-
-
-
2017
2013
2011
GOWTHAM L
OBJECTIVE
I'm a mechanical engineering graduate with 2+ years experienced in production area like Assembly, Testing, Calibration to Final inspection as a NEEM trainee Then I worked in Logistics field for 10 months in delivery section as ADMIN/TL. Now I'm looking forward to develop my career and passionate about learning new skills and develop myself with good knowledge towards this large working environments. EXPERIENCE
SAS GOLINE LOGISTICS SOLUTIONS
TEAM LEADER/ADMINISTRATIVE
# Admin work & planning various operation in delivery field.
# To follow every single field executives with call records & work performance.
# To update & maintain conversion data on regular basis also to answer customer enquiries and give them solutions
GILBARCO VEEDER ROOT
LINE WORKER
# Trainee for 2+years in production unit under NEEM contract
# Production of petroleum fuel pumps in large number & tie up with multinational corporate companies like HP, IOCL,ESSAR etc..,
# Working with Assembly section, Testing, Calibration to Final inspection in EOU department
ERP EDM MACHINING CENTRE
HELPER
# Machine work with ELECTRICAL DISCHARGE MACHINING under helper level
# Using direct CONVENTIONAL process to convert a job into reqired tolerance level EDUCATION
Dr.Nagarathinam's college of engineering
B.E Mechanical engineering
6.85%
C.S.I (C.M.M) Higher secondary school
HSC
71.1%
C.S.I (C.M.M) Higher secondary school
SSLC
81%
SKILLS
Microsoft office - Excel, Word, Powerpoint
Auto Cad
*************@*****.***
S/O M.Lakshmanan DN: 6/173 H/2
Bharathi Nagar, Mynala junction,Ketti
post, Yellanalli-643215
GOWTHAM L
Team work
Problem solving
PROJECTS
Graphite Based Solar Panels
* Project details : By using low cost graphite solar power panels to produce electricity & reduce fuel consumption with good flexibility
* Team size : 4 members
* Project duration : 36 days
* Result : Efficiency of the graphite-only solar cell was 0.76% While the efficiency of TiO2-only solar cell was 0.03% Gravity light
* Project details : innovation of gravity powered-LAMP(LED)
* Principle : similar to that pendulum clocks that are operated with the help of weights, which Mechanical energy converted into electrical energy
* Team size : 5 members
* Project duration : 25 days
* Result : As a replacement for kerosene lamp we use gravity light to brighten the lamps LANGUAGE
Tamil - Read, Write & speak
English - Read, Write & speak
INTERESTS
Participating in social activities
Learning various operation in power production
Playing Shuttle cork
Bike riding
ACTIVITIES
Paper presentations
Work shops
Volunteer in college functional activities