Post Job Free

Resume

Sign in

L.L.C Project Manager

Location:
Al Masfalah, Makkah, Saudi Arabia
Salary:
upon interview
Posted:
September 22, 2021

Contact this candidate

Resume:

Page *

ALZAIL MUHAMMAD LAHAMAN

Bachelor of Science in Civil Engineering

CAREER SUMMARY

* ***** ** ********** ** Site & Quality Supervision and inspections of Pipelines tunneling, Storm Water Drainage Under Ground Pipelines, and High rise Condominium as well Road and Asphalting. Having the ability to handle critical and challenging projects from beginning to completion stage. Aware of Specific Standards as per requirement of the project, planning & implementation effective control measures to retain the quality of work with full respect of safety standards. Having adequate knowledge of routine materials testing related to Soil, Aggregate, Sub Base, Aggregate Base Course, Concrete and Asphalt. Skilled in Maintain and up to date all the documents, records, correspondence as per drawings and project specifications.

WORK EXPERIENCE

Hydraulic Inspector / Qa/Qc Engineer

Project Title: Al-Shoibah, SWCC-2 380Kv Substation, OHTL Project & underground cable

Project Title: Al-Qunfudah, New Water City Feeder WTS Project Title: Jeddah Storm Water Drainage – UP06 Project, Jeddah Company: Saudi Services for Electro & Mechanics, Kingdom Of Saudi Arabia Date: May 18, 2019 to December 18, 2021

Duties & Responsibilities:

Responsible and supervised geometric elevations, layout for excavations and alignment of Micro tunneling and pipe lines as per approved drawing and profile.

Responsible and supervised installation of manholes, RCC Junction Boxes, RCC Boxes which includes Massive RCC work, Backfilling activities related to project and Formation Preparation, Geo textile laying, and asphalting as the project specifications and accepted practices.

Responsible and supervised deep excavation, dewatering, pipe laying (PVC, GRC, CLAY, VCP, RCC pipes) and verified upstream and downstream levels of inlet and outlet.

Conducted and supervised water test and air pressure test to verify pipe leakage for Ø3000mm to Ø300mm and water test of manholes.

Supervised the finishing work inside and outside of the manhole.

Inspection of materials and testing of construction materials.

Witness of Works Inspection Request, Materials Inspection Request and Testing Request with the contractor representative.

Responsible and supervised backfilling procedure of trench, open channel, culvert and dam layer by layer which includes Field Density Test.

Supervised Water Proofing (Bitumen water proofing, Water proofing membrane, Protection boards etc...).

Responsible and Supervised preparation and post micro- tunneling work.

Responsible and Supervised Installation of hydraulic jacking frame at a required level

Tertiary:

Western Mindanao State

University

Current Address:

Al Shaya building A AL

Barsha 1 Dubai, UAE

Contact Number:

566140718

Email address:

adort2@r.postjobfree.com

Nationality:

Filipino

Date of Birth:

May 15, 1991

Marital Status:

Single

Page 2

Responsible for Installation of equipment like the mobile crane, pumps, bentonite-mixing arrangements, pipes etc.

Supervised the Lower the tunnel machine into the drive shaft and set-up guidance system

Responsible of Fix the laser in the pit bottom aligned with horizontal and vertical grade.

Conduct pre-operation checks and does the test run.

Monitor groundwater and soil pressures, cutting head torque, slurry pressure continuously and control the slurry and feed flow. Always maintain the head pressure to withstand soil pressure to prevent abrupt settlement or uplift.

To secure Shafts are cover safely with steel plates during non- construction hours.

Responsible and Supervised Hydraulic jacks launching, shaft push and micro tunnel boring machine (MTBM) into the earth. Responsible and Supervised Lower pipe or casing into the shaft and insert it between the jacking frame and the MTBM.

To supervise Excavation and pipe laying of storm water pipe line of different diameters (i.e. Ø3000mm to Ø200mm).

To supervise Field Density Tests with the Third party lab for backfilling and paving.

To conduct inspection of Asphalt works for trenches and roads as per the specified contract specifications.

Responsible for quality control works as per company management system policy.

To check the quality of concrete at site.

To do Field Density Test (FDT) Proctor test manual and mechanically operating machine according to contract specifications.

Records all project activities and up to date information on the contractor activities, personnel, equipment and latest progress schedule.

Check Slump cone test of freshly mixed concrete according to contract specifications.

Check temperature of freshly mixed concrete before and after pouring.

To do Sieve analysis of freshly mixed concrete. Sieve analysis of Fine and coarse aggregate. Specific Gravity of Coarse and fine aggregate. Test Hardened Concrete. (Compressive Strength of Cubes) and Sand Equivalent Test. Surface moisture of fine and coarse aggregate according to contract specifications.

To check the pipe fixation and testing of storm water pipe line of different dia (i.e. Ø1500mm, Ø1200mm, Ø1000mm etc.)

Responsible and supervised backfilling procedure of trench, open channel layer by layer which includes FDT.

Conducted and supervised water test and air pressure test to verify pipe leakage and water test of manholes.

Supervised the finishing work inside and outside of the manhole. Inspection of materials and testing of construction materials.

Supervision of excavation, pipe laying, backfilling, surface preparation for asphalting as the project specification and standards.

Controlling qualities of incoming materials on site, inspection of safety precaution of manpower and equipment with respect to the ongoing projects.

Supervision an inspection of excavation and concreting for box culverts according to specifications and accepted practices. Page 3

Prepared weekly and monthly progress reports and attend progress meetings.

Skilled in maintain record such as, field inspection reports, check lists, factory test reports, laboratory test reports, inspection logbooks, construction drawings, incorporates change orders; created punch lists; check lists, and snag lists, specifications and approved submittals.

Concrete Check Slump cone test and check temperature of freshly mixed concrete according the project specifications and client requirements.

Strictly monitored the concrete casting according the approved method statements and collected samples for further concrete strength tests in coordination and cooperation with QA/QC. Page 4

Project Engineer

Project Title: Manila Hotel Corporation, One Rizal Park, Manila Project Title: Philtrust Bank, UN Muralla, UN Avenue, Manila Project Title: Philtrust Bank, Binondo Escolta, Manila Project Title: 70th Floor Shangrila Condominium, Mandaluyung, Manila Company: R&M Construction, Incorporated (2017-2019) Manila, Philippines

Duties & Responsibilities:

Prepare, schedule, coordinate and monitor the assigned engineering projects.

Monitor compliance to applicable codes, practices, QA/QC policies, performance standards and specifications.

Interact daily with the clients to interpret their needs and requirements and represent them in the field.

Assign responsibilities and mentor project team

Cooperate and communicate effectively with project manager and other project participants to provide assistance and technical support.

Review engineering deliverables and initiate appropriate corrective actions.

Determines project schedule by studying project plan and specifications, calculating time requirements, and sequencing project elements.

Maintains project schedule by monitoring project progress, coordinating activities, and resolving problems.

Controls project plan by reviewing design, specifications, and plan, scheduling changes, and recommending actions.

Controls project costs by approving expenditures and administering contractor contracts.

Prepares project status reports by collecting, analyzing, and summarizing information and trend; recommending actions.

Maintains safe and clean working environment by enforcing procedures, rules, and regulations.

Maintains project database by writing computer programs; entering and backing up data.

Maintains product and company reputation by complying with federal and state regulations.

Contributes to team effort by accomplishing related results as needed.

Accountable for the quality and workmanship of every activity, precise knowledge of all aspects of engineering construction relating to Civil, Architectural and Structural discipline interfacing the multidisciplinary processes

Page 5

Project Engineer

Project Title: 4-Storey Out Patient Department, ZCMC Company: R.R Encabo Construction, Incorporated (2016-2017) Zamboanga City, Philippines

Duties & Responsibilities:

Assist the construction manager to establish project objectives, procedures, data collection methods, and performance standards within boundaries of corporate policy

Prepare scheduled and necessary updates of construction activities and analysis of manpower and equipment required

Create and administer appropriate testing protocols to monitor project performance

Inform all supervisors and subcontractors promptly of any construction schedule changes, and work closely with all stakeholders to ensure requirements are met

Maintain budgetary, scheduling, and project database oversight, and report regularly to project manager to keep him/her constantly informed of job progress, plans and problems that could significantly affect costs or schedules

Manage compliance, quality control, and quality assurance standards and specifications

Analyze all products and non-conformance processes and evaluate all documents to ensure the maintenance of optimal quality and prepare monthly reports to evaluate performance

Monitor an efficient system and record for all project activities and analyze all processes to ensure all work according to quality requirements.

Manage all work methods, maintain knowledge on all quality assurance standards, monitor continuous application for all quality assurance processes, and recommend corrective actions for all processes.

Develop a method statement for the activity including risk assessment and job safety environmental analysis and Inspection Test Plan and Checklist based on specifications of the project.

Coordinate with the consultant’s representative and Site In-charge for inspection.

Report to the QA/QC Manager, control, and monitor all activities related to Quality.

Page 6

Site Engineer

Project Title: 10th-Storey Commercial Building, Zamboanga City Shieham Construction & Enterprises (2014-2016)

Zamboanga City, Philippines

Duties & Responsibilities:

Inspect facilities and analyze operational data.

Maintain compliance with safety and regulatory standards.

Compile estimates for technical and material requirements for project development.

Determine and present estimates of operational costs.

Evaluate operations and processes.

Suggest process and technical design changes to improve performance and efficiency.

Implement improvements to designs and processes.

Test material and structural integrity.

Research the environmental impact of projects.

Incorporate eco-friendly and sustainable features into design plans.

Create graphical representations of proposed solutions.

Prepare proposal documents and presentations.

Compile and present reports explaining project details to non- technical stakeholders.

Monitor project progress, compliance with design specifications and safety standards.

Direct engineering activities, assign tasks and provide training and support.

Create work schedules and adjust as needed to meet project deadlines.

Maintain detailed documentation of all site-engineering activities. Page 7

CERTIFICATION

“Scaffolding Inspector: TUV SUD MIDDLE EAST

L.L.C, Kingdom Of Saudi Arabia” April 14, 2021

“Civil Engineers: Spearheading in Disaster Mitigation and preparedness” October 26-27, 2017

“Orientation on the Seal of Good Local

Governance” February 02, 2017

“Toward Quality and Excellent Educators of the

World” July 22, 2015

Page 8

CHARACTER REFERENCE

Engr. Ahmed Mousa Al Ghamdi

Project Manager, Shoibah-SSEM

+966*********

Engr. Mahmoud Omar

Project Manager, UP06-SSEM

+966********

Engr. Jonatham Sareno

Project Manager, Louis Berger / Worleyparsons

+966*********

Engr. Mahmur A. Alihuddin

Project In-charge, RMCI

+639*********

Engr. Paquito B. Talento

Project In-charge, Philtrust Bank

+637********

Engr. Christian C. Burgos

Project In-charge, Manila Hotel Corporation

+634********

Engr. Nica E. Manabat

Project In-charge, R.R Encabo Contructors, Inc

+639********

Engr. Omar B. Turabin

Private-tutor on FEU and La Salle University Civil Engineering Students, Former

Civil Structural Inspector Design Science, NAIA Expressway. Paranaque City

+639*********

Engr. Alih S. Hatab

General Manager, Shieham Construction $ Enterprises Zamboanga City

+639*********



Contact this candidate