Post Job Free

Resume

Sign in

Civil Engineer Resident

Location:
Qibla, Kuwait City, Kuwait
Salary:
1
Posted:
September 13, 2021

Contact this candidate

Resume:

Contact

+***/********-******** (Work)

adon03@r.postjobfree.com

www.linkedin.com/in/ahmed-

khamis-60a277103 (LinkedIn)

Top Skills

AutoCAD

Primavera P6

Tekla Structures

Languages

English

Certifications

Italian project

Ahmed khamis

Civil Engineer at The Bridge Company

Kuwait

Summary

I am 32 years old, working as a Civil resident engineer with a 10 year's experience in Egypt and Kuwait. I am a Kuwait resident. I have my Kuwait driving license. I am 32 years old, working as a Civil resident engineer with a 10 year's experience in Egypt and Kuwait. I am seeking a vacancy where I can implement my knowledge and experience, and ready for an interview in Kuwait.

I am available to traveling anywhere to working a civil engineer job I am a valuable worker. I have good experience in project management, site supervision, project coordination, and quantity surveying as I worked on several healthcare and residential projects. I also have a good experience working with the USA Army in Kuwait bases for more than 5 years.

Kindly find attached to this post a copy of my resume that details my qualifications, certificates, and my past experience. Best Regards,

Civil Engineer/ Ahmed Khamis

+965-********

WhatsApp/ +965********

Experience

The Bridge Company

5 years 5 months

Civil Engineer

Page 1 of 11

September 2015 - Present (5 years 2 months)

Responsibilities as a site engineer:-

• Executing work on as per approved drawings.

• Executing the project on time, within the approved budget and in accordance with the contract specifications.

• Arranging required permits and documents.

• Site visit & survey for new projects.

• Reporting daily progress report to the manager.

• Quantity surveying.

• Complete responsibility for the execution of the construction scopes for assigned projects.

• Coordinating and arranging with relevant company departments for timely allocation of labor, tools, equipment, machinery, material, and other resources.

• Attending regular meeting with the client to provide the update on project progress.

• Identifying construction risks and prepare action plans to mitigate exposure.

• Material and equipment management.

• Ensuring that the quality of material and installation of work is in accordance with the acceptable criteria identified for the project.

• Ensuring that the work is completed in accordance with the specified Project Quality and Health, Safety & Environment Plans.

• Controls and supervises through all phases of development to construction completion and project close-out.

• Responsible for ensuring safe construction practices in the storage and movement of tools, equipment, and material, adoption of safe work practices by all supervised levels & visitors, the implementation of safety policy as directed by the company’s safety plan

• Conducting daily/weekly meetings with site staff to organize work for the day/ next day.

• cost control

Civil Engineer

January 2020 - Present (10 months)

Kuwait

Project name: 1400 Blocks Stormwater Drainage, Camp Arifjan, Location: Camp Arifjan,

Client: U.S. military USAF.

Prime Contractor: Vectrus Co.

Subcontractor: The Bridge Co.

Page 2 of 11

Description Works

Experience obtained from this project, All works in this project Stormwater Drainage (Rip Rap).

How to get rid of water in case of heavy rains and drain it using a system called Rip Rap.

Use a special material to protect the soil from erosion ( Soil Stabilization ). laying layer from Gatch & Gravel before laying Rip Rap. filter system (V) Shape Channel.

submit a method statement for all construction and material installation. My Responsible for managing a group of Laborers and supervisors in the construction and maintenance supervision field, providing direct supervision and project management oversight on multiple projects, contractors, and consultants, and providing solutions and recommendations to the Client. Implement and monitor quality management guidelines. Establish/update KPIs for rating the performance of consultants and contractors. Provide training guidelines for labors junior staff. work well with staff and Client and exhibit exemplary leadership skills

Civil Engineer

September 2018 - January 2020 (1 year 5 months)

Kuwait

Project Name: Kennels with USFA

Major tasks and responsibilities in this project (Main points)

• Collaborate with engineers, architects, etc. to determine the specifications of the project

• Negotiate contracts in collaboration with Procurement with external vendors to reach profitable agreements

• Ensures full compliance for projects in accordance with Bayer Regulations

• Obtain permits and licenses from appropriate authorities

• Determine needed resources (manpower, equipment, and materials) from start to finish with attention to budgetary limitations

• Plan all construction operations and schedule intermediate phases to ensure deadlines will be met

• Acquire equipment and material and monitor stocks to timely handle inadequacies

• Hire contractors and other staff and allocate responsibilities Page 3 of 11

• Supervise the work of laborers, mechanics, etc. and give them guidance when needed

• Evaluate progress and prepare detailed reports

• Ensure adherence to all health and safety standards and report issue Activities:

1-All civil work Include the following (concrete, foundations, subgrade, base course, sewage pipes, manholes, water pipes, drainage pipes...etc.) 2-Steel structure works include the following complete the construction of a new MWD Kennel with veterinary Clinic (All materials from KIRBY company 3-Executing electrical works include the following ( Lighting, MDP, DP, switches, wiring, ground eath, pole light around the building..etc.) 4-Executing mechanical works include the following (fire alarm system, HVAC etc.)

Civil Engineer

August 2018 - January 2020 (1 year 6 months)

Kuwait

Project name: Mina AL Zour (K 216) New refinery, ALGhanim company All works in this project Road works (Asphalt)

My Responsible for managing a group of Laborers and supervisors in the construction and maintenance supervision field, providing direct supervision and project management oversight on multiple projects, contractors, and consultants, and providing solutions and recommendations to the Client. Implement and monitor quality management guidelines. Establish/update KPIs for rating the performance of consultants and contractors. Provide training guidelines for labors junior staff. work well with staff and Client and exhibit exemplary leadership skills

This project consists of three main layers of executing : sub-grade preparations.

sub-Base 25 CM Gatch&Gravel

Base course 25 CM Gatch&Gravel

After Asphalt works

Spray MC70

AC Paving 7.5 CM Type iii

Page 4 of 11

Spray Tack coat

AC Paving 5CM Type I

Civil Engineer

November 2019 - December 2019 (2 months)

Kuwait

Project name: Manitniace All Parking in Ali Alsalem All works in this project Road works (Asphalt)

I working to three locations ( Quarry parking, Manitniace parking B315, Building 505 Parking)

My Responsible for managing a group of Laborers and supervisors in the construction and maintenance supervision field, providing direct supervision and project management oversight on multiple projects, contractors, and consultants, and providing solutions and recommendations to the Client. Implement and monitor quality management guidelines. Establish/update KPIs for rating the performance of consultants and contractors. Provide training guidelines for labors junior staff. work well with staff and Client and exhibit exemplary leadership skills

This project consists of three main layers of executing : sub-grade preparations.

Base course 15 CM Gatch&Gravel

After Asphalt works

Spray MC70

AC Paving 7.5 CM Type iii

Civil Engineer

January 2018 - September 2018 (9 months)

Kuwait

Project Name: Tender 850 Italian

Supply and install construction of complex from Italian ( G&G ) Company, all buildings assembling

Executing new building fo bathrooms ( all this building made from a steel structure with assembly...etc.)

Point of Contact: Lt Col (OF-4) Paolo CALVELLO Mobile +965-******** Civil Engineer

October 2017 - February 2018 (5 months)

Page 5 of 11

Kuwait

Project Title: Supply and Installation of Tent include Building System (Patriot maintenance Bay)

Location: Ali Al Salem,

Customer: Italian Airforce

Contract No.: 2590

Project Duration: 6 Months

Project Value: Apx. 750,000.00 USD

Point of Contact: Edmundo Mirabel, Const Manager, Prime Contractor

+965-********

Description of Work:

• Construction of concrete pavement, walkway, and necessary facilities for water connection, sewage drainage, electrical connection, grounding, lighting, data/communication system, and construction of a metal fence

• HVAC Supply and Installation and Testing for the entire HVAC System

• Electrictrical (Light, cabling, trenching Main Electrical Panels, Sub DB’s Wiring. Power sockets, grounding) and testing

• Plumbing works (Laying of pipe, Water System, Sanitary System) and Testing

• Assembly of Multiple Building Structures

Civil Engineer

June 2017 - December 2017 (7 months)

Kuwait

Project Name: Construct ALT– Taxiway, and Electrical Works Consultant: USAF (U.S. Air. Force)

Main Contractor: Bridge / Subcontractor East Engineers Company Executed Works: Asphalt Work / Utility Work

Project Value: 483,000.00 USD

Location: Ali Al Salem Air Base (Kuwait)

Period of Performance: 238 Days (Phase i- 154 days, Phase II-21Days, Phase III-63 Days)

Point of Contact: Edmundo Mirabel, Const Manager, Prime Contractor

+965-********

Description of Work:

The project has three phases; no two phases shall be constructed concurrently unless written notification has been provided by the Contracting Officer (CO). The Contractor shall complete all aspects of each phase at 100% (including demobilization) before construction on the next planned phase can begin. Page 6 of 11

Phase I – Prepare a construction set of documents for a new Alternate Taxiway with shoulders. New Taxiway consists of approximately 2,286 square meters (24,600 SF) of new asphalt pavement and approximately 2,452 square meters (26,400 SF) of new asphalt shoulders located at both sides of the new taxiway. Phase I at Period of Performance 154 Days. ALL other site related work necessary for the construction of the taxiway; such as pavement saw cutting, demolition, excavation, backfill/compaction, relocation and/or encasement of various utilities (11KV High Voltage transmission lines, new MDP Pre-Engineered Building with 400 AMP Panels & power distribution lines, Communication ducts/conduits, new PVC conduits, Waterlines, ramp lighting poles, etc…) located within the proposed right-of-way of the new taxiway, pavement striping, and markings. Submit Shop drawing, material data sheet to USAF for approval. Inside working in Ali Al Salam Air Base, we are submitted our company staff legal document for apply access badge. Civil Engineer

July 2017 - October 2017 (4 months)

Kuwait

Project Name: RPA - Shelter

Location: Al Jahra, Kuwait

owner: USAF Ali Al Salem Air Base - Salmi

Poured concrete for the airport ( sub-base, Gatch&grave, Level, compact, shuttering, reinforcement wires, cubs for concrete, finishing surface, curing compound, inspection, etc )

Communication line ( install PVC Pipe, backfilling, install hand-hole and manhole, encasement concrete for pipes, dig a trench,.. etc) Water Line (install PVC Pipes, backfilling, testing pressure for pipe, gate valve, ...etc)

Septic Tank (casting concrete for the slab, wall, sub-base, backfilling, membrane .shuttering and steelwork... etc)

Civil Engineer

April 2017 - September 2017 (6 months)

Kuwait

Project Name: Utilities and Latrines with U.S. military Location: Al Jahra, Kuwait

Job Role: site Civil Engineering

owner: USAF

Page 7 of 11

Communication line ( install PVC Pipe, backfilling, install handhole and manhole, encasement concrete for pipes, dig a trench,.. etc) Water Line (install PVC Pipes, backfilling, testing pressure for pipe, gate valve, ...etc)

Septic Tank (casting concrete for the slab, wall, sub-base, backfilling, membrane .shuttering and steelwork... etc)

Light Pole Foundation and Steel Pipes

Pole Light Foundations ( shuttering and steelworks, cable, MDP, Feeder Panel, copper earth, manhole, lights etc)

Sewage work ( install PVC Pipe, Manhole, backfilling,..etc) UAV Apron project with U.S. military

June 2015 - November 2016 (1 year 6 months)

Kuwait

Project Name: UAV Apron

Location: Al Jahra, Kuwait Ali Al Salem Air Base

Owner: USAF

consultative: USAF.

This project is the concrete floors of approximately 10000 SM at the Camp Ali Al-Salem Air. My Responsibilities as a site engineer:- Design and Drawing for Joints

The work of special breaks floors Airports

Concrete floors ( contraction and expansion joints) AS-BUILT Drawing

Writing daily, weekly and monthly reports

Conducting daily / weekly meetings with site staff to organize work for the day / next day.

Civil Engineer

September 2015 - December 2015 (4 months)

Kuwait

Project Name: Medical Clinic Refurbishment

Customer: US Army

Main Contractor: Bridge / Subcontractor East Engineers Company Executed Works: Building work

Project Value: Apx. 450,000.00 USD

Location: Camp Arafjan (Kuwait)

Period of Performance: 127 Day’s

Page 8 of 11

Point of Contact : Edmundo Mirabel, Const Manager, Prime Contractor

+965-********

Description of Work:

This project is the refurbishment of approximately (55) rooms at the Camp Arifjan Medical Clinic, building 179A, including all labor, material, equipment, design, repairs, and installation required to refurbish rooms. Refurbishment includes demolition of items including floor tile; baseboards; ceiling tile; florescent lighting fixtures; supply and return air grilles; diffusers; (27) sink faucets. (1) a folding wall will be replaced with a stud and sheetrock. All walls, doors, and door frames are to be repaired to smooth surface primed and finish painted. Remove corrosion from the flag pole and repaint. Cabinetry work as defines. Items not replaced in ceiling and floors require to be thoroughly cleaned, repair including A/C systems, floor drains, etc. The existing components smoke detection/alarm system and exhausts vent HVAC ducting will need to be properly secured prior to the demolition of the existing drop ceiling. Other existing components (if applicable) to include but not limited to emergency exit signage, and communication equipment and lines will need to be relocated to accommodate the installation of a grid drop ceiling system in the entirety of the medical clinic. The end product will be in compliance with all ASG-KU safety policies and standards; OSHA standards and any applicable Ministry of Public Works (MPW), Ministry of Electric and Water (MEW), National Electric Code (NEC), and British Standard for Electrical Works. All build designs and parameters will be IAW the requirements. Universal Constraction Company

Civil Engineer

July 2014 - April 2015 (10 months)

Giza Governorate, Egypt

New Giza

Project Name: Universal General Contracting

Location: Cairo, Egypt

I worked in A Universal General Contracting Project (New Giza). Description of the project

The main building and mosque

The experience gained from the project

Concrete work (slanted ceilings and tiles) in the form of pyramids. Acts of walls at a height of more than 4 meters. Insulation of

all kinds of work. Excavation and backfill. Business buildings. Decoration works

(Ceilings pending). Acts of external glass. Flower Page 9 of 11

beds and Landscape.

Delta General Contracting

Civil Engineer

April 2014 - July 2014 (4 months)

Alexandria Governorate, Egypt

Project Name: Alex West (Delta General Contracting) Location: Alexandria, Egypt

Job Role: Civil Engineering

Build a group from villas in the compound with some infrastructure works Office of Civil Consulting Group

Civil Engineer

July 2011 - April 2014 (2 years 10 months)

Alexandria Governorate, Egypt

Project Name: Civil Paper Company

Location: Alexandria, Egypt

I worked in an Office of Civil Consulting Group. Created store Paper Products Project (civil Paper Company in Alexandria)

Kharafi Group, the owner.

Created store to store paper products on a flat 4200 meters Installation of metal elements

Concrete works

Work paving roads

Concrete floors

Ground storage tanks (reinforced concrete)

Mechanical works for the installation of fire alarms and sprinklers Testing and laboratory experiments and compare the results

with the recommended code

omitted contract

Landscape works

Follow-up work and ensure the implementation of the business matching with engineering

plans and the bid requirements and specifications

The work of the private limited mineral elements

Page 10 of 11

The work of the business extract

Education

Alexandria University

Bachelor's degree, Civil Engineering · (2008 - 2012) Page 11 of 11



Contact this candidate