Post Job Free

Resume

Sign in

Solar Power Electrical Energy

Location:
Coimbatore, Tamil Nadu, India
Posted:
September 16, 2021

Contact this candidate

Resume:

**/**/****

-

**/**/****

**/**/****

-

**/**/****

**/**/****

-

**/**/****

2017

2013

2011

GOWTHAM L

OBJECTIVE

I'm a mechanical engineering graduate with 2+ years experienced in production area like Assembly, Testing, Calibration to Final inspection as a NEEM trainee Then I worked in Logistics field for 10 months in delivery section as ADMIN/TL. Now I'm looking forward to develop my career and passionate about learning new skills and develop myself with good knowledge towards this large working environments. EXPERIENCE

SAS GOLINE LOGISTICS SOLUTIONS

TEAM LEADER/ADMINISTRATIVE

# Admin work & planning various operation in delivery field.

# To follow every single field executives with call records & work performance.

# To update & maintain conversion data on regular basis also to answer customer enquiries and give them solutions

GILBARCO VEEDER ROOT

LINE WORKER

# Trainee for 2+years in production unit under NEEM contract

# Production of petroleum fuel pumps in large number & tie up with multinational corporate companies like HP, IOCL,ESSAR etc..,

# Working with Assembly section, Testing, Calibration to Final inspection in EOU department

ERP EDM MACHINING CENTRE

HELPER

# Machine work with ELECTRICAL DISCHARGE MACHINING under helper level

# Using direct CONVENTIONAL process to convert a job into reqired tolerance level EDUCATION

Dr.Nagarathinam's college of engineering

B.E Mechanical engineering

6.85%

C.S.I (C.M.M) Higher secondary school

HSC

71.1%

C.S.I (C.M.M) Higher secondary school

SSLC

81%

SKILLS

Microsoft office - Excel, Word, Powerpoint

Auto Cad

adopiz@r.postjobfree.com

978-***-****

S/O M.Lakshmanan DN: 6/173 H/2

Bharathi Nagar, Mynala junction,Ketti

post, Yellanalli-643215

GOWTHAM L

Team work

Problem solving

PROJECTS

Graphite Based Solar Panels

* Project details : By using low cost graphite solar power panels to produce electricity & reduce fuel consumption with good flexibility

* Team size : 4 members

* Project duration : 36 days

* Result : Efficiency of the graphite-only solar cell was 0.76% While the efficiency of TiO2-only solar cell was 0.03% Gravity light

* Project details : innovation of gravity powered-LAMP(LED)

* Principle : similar to that pendulum clocks that are operated with the help of weights, which Mechanical energy converted into electrical energy

* Team size : 5 members

* Project duration : 25 days

* Result : As a replacement for kerosene lamp we use gravity light to brighten the lamps LANGUAGE

Tamil - Read, Write & speak

English - Read, Write & speak

INTERESTS

Participating in social activities

Learning various operation in power production

Playing Shuttle cork

Bike riding

ACTIVITIES

Paper presentations

Work shops

Volunteer in college functional activities



Contact this candidate