Post Job Free
Sign in

Resident Engineer Manager Engineering

Location:
Egypt
Posted:
September 21, 2021

Contact this candidate

Resume:

ONSULTANT’S SIGNATURE:

El-Sayed Abdelal Page * of 7

CURRICULUM VITAE

1. PERSONAL:

Name : El –Sayed Mohammed Mostafa Abdelal

Nationality : Egyptian

Date of Birth : July 26, 1967

Tel. : 55820376

2. ACADEMIC QUALIFICATIONS:

Academic Degrees Date conferred Name and Location

of Institution

B.Sc. Civil Engineering 1990 Zagazig University

- Professional Structural Egypt

Design

3. PROFESSIONAL REGISTRATIONS/AFFILIATIONS:

(With registration numbers and membership dates)

1. Egyptian Society of Engineers

2. Kuwait Society of Engineers

4 . PROPOSED POSITION ON PROJECT: Resident Engineer Or Assistant Resident Engineer, Or Sr . Structure Engineer

5. RESPONSIBILITIES (Brief summary of tasks and duties on the project):

Determine the engineering requirements by analyzing and administering appropriate tests.

Communicate with all working teams and submit monthly reports on the project.

Participate in providing appropriate solutions for all engineering problems.

Following up,Checking and approving of all Materials and shop drawings within the contract documents.

Following up the supervision staff, guide & evaluate their performance, and Monitor the Supervision of all construction works. ONSULTANT’S SIGNATURE:

El-Sayed Abdelal Page 2 of 7

Ensure that the contractor and supervision teams comply with project specifications and approved drawings.

Approving of subcontractors profiles and coordinating the site meeting.

Provide assurance that the design is carried out to above standard

Monitor the testing and commissioning of the various elements.

Prepare the Agenda of progress site meeting.

Checking,approving& following up of program CPM and cash flow. 6. RELEVANCE OF POST:

Mr. Abdelal has extensive experience in the field of Construction works and Structural Engineering in design, supervision and construction for prestigious and sophisticated projects in Kuwait.

He has a solid back ground in managing the structural design of the multiple projects concurrently with strong detail, problem solving and follow through capabilities. Demonstrated ability to manage, motivate and build cohesive teams that achieve results.

He is a motivated team leader, able to work with team members to meet deliverables. he has a strong analytical, interpretive, organization and problem solving skills.

FORM 3B

FIRM NAME: Project Management International Systems EXPERIENCE

CONSULTANT’S SIGNTURE:

El-Sayed Abdelal Page 3 of 8

PERIOD(Y/M)

DESIGNATION/

POSITION

EMPLOYER'S NAME

AND ADDRESS

PROJECT DESCRIPTION DUTIES

From To

March

2015

To date Sr. Structural

Engineer

Project Management

International Systems

(PMI) Kuwait

Project and Healthcare

Management Services for the

Expansion of Farwaniah

Hospital with the total projects

above 260 Million KD.

Review of all items and drawings & calculations related to structure works within the tender documents and recommends any changes.

Supervise all structure works, which includes casting, inspections, and testing.

Monitor the testing and commissioning of the various structure elements & materials..

Coordination between structure drawings, architectural drawings, medical drawings, electrical and mechanical drawing.

Checking and approving Work shop drawings.

Review the civil specification and matching it with the drawings and other documents.

Check and approving all structure items which

required for any architecture(finishing & flooring& facad), medical or any other department including structure calculations & drawings .

Check, review and approving structure validation report.

Dec

2012

Feb

2015

Sr.Structural

Engineer

Project Management

International Systems

(PMI) Kuwait

Project & Construction

Management Services for

Ministry of Interior – MOI,

Kuwait (more than 85 projects)

Project Value: KD 1,500,000/-

Review of all items and all the drawings & calculations related to structure works within the tender documents and recommends any changes.

Monitor the testing and commissioning of the various structure elements.

Coordination between structure drawings,

architectural drawings & electrical and mechanical drawing.

Check and Review the price analyses for the projects.

Value engineering of the projects during design

stages.

Preparing design standards for civil works.

Consultant offices evaluation and selecting.

FORM 3B

FIRM NAME: Project Management International Systems EXPERIENCE

CONSULTANT’S SIGNTURE:

El-Sayed Abdelal Page 4 of 8

PERIOD(Y/M)

DESIGNATION/

POSITION

EMPLOYER'S NAME

AND ADDRESS

PROJECT DESCRIPTION

DUTIES

From To From

July

2012

Nov

2012

Project Manager Project Management

International Systems

(PMI) Kuwait

Al Messila Healthcare Center

Owner: Ministry of Health

(MOH)

Project Value: $ 6.2 Million

Checking, approving & following up of project

program CPM.

checking and approving Work shop drawings.

Checking and approving contractor & consultant

payments.

Checking approving & cash flow for all the project

Checking approving of materials and follow up &

checking the testing of different materials.

Approving of subcontractors profiles and coordinating the site meeting.

Prepare monthly reports.

March

2011

June

2012

Project Manager Engineering Systems

Group

Head Quarters Complex 2

Head quarter building & car

parking building & irrigation

tank & landscape.

Owner: KNG – Kuwait

Cost: 120 Million dollars

Checking and approving Work shop drawings.

Checking approving of materials and flow up &

Checking the testing of different materials

Checking approving of materials and flow up &

Checking the testing of different materials

Checking approving & cash flow for all the project.

Checking, approving & following up of project

program CPM

Checking and approving contractor & consultant

payments.

Approving of subcontractors profiles and coordinating the site meeting .

Prepare monthly reports & coordination meeting.

Jan

2009

Feb

2011

Project Manager Engineering Systems

Group

Operation Center Building

Owner: KNG – Kuwait

Project Value: $ 10.5 Million

Checking and approving Work shop drawings.

Checking approving of materials and flow up & Checking the testing of different materials

Checking approving & cash flow for all the project.

Checking, approving & following up of project program CPM.

FORM 3B

FIRM NAME: Project Management International Systems EXPERIENCE

CONSULTANT’S SIGNTURE:

El-Sayed Abdelal Page 5 of 8

PERIOD(Y/M)

DESIGNATION/

POSITION

EMPLOYER'S NAME

AND ADDRESS

PROJECT DESCRIPTION DUTIES

From To

Cont. Checking and approving contractor & consultant payments.

Approving of subcontractors profiles and coordinating the site meeting .

Prepare monthly reports & coordination meeting.

Dec

2006

January

2009

Resident Engineer Al-Fulaig & A.

Mashhour Consulting

Office

The New Central Market –

Fahaheel Cooperative Society

Central Market consists of

basement & ground and first

floor with area of 5200 m2

Owner: Fahaheel Cooperative

Society

Cost: 15 Million Dollars

Supervise all civil works and structure works, which includes casting, inspections, and testing.

Checking and approving of shop drawings,

Checking, approving & of materials required to project contract, specifications and checking of testing of this materials.

Approving of subcontractors profiles and coordinating the site meeting

Checking, approving & following up of program CPM and cash flow.

Preparing of monthly report .

Review & check and redesign some structure items in the project and deaign some projects in the head office. April

2005

Dec

2006

Assistant Resident

Engineer

Al-Fulaig & A.

Mashhour Consulting

Office

Police Vehicle Department,

Construction Building

Department

Owner: Ministry of Interior (MOI)

Cost: 20 Million Dollars

Project consist of 2

administration building and 4

workshops & parking area

Supervise all structure works, which includes casting, inspections, and testing.

Checking and approving of shop drawings,

Checking, approving & of materials required to project contract, specifications and checking of testing of this materials.

Approving of subcontractors profiles and coordinating the site meeting

Checking, approving & following up of program CPM and cash flow.

Preparing of monthly report .

Review & check and redesign some structure items in the project and deaign some projects in the head

office.

FORM 3B

FIRM NAME: Project Management International Systems EXPERIENCE

CONSULTANT’S SIGNTURE:

El-Sayed Abdelal Page 6 of 8

PERIOD(Y/M)

DESIGNATION/

POSITION

EMPLOYER'S NAME

AND ADDRESS

PROJECT DESCRIPTION DUTIES

From To

Nov.

2003

March

2005

Assistant Project

Manager

Al-Hadeer for General

Trading & Contracting

W.L.L.

Ahmadi Mosques Maintenance

Project

Project consist of maintenance

of mosque and construction of

some new building and

extension to the existing

buildings

Owner: Ministry of Awkaf

Project Value: $ 7.5 Million

Review contract drawings and specification.

Sort out required material and prepare list of the same with its related specs..

Responsible for the overall review of plans and

specifications for construct-ability.

Supervise construction supervision.

Prepares weekly/monthly work schedules, monitors site shops, vehicles & construction equipment.

Co-ordinate subcontractors work schedules &

activities performance & production.

Evaluate subcontractor

Responsible for all job site day to day activities as per job specification & plans, and that all construction operation are completed on schedule, within budget and to quality standards.

Check & redesign some structure items in the project and solving any structur problem related to existing building and extension.

July

2001

October

2003

Resident Engineer Awkaf Authority-

Ministry of Awkaf

EGYPT

Alkhameese Market Project

Project consists of shops and

central market

Owner: Awkaf Authority –

Ministry of Awkaf-Egypt

Project Value: $ 1Million

Finishing the structure design & drawinngs for all the project.

Supervision of work & Checking, approving & of shop drawings Approving of subcontractors profiles.

Checking, approving & following up of program CPM and cash flow

Checking, approving & of materials required to project contract &specifications and Checking of testing of this materials.

Preparing of monthly report showing progress of work. FORM 3B

FIRM NAME: Project Management International Systems EXPERIENCE

CONSULTANT’S SIGNTURE:

El-Sayed Abdelal Page 7 of 8

PERIOD(Y/M)

DESIGNATION/

POSITION

EMPLOYER'S NAME

AND ADDRESS

PROJECT DESCRIPTION DUTIES

From To

May

1999

June

2001

Resident Engineer Ebn-Elhism

Consulting Office

Alfirdos Mill Project

Project consist of mill factory

administration building and

construction of internal roads

Owner: Alfirdos Company for mill

Project Value: $ 8 Million

Finishing the structure design & drawinngs for all the project.

Supervision of work & Checking, approving & of shop drawings Approving of subcontractors profiles.

Checking, approving & following up of program CPM and cash flow

Checking, approving & of materials required to project contract &specifications and Checking of testing of this materials.

Preparing of monthly report showing progress of

work.

Feb

1997

April

1999

Resident Engineer Ebn-Elhism

Consulting Office

Arabi Mill Project

Project consists of mill factory

administration building and

construction of internal roads &

lanscape

Owner: Arabia Dwolia Company

for mill

Finishing the structure design & drawinngs for all the project.

Supervision of work & Checking, approving & of shop drawings Approving of subcontractors

Checking, approving & following up of program CPM and cash flow.

Checking, approving & of materials required to project contract &specifications and Checking of testing of this materials.

Preparing of monthly report showing progress of work. Jan

1996

Feb

1997

Resident Engineer D/Monir Hosin

Consulting Office

Residential Tower Project

Project tower 1200m2 consist of

basement floor, ground floor and

11 typical floors.

Project Value: $ 10.5 Million

Finishing the structure design & drawinngs for all the project.

Supervision of work & Checking, approving & of

shop drawings Approving of subcontractors profiles.

Checking, approving & following up of program CPM and cash flow.

Checking, approving & of materials required to

project contract & specifications and Checking of

testing of this materials.

preparing of monthly report to show progress of

work.

FORM 3B

FIRM NAME: Project Management International Systems EXPERIENCE

CONSULTANT’S SIGNTURE:

El-Sayed Abdelal Page 8 of 8

PERIOD(Y/M)

DESIGNATION/

POSITION

EMPLOYER'S NAME

AND ADDRESS

PROJECT DESCRIPTION DUTIES

From To

Feb

1995

Jan

1996

Resident Engineer D/Monir Hosin

Consulting office

2 Residential Tower Project

Project consists of 2 towers

600 m2, basement floor,

ground floor and 11 typical

floors

Finishing the structure design & drawinngs for all the project.

Supervision of work & Checking, approving & of

shop drawings Approving of subcontractors profiles.

Checking, approving & following up of program CPM and cash flow.

Checking, approving & of materials required to

project contract &specifications and Checking of

testing of this materials.

Preparing of monthly report to show progress of

work.

Sep

1993

Jan

1995

Resident Engineer D/Monir Hosin

Consulting Office

Faculty of Medicine (Nursing

Words building + Emergency

cases building)

Project consist of basement

floor, ground floor and typical

floors.

Project Value: $ 15 Million

Finishing the structure design & drawinngs for all the project.

Supervision of work & Checking, approving & of

shop drawings Approving of subcontractors profiles.

Checking, approving & following up of program CPM and cash flow.

Checking, approving & of materials required to

project contract &specifications and Checking of

testing of this materials.

Preparing of monthly report to show progress of

work.

Feb

1992

Sep

1993

Resident Engineer D/Monir Hosin

Consulting Office

Adel Alabiary Villa Project

Project consists 1500 m2

(basement, ground and 2

typical floor), swimming pool

and labour houses.

Finishing the structure design & drawinngs for all the project.

Supervision of work & Checking, approving & of

shop drawings Approving of subcontractors profiles.

Checking, approving & following up of program CPM and cash flow.

Checking, approving & of materials required to project contract &specifications and Checking of testing of this materials.

Preparing of monthly report showing progress

of work.



Contact this candidate