Post Job Free

Resume

Sign in

Mechanical Supervisor Power Plant

Location:
Sonipat, Haryana, India
Salary:
30,000
Posted:
August 31, 2021

Contact this candidate

Resume:

Post Applied For:- Mechanical Supervisor

RESUME

NAME : HEMANT KUMAR SHARMA

Father’s Name : Shri Gopi Nath Sharma

Date of Birth : 01-01-1956

Health : Very Good

Passport No. : Z =1755573

Permanent Address : H.No.3054, Sector-15, Phase-II, New Housing Board Colony,

Sonepat-131001 (Haryana), India.

Res. Tel No.(India) : 013*-******* (India)

Mobile No. : 098********

Email ID : adogt1@r.postjobfree.com

Board of School Education : Passed Matric from Aryan High School, Rohtak, 1971 (India).

Technical Qualification : Passed Industrial Training Institute, Govt. Of India, Rohtak as a Mechanical Technician

in 1972-74. (India).

Apprenticeship : Passed Apprenticeship test in Hindustan Machine Tools, H.M.T. Pinjore.

: Machine shop Engineering & Technology

1975-1976(INDIA)

WORKED ABROAD

.

Saudia Arabia sececo power Shut down the power plant, turbine, boiler Saudia Arabia condencer, blowers, pumps etc.

Centre for Tech. Workshop Libya : Maintenance of Air compressor, Machines, Manufacturer the auto spares parts. Pumps, Blower & erection of the plant. Oil & Gas Plant Project Doha Qatar/ : Erection LNG Plant project, D.G .Set, Pumping Stn. and Sea port machineries

Piping & etc.

Saudi Arabia sammama Co. for Operation: Maintenance of the Boiler, Piping and Deutsche Babcock Borsing Power, Rotary equipments. Shut down of the Saudia Arabia. Boiler, replaced the super heater coils Dismantle of the water drum equipments

Etc.

L.P.C. Group, London, England. : Erection and Maintenance of Robotic Manufactures Tissue Towel. High speed machines of plant. Total Experience : Above 25 years.

First Aid Training with Canadian Army :

in Afghanistan.

First Aid and Heart Saver Level “A”, CPR course conducted by St. John Ambulance Canada OAPD No. LM 1091816.

DETAIL OF EXPERIENCE

Samsung Engineering and construction Ltd.

Yanbu- Saudi Arabia

Yanbu Power & Desalination Plant Phase- 3

Saudi Arabia

08/03/2013 to 28/02/2016

Equipment Supervisor

To monitor and supervision of the mechanical construction related activities like Installation and Alignment of Rotating and Static Equipments and Storage tanks.

Preparation of Bill of materials from drawings and ensure the received materials as per the drawing.

Preparation of monthly schedule, weekly/ daily progress report and minutes of meeting.

To monitor the progress with our construction schedule and take the necessary action against to complete the work as per schedule.

Responsible for oversight of field construction operations within assigned areas

Plan/ control the manpower as per plan and control the site supervisors and foreman crew.

To provide require materials and drawings to the site supervisor and Execute the construction activity as per drawings, specifications and procedures.

Monitor and follow up the contractor site manpower and equipment mobilization.

Liaising with discipline engineers on technical issues that may/ will affect construction methodology, progress and safety.

Supervise and monitor the mechanical sub-contractor on site.

Coordinate with the Planning Department for updating of Project.

Coordination the activities between various contractors and sub contractors

Review the shop drawing Material Submittal and Method statement to be generated by the Client.

Implement follow proper QA/QC procedures.

Inspect and ensure the proper workmanship by the sub-contractor

:

Kanwar engineers & contractor : Worked as a mechanical in charge Erection & maintenance of the equipments.

(Delhi metro rail projects) (07/02/2012 to 28/02/2013) Worked as a mechanical supervisor

HANWAHA ENGINEERING yanbu (saudia Arabia)

Saudia Arabia Erection the mechanical equipments on short Terms.

DYN CORPORATION, USA. : This company is providing Logistic Engineering & Contracting support to US Army deployed on UN Peace keeping mission at Kandahar in

Afghanistan. Erection & repair D.G.Set,

pipes and pumps, erection the water

Treatment plant, worked as Mechanical

Foreman, (16-5-2010 to 16-10-2011).

L.P.C.Group, London, U.K. : Worked as Mechanical Engineer Manufacturer of Tissue Product Repair and maintenance the high speed Robotic machines conveyor, gear boxes,

Hydraulic Machine and Power Presses.

(2-4-2007 to 15-2-2010).

Med gulf Construction Co. : Worked as a Mechanical Foreman on the RAS GAS Lafan Qatar sea port Erection of LNG Plant, Gas Loading Doha State of Qatar (WLL0. ARMS, Pipe Bridges, Fire & foam towers, Oil & Gas. Camera towers, fire pump house, Piping

Supports, Separator Tanks, Drain Tanks,

Oil Tanks, Foam Pipes, Fire Pipes,

Fire Piping over the

Bridge and under the trench’s Foundation

Bolts and Alignment of Pumps & Motors.

(23-2-2005 to 5-2-2006).

Worked as mechanical technician.

SNC Laevulin Gauges, Membranes, Monitor, Filter.

(Canada) Company is providing logistic support to

Afghanistan Canadian army deployed on UN Peace

Keeping mission at Kabul in Afghanistan

(4-7-2003 to 10-8-2004).

Deutsche Babcock Borsing : Shut down of Power Plant Turbine Boiler Power GMBH, Saudi Arabia. FDF Fan, GRF Fan, Valves, Rigging Job. Engineering and maintenance of : Cleaning of parts, Replaced the boiler super Power Plant. Heater coils, grinding, buffing, Tubes Alignment, pipes support fabrication of

Pipes and finally hydro test. Worked as a

Senior Mechanical Technician.

(01-08-2000 to 01-07-2003).

Bhoorathnam & Co. : Maintenance of Hydraulics Machine, EOT Construction Group Jaipur India. Crane, Goliath Crane, Gear Boxes, Concrete Mixture, Plant, Engineering &

Mechanical Department. Worked as a

Chief of Mechanical.

(20-05-1998 to 25-10-1999).

Saudi Arabia : Supervision & Maintenance of boiler, piping, Samama Co. for Operation & air compressor valve, pump house erection Management of King Fahd. Specialist Hospital Project Worked as a Mechanical Supervisor.

(7-10-1995 to 10-11-1997)

Doha Qatar (Mid Mac) : Erection and commissioning of LNG Plant, Chiyoda corporation Japan Pumping Stn., Plant Piping and Oil tanks Oil & Gas Project. Erection the heavy metals steel pipes. Worked as a Piping Foreman

(11-10-1992 to 20-10-1994).

Saudi Arabia : Maintenance of Water Treatment Plant, Al-Kawther Ind. Ltd. Fire Fighting equipments, Pumps and Engineer & Consultant Piping system, D.G. Set and notary Manufacturer Water Treatment Plant. Equipments. Worked as a Mechanical Maintenance Foreman.(4-8-1990 to 27-8-1991)

Centre for Technical Studies Central : Plant Engineering & machine Shop Tech. Workshop Tripoli Libya Machine Spare parts and tools erections Special Training and commissioning of new plant machine Main Consultant shop. Maintenance of pumps, piping, a) FITZ_WERNER -GMBH pipe supports, air compressor and D.G. West Germany. Set, commissioning of heavy equipments Manufacturer auto spare parts. Machines, worked as a Mechanical Technician.

(3-11-1988 to 5-12-1989)

Hero Honda Motors Dharuhera. : Maintenance of the plant machinery Manufacturer Motor bikes, India. Pumps Pipes, Air compressor etc. Worked As a Mechanical maintenence technician.

(7-2-1985 to 30-3-1986).

Saudi Arabia : Erection and maintenance of sea-port Saudia Conderco Ltd. Piping and rotary equipments

Worked as a Piping technician.

(11-12-1981 to 26-03-1984)

Special Training Plant Piping & : Maintenance erection, commissioning of Mechanical Erection with Engineers Plant Piping, Machines, D.G. Sets and of M/s. Czechoslovakia, India heavy equipments (1975-76. ) Regular Service in H.M.T. (India) : I have worked as a Mechanical Maintenance Manufacturer Industrial Machines Maintenance of Machines, Cranes, rotory equipment

(1976 to 1981)

WORKING DETAIL

LANGUAGES READ & SPEAK - ENGLISH, HINDI,PUNJABI&ARABI. WORK AREA OIL AND GAS, WATER PLANT, POWER PLANT, ALIGNMENT AND ERECTION OF OIL PIPES, OIL TANKS, STEAM TURBINE, BOILER

.Etc HANDLING THE TEAM OF TECHNICIANS.

WEIGHT HANDLING MORE THAN 45 KGS. (100 LBS)

ADDITIONAL SKILLS READ DRAWINGS, SPECIFICATIONS, MANUAL AND PROCESS WORK PERMIT, RISK ASSESSMENT, METHOD OF STATEMENT. HEALTH AND SAFETY .EXCEL WORDS.MS WORDS.

SKILLS READING TEXT, DOCUMENT USE, LOCK OUT PROCEDURE. PHYSICALLY

CAPABILITIES

OUT DOOR AND WORKING ON HEIGHTS.

PIPING COMPONENT GASKET, SENSOR, FLANGES, FITTINGS, VALVES, PRESSURE GAUGES, FLOW METERS.

REFFRANCE OF EMPLOYER

DYNCORP INTERNATIONAL

1) 13500 HERTIAGE PARKWAY FORT WORTH, TX 76177 UNITED STATES. USA. 2) DEUTSCHE BABCOCK

PATRICMILES (PROJECT MANAGER)

P.O. BOX. 3589, (SAUDI ARABIA).

3) SNC LAVLIN COMPANY (CANADA)

MIKE HEWITT (SHOP ENGG.)

Email: adogt1@r.postjobfree.com

4) LPC GROUP (U.K.)

PERSONAL MANAGER

TEL.NO. 044-***-**-** 888

5) Sumsung Engineering & construction

Yanbu Power & Desalination Plant

Phase- 3

Clint- SWCC Saudi Arabia

This information given above is true to the best of my knowledge and belief. If given a chance to serve your good company. I will leave no stone unturned to achieve the best results. Yours faithfully

Hemant Kumar

H.KUMAR



Contact this candidate