Post Job Free

Resume

Sign in

Electrical Engineer

Location:
Aerodrome Area, Odisha, India
Posted:
January 25, 2022

Contact this candidate

Resume:

SUMAN KUMAR ROY

Electrical Engineer

Over * Years of experience specializing in Project execution and Commissioning activities in EPC Projects.

Installation, Testing & Commissioning of HT/LT Panels & Switchgears Motors, UPS, Power Distribution systems in Industrial, Hospital & Commercial Sector. Load Calculation, SLD, Earthing, Material Inspection and Measurement for Billing Phone:

+91-958*******

+91-824*******

E-Mail:

adp08e@r.postjobfree.com

Address:

Pl-4429, Jharana Sahi

Badagada, Bhubaneswar, Odisha, India

PIN-751018

Linkedin:

linkedin.com/in/suman-kumar-roy-

36813262

Skill Highlights

Project management

Electrical Installation

Strong decision maker

Complex problem solver

Innovative

Service-focused

Role & Responsibilities

A) Site Responsibilities

ELECTRICAL SYSTEM

Supervision of 33/0.415 KV 1600 Kva Transformer Erection

(Radiator, Conservator, Buchholz Relay, Oil Surge Relay, Breather, Vent pipe) and RTCC Panel.

HT Panel Installation, PCC Panel, MCC Panel Installation work.

Busduct (upto 3200 Amps) Installation and Commissioning.

DG Set (upto 1010 Kva) Installation, Control Cable to DG Sync Panel.

150 HP Motor Pumps, Jockey Pump Installation &

Commissioning at Fire Booster Pump House.

Upto 200 KVA UPS, Battery Bank Installation and

Commissioning.

External Electrification as Street Lights, High Mast, Garden Lights.

Earthing, Lightning Protection System, HT/LT Cable routing and Laying.

60 kwh Solar Roof Top Project .

Electrical Works of HVAC System as Chiller, AHU, Axial Fans,

Internal Wiring, Distribution Board, Fitting & Fixtures of Hospital, College & Residential Building.

Material & Equipment Joint Inspection with client.

Study of SLD, Load Calculations, Design and Specifications of Electrical Equipments.

LV System

Wiring and Cabling of Fire Alarm and Public Addressable System

Installation of Detectors (Smoke, Multi Sensor, Heat Detector, MCP), Speaker.

Fire Alarm Panel Installation, Amplifier & Controller

Telephone Tag Blocks, Multipair Telephone Cable Laying

CCTV, NVR System,

B) Planning and schedule

Study of BOQ

Weekly and Monthly Work Schedule

Material Availability

Manpower Availability

C) Client & Contractor Billing

Bill of materials

Material Inspection received at Site.

Measurement Sheet preparation

Measurement Certification from client

Contractor Billing & Work Order

Work Experience

Present Employer: Jitendra Electricals

Designation: Electrical Engineer

Duration: 20th September 2021 to Present

Biju Patnaik International Airport, Bhubaneswar

Details: Project Execution Installation of 11/0.415 KV, 1.0 MVA transformer, 11 KV HT Switchboard, LT Distribution Panels, Motor, Single line Diagram, LT Cable Laying, Power Distribution, Lighting, Earthing etc., Project Documentation, Material Inspection. 02/2017 to 18/09/2020

Previous Employer: Kunal Structure (India) Pvt Ltd. Designation: Electrical Engineer

Duration: 28th Feb 2017 to 31Pth March 2021

NTPC Medical College and Hospital Project, Sundergarh, Odisha Details: Project Execution Installation of 33/0.415 KV, 1.6 MVA transformer, 33 KV HT Switchboard, LT Panels, Motor, Auxiliaries, Motors, Single line Diagram, Power Distribution and Load Calculation, Lighting etc., Project Documentation, Material Inspection. 11/2015 to 02/2017

Previous Employer: Hitek Engineering Services

Designation: Electrical Engineer

Duration: Nov 2015 to Feb 2017

IOCL Paradip Refinery (376 MW CPP), Paradip.

Client: Bharat Heavy Electricals Ltd

10/2013 to 10/2014

Previous Employer: The Power King (Licensed Govt. Contractor) Designation: Electrical Supervisor

Duration: Oct 2013 to Oct 2014

Paradeep Phosphates Ltd, Paradeep

Declaration

I do here by declare that the information above is authentic & true to the best of my knowledge.

Suman Kumar Roy

Languages

English

Hindi

Bengali

Oriya

Education

B.Tech in Electrical Engineering

from Dhaneswar Rath Institute of

Engineering and Management

Studies (BPUT) in 2013

12th in Science from Maharishi

College of Natural Law in 2009

10th from DAV Public School in

2007

Training

Training on Transmission and

Distribution System at Odisha Power

Corporation Ltd (OPTCL) at 220/132/33

KV Chandaka Substation.



Contact this candidate