Feb-****
August ****
- September
2020
2021
2019
2014
2012
SHAIKH ABDUL RAUF
OBJECTIVE
To be an active part of a growth-oriented concern, which gives me the opportunity to exploit my worth and ingenuity and opens the doors for me to move ahead and stabilize my future professional career. EXPERIENCE
Mukab Builders
Structural Engineer and site Engineer (Internship) Approx. 6 months internship is done in which Construction of PU Educational Building in Jawergi is done.
Drawing, Drifting, Calculating Loads on structure, Analysis And Design Of Various Elements of Building Structure, Preparing Excel sheets, drawing and detailing in AUTOCAD, DESIGNING IN ETABS, CROSS CHECK IN EXCEL sheets.
Private Own House Construction
Site Engineer
Drawing, Drifting and detailing in AutoCAD, Calculating Loads on structure in excel sheet, Analysis And Design Of Various Elements of Building Structure in ETABS. Learned the communication with the contractor and labors. Site management and supervisor.
Oxford English Medium School Gulbarga
Lecturer/ Teacher
Part-time Job as a teaching faculty in Oxford High school. Core Subjects like Maths and Science were taken.
EDUCATION
PDA COLLEGE OF ENGINEERING GULBARGA
Mtech in Structures
PDA COLLEGE OF ENGINEERING Glb affiliated with VTU BELAGAVI. BE in Civil Engineering
8.90
AL SHARAY PU COLLEGE Glb DEPT OF PRE-UNIVERSITY KAR 12th/PUC in science
86%
OXFORD ENGLISH MEDIUM SCHOOL Glb (KSEEB)
SSLC
69.12%
SKILLS
ETABS
AUTOCAD
Excel
Microsoft office
Having Teaching experience
C Programming, C++
PROJECTS
**************@*****.***
Permanent Address: H NO 5-993/108B,
Block No:#03 Mehboob Nagar Colony
Kalaburagi (Gulbarga) 585104, Karnataka,
INDIA.
https://www.linkedin.com/in/shaikh-abdul-
rauf-a99092134
****************@*****.***
@i_abdulrauf
Comparative study Behavior of RCC Building Structure with and without Shearwall In UG, Project is done using ETABS software, in which "A Comparative study Behavior of RCC Building Structure with and without Shearwall"
Was the topic. Taken G+6 storied RCC Building and analyzed in Zone 2 for earthquake and only wind effect is considering..
"comparative study of G+30 storied RCC building using ETABS* G+30 storey approx. 100m tall building with and without Shear wall was taken. 4 different model created to get optimised hybrid structure on the bases of 5 parameters. ACHIEVEMENTS & AWARDS
Achieved 1st, 2nd and sometimes 3rd rank award in Graduation. From primary, maintain the record of scoring good marks in academics, spl in Maths scored out of out marks in all semester. Obtained skills of Management.
LANGUAGE
Urdu
English
Hindi
Kannada
INTERESTS
Teaching part-time
Participating Social Activities
Gym
Coursing
ACTIVITIES
Planting Trees in season.
Social activities
Ground water recharge Technique
Part-time Teachings
PERSONAL DETAILS
Date of Birth : 10/09/1996
Marital Status : Single
Nationality : INDIAN
Father's Name : SHAIKH NAWAB MIYAN
Mother's Name : SYEDA JAMEELA
Gmail : ***********@*****.***
PLACE
Gulbarga
DATE
25/08/2021