RESUME
PERSONAL DETAILS
PROFILE SUMMARY
Solutions focused, meticulous and result oriented professional offering 5.0 yearsof a successful career with diverse roles distinguished by commended performance and provenresults.
•Working in DOWEL ERECTORSPVT. LTD., HINDALCO MAHAN BARGAWAN (Aditya BirlaGroup).
•ProventrackrecordofexcellenceinPlantOperation&Maintenance,Reliability,Quality,WCM&safetystandards.
•Experienceinensuringthatjobsarecompletedefficientlyandwithinregulatoryguidelinesandprojecteddeadlines,managing budgets and ensuring optimal utilization of personnel and otherresources.
•Expertise in leading plant production and maintenance personnel in day to day activities to ensure the safe and efficient maintenance of equipment andfacilities.
Demonstrated success in operations of Boiler &Auxiliary.
Excellentinterpersonal,communicationandorganizationalskillswithprovenabilitiesinteammanagementandplanning.
CORE COMPETENCIES
Erection & Commissioning of Boilers ( 6 X 150MW )
Maintenance &Reliability of Boiler
Boiler Legal Compliance and Liasoning
Budget Preparation, Control and Documentation
AnnualMaintenance&ManpowerdeploymentplanningofBoiler
Handled Critical Situation in Plant
PredictiveMaintenance,PreventiveMaintenance,Monitoringthelifecycleoftheequipment,Correctivemaintenance Cost Optimization & ReliabilityEnhancement
Team Building, Coordination & Communication
SafetyStandardspreparedasperguidelines&Ensuretheimplementation
ORGANISATIONAL EXPERIENCE
DOWEL ERECTORSPVT. LTD., HINDALCO MAHAN BARGAWAN from October 2016 to Present. Current Designation: Assistant Engineer, Mechanical.
Position: FLE Pressure Parts.
MANAGERIAL SKILLS
Executing&ensuringthemaintenanceofBoilersystemwithquality&RecordKeeping.
Involved in planning, budgeting, organizing resources, execute work plans, monitoring production and quality, coordinating priorities, resolving issues and participating in specialprojects.
Directing and mentoring subordinates to ensure performance targets are beingmet
Makingsurethatallsubordinatesaresuitablytrained/qualifiedforvarioustasksandjobstheymustcomplete
Planning,organizing,implementingandmonitoringworkschedules/externalsuppliersconsistentwiththenormalneedsofthe plant and specialprojects
Designing schedules for shift maintenance and assigning rotational shifts to theemployees
Interactingwithsubordinatestoimplementandmanageproduction,changeinitiativeswiththegoalofachievingexcellencein plant operations, maintenance, turnarounds and start ups on new and existingassets
Providing technical solutions during proposal stage to vendor and prepare risk mitigationplan.
Ensuring all aspects are taken care during the execution with regard tomaintenance.
Notable Accomplishments:
Played a pivotal role in reliability of the boiler, reduces BTL (Boiler Tube leakage) no’s to Zero. Now we are having ZERO BTL between the 6 Boilers from last 1.5Years.
Implementing new initiatives, Modifications, Energy savingprojects.
TECHNICAL SKILLS
Maintain department expenditure by efficient sparesmanagement.
Managesparesinventorymanagementtomaintainstocklevels&issuingSparesforjobexecution.Executeshutdownplanning, budgeting andimplementation.
ExperiencedinfieldmaintenanceofPressureParts,Burners,BoilerSupports,ServicingofHighPressurevalves,ControlValves, Soot blowers, &ducting’s.
Review maintenance activities and prioritise criticaljobs.
WeeklypreparationofmaintenanceKPIsofequipment’s,ParticipateinReliability&Integritystudiesasidentified.
Trainedtheunskilledmanpower,andmakethemskilledbyclassroomtraining,Toolboxtalkandshopfloortraining.
TroubleshootinginCoalBurners,PressureParts,ControlValves,MOV’s,SootBlowers,SADCandhavingthebasicknowledgeof fitting of Boiler FurnaceScaffolding.
EDUCATION
B.E. (Mechanical Engineering) from R.P.S.I.T. PATNA 2011(MAGADH UNIVERSITY BODHGAYA).
KNOWLEDGE PURVIEW
MS Office.
SpareManagement.
InternetApplication
MAJOR PROJECTS HANDLED
MajorAnnualOverhaulingofBoiler&Auxiliary,SinglehandedplannedandexecutedtheAOHofBoiler.
Involved in FGD projects (Especially in NOx) ongoingproject.
CFD of Duct andModification.
Plastic Refractory Implementation in allBoilers.
Involved in the designing of J Plate for Coal Nozzle and applied for patent thedesign.
Erection & Commissioning ofBoiler.
CAVT ofBoiler.
Place: Rakesh Kumar
DOWEL ERECTORSPVT. LTD., HINDALCO MAHAN BARGAWAN