- Galleria Moon Valley Mall – Down Town Mall –City Stars Mall –Chill out.
-Mall of Egypt – Arab Contractors Stadium –Maxim Mall – Cairo university.
-Cairo Merto Line3 – Damac Mall –AUC university – Diyar Qatari Hotels.
-Cairo Airport –QNB Egypt –Sanofi Factory –Oasis Wi-Fi –Sun City Mall.
-Al Azhar Tunnel. -Four Season Hotel - Amoun Factory.
• STM connectivity (Connect TE Fiber equipment with VF Hub)
- Zayed 2 Ptt - Beverly Hills Ptt -Manshia Ptt – Gleim Ptt
- El Max Ptt -DesouK Ptt -Almaza Ptt – Nasr City 2 Ptt
- Nasr City 3 Ptt - Shorouk Ptt -El Tour Ptt
• E-Band Project (Orange)
• Cairo Airport (Etisalat)
• Supply Projects:
- Manage Fiber Optics Lab to Supply VFE teams with all need Patch cord, Pigtails, ODF, Fiber Closure and So on
EMPLOYMENT HISTORY:
August 2021 till date
Hiteknofal Solutions (Egypt)
2 P a g e
Project Manager
Projects:
• Suez Canal _New Tunnels Project: Connect Suez Canal Hosp Switch with new tunnels Control Rooms Via Fiber Optical Network.
• Ring Road Lighting Project: Smart lightning (Establish Fiber Optic Network through Ring Road with 100Km length to control Ring Road Lightning). December 2017 – May 2021
Al Mashariq (Saudi Arabia
OSP Site Manager
Projects: STC Maintenance project & SEC substation (SAS&PDS)
• Coordination and management of STC maintenance Project (Optical and Copper Network) in Eastern region of Saudi Kingdom.
• Mange Fleet, Compressor, and maintenance teams.
• Technical Support for Corrective and preventive teams
• Material Planning and releasing
• Report of Productivity and Work progress.
• Familiar with Fiber Optics tools Such as OTDR, Splicing Machine and Fiber Tool Kit
• Familiar with Copper tools Such as Fault Cable Detector (TDR), metal detector
• Serve the SAS System by Establishing the Communication Channels Between SAS Server and Main Switch's
• Establishing the Communication Channels from The Main Switch's to The Network Switch's
• Establishing the Communication Channels from The Network Switch's to the Controllers
• Test all FO under the presence of The CSD Witness according to the maximum allowed losses in each Cable
• Installation of CCTV and Telephone Network, Service Testing and commissioning. OSP Sites Manager
Projects: Dawiat (Saudi Electrical Company)
• Coordination and management of Dawiat OSP Project ( SEC Company ) at Eastern region : 865 KM of Fiber Optic cables and 20535 House-hold,more than 20 teams was working on site .
• Report work Progress & Productivity to PM on daily basis.
• Material planning for all teams on site.
• PAT Process for Dawiat Project
August 2013 -November 2017
Sky GRP -Vodafone Egypt
Project Manager
Project: IBS, STM-1 connectivity
• Supervision the work of team members and tracking overall work progress.
• Defined clear targets and objectives and communicated them to other team members.
• Monitored timelines and flagged potential issues to be addressed.
• Prepared and led meeting between departments (EHS, Warehouse, Fleet,).
• Identified and worked to remove barriers to successful completion of the overall project with particular emphasis on resolving issues with subcontractors.
• Created and tracked purchase orders submissions and complete project close-out manuals.
• Responsible for vendor acquisition and management as well as rare parts acquisition and price negotiations.
• Managed expense reports for CEO and COO
• Po issuance, Receiving, submission & Receiving invoices. 3 P a g e
• Create and sustain good working relationships with internal and external partners.
• Submit Project to Operator’s Acceptance Team to be accepted.
• Facilitated and coordinated the work of multiple project teams engaged in the establishment and implementation of new projects.
• Conducted and documented weekly status review for upper management. June 2011 – August 2013
EG Telecom, Egypt
Project Coordinator, RF & Transmission Field Engineer
• Microwave Links (NEC pasolink V4 - NEC pasolink NEO - NEC ipasolink (200, 400, 1000).
• Huawei BTS 3012 - Huawei BTS 3900A - BBU 3900[2G,3G] - RRU 3908. EDUCATION:
• 10th of Ramadan.
- Bachelor’s degree in Electrical and Computer Engineering. Major: Communication & Electronics Engineering. Graduation Date: 2010. Grade: C+ (Good+). · GPA: 2.63/4.00.
Graduation Project: Design and Analysis of Linear Integrated Dipole Micro-strip Patch Antenna Array around 10 GHZ.
Grade: Excellent
CERTIFICATION
CCNA certified.
TRAINING
• CCNA: Canadian IT Center [Summer 2006].
-(5ESS Switching / American Exchange) Telecom Egypt [summer 2007].
-Administrative Module (AM) -Communication Module 3(CM3).
-Switching Module(SM) & (SM-2000).
• Optical Fiber) Telecom Egypt [Summer 2008].
• Optical Fiber Preparing. -Optical Fiber Splicing (using Fujikura FSM-40S) and Testing. - Measuring and Locating Faults in Optical Fiber Cable using (Laser Source, Power Meter,OTDR and WAVE TEK).
• (Transmission Technology) Telecom Egypt [Summer 2009]. Theoretical Training:
- PCM Basics - PDH Basics - SDH Basics - DWDM Basics. Practical Training:
· PCM Basics - PDH Basics - SDH Basics - DWDM Basics.
· SLD-16 (Basic Components and the different functionality of SLD-16 device.
• Mobile Package) ICT [Summer 2010].
- CDMA -GSM -GPRS -UMTS.
• Embedded System [Summer 2011].
IT Skills
-Linux -CCNA. -MS office. -C language.
Personal Information
Date of birth: 7th Of October 1987. Gender: Male. Nationality: Egyptian. Marital status: Married. Military status: Exempted. Driving License: Valid till 2027 Passport: Valid
Languages
Arabic: Mother Tongue.
English: Excellent command in English written & spoken. INTERESTS
-Documentaries – Walk – Reading – Travel.
References will be furnished upon request