ROGELIO SEBUCO BONGHANOY
Bairan, city of Naga Cebu, Philippines
Cell no. +966*********
SPECIAL SKILLS : PIPE FITTER
WORKING EXPERIENCE
Name Of Company : AL-YAMAMA Company
Address : DAMMAM SAUDI ARABIA
Position : PIPEFITTER
Project : ISFB-JEC
Inclusive Date : JANUARY 3, 2016- AT THE PRESENT
JOB DESCRICTION
CUTTING OF CARBON STELL PIPE 4 INCHES UPTO 10 INCHES AND BEVELD
FIT-UP PIPE AND FITTINGS USING OF RIGHT ANGLE AND SPIRIT LEVEL
INSTALLED SPRINKLER TO THE FIRE FIGHTING LINE AND FABRICATE PIPE SUPPORT
Name Of Company : AL-YAMAMA Company
Address : DAMMAM SAUDI ARABIA
Position : PIPEFITTER
Project : (MOH) MINISTRY OF HOUSING DAMMAM SAUDI ARABIA
Inclusive Date : MARCH 7, 2015 - JANUARY 3, 2016
JOB DESCRICTION
PREPARE MATERIALS AND TOOLS
CUTTING OF RTR PIPE, GRINDING AND FIT-UP
CUTTING OF CLAY PIPE, GRINDING AND FIT-UP
CUTTING OF HDPE PIPE AND FIT-UP BY USING ELECTRIC
FUSSIONS AND INSTALLING MANHOLE ON THE EXCAVATION
CUTTING AND BEVELLING OF RTR PIPE AND INSTALLED COUPLING WITH GASKET AND CONNECT TO MANHOLE
CUTTING OF CLAY PIPE FIT-UP AND CONNECT TO MANHOLE
FIT-UP OF HDPE PIPE TO COUPLING, TEE, ELBOW, AND CONCENTRIC REDUCER BY USING OF ELECTRIC FUSSION MACHINE
AND ASSIST INSTALLED MANHOL
Name of Company : (MMG) MOHAMMAD AL MOJIL GROUP
Address : DAMMAM SAUDI ARABIA
Position : PIPEFITTER
Project : (KAPSARC) KING ABDULLAH PETROLEUM STUDIES AND RESEARCH CENTER
Inclusive Date : AUGUST 2013 – MARCH, 2015
JOB DESCRICTION
PREPARATION OF TOOLS AND MATERIALS
BEVELING OF PIPE 1 INCHES UPTO 14 INCHES AND FIT-UP
INSTALLATION OF PIPE AND VALVES
FIT-UP OR PIPE AND FITTINGS
Name of Company : (MMG) MOHAMMAD AL MOJIL GROUP
Address : DAMMAM SAUDI ARABIA
Position : PIPEFITTER
Project : (SATORP) SAUDI ARABIA TOTAL REFINERY PROJECT
Inclusive Date : DECEMBER, 2012 - JUNE, 2013
JOB DESCRICTION
READ ISO DRAWING AS PER STANDARD
PREPARE TOOLS AND MATERIALS BASED ON DRAWING
CUTTING OF PIPE AS PER DRAWING DIMENSION OF FOOL GRINDING AND BEVELLING BOTH END OF PIPE AND FIT-UP
INSTALLED FLANGES AND VALVES WITH BOLTS AND GASKET
Name of Company : (MMG) MOHAMMAD AL MOJIL GROUP
Address : DAMMAM SAUDI ARABIA
Position : PIPEFITTER
Project : GAS TREATMENT CENTER RAZ AL KHAR MAADEN JUBAIL
Inclusive Date : FEBUARY, 2012- NOVEMBER 2012
JOB DESCRICTION
PREPARE MATERIALS AND TOOLS BASED ON WORKING DRAWING
PERFORM PIPES INSTALLATION TO PIPE RACK
FIT-UP FITTINGS AND FLANGES
INSTALLED FLANGES AND VALVES
EDUCATIONAL ATTAINMENT
COLLEGE : UNIVERSITY OF CEBU
COURSE : BACHELOR OF SECONDARY EDUCATION (2002)
SANCIANGKO ST, CEBU CITY
VOCATIONAL : PIPE FITTING FABRICATION UPGRADING (TESDA), CITY OF NAGA CEBU (2011)
SECONDARY : LANGTAD NATIONAL HIGHSCHOOL (2002 )
ELEMENTARY : BAIRAN ELEMENTARY SCHOOL (1999 )
PERSONAL DATA
Date Of Birth : SEPT 16, 1982
Place Of Birth : BAIRAN, CITY OF NAGA, CEBU
Age : 38
Sex : MALE
Civil status : MARRIED
Weight : 56 KGS.
Height : 5’3
Citizenship : FILIPINO
Religion : ROMAN CATHOLIC
Father’s Name : PRIMITIVO C. BONGHANOY
Spouse’ Name : MARIA CECILIA E. BONGHANOY
Address : BURAUEN LEYTE
ROGELIO S. BONGHANOY
EMPLOYEE