Post Job Free

Resume

Sign in

Civil Engineer B

Location:
Minneapolis, MN
Posted:
August 27, 2021

Contact this candidate

Resume:

HILARION T. REYES

**** ******* ***. *, ***********, Minnesota

Mobile no. : 952 - 564 -1124

E-mail: adoero@r.postjobfree.com

EMPLOYMENT BACKGROUND:

“October 7, 2019 - Present”

Delta Global Services

7500 Airline Dr Building C

Minneapolis, MN 55450

As Lead Cart screener responsible for inspection of food carts before and during loading to food truck prior to transporting to Delta Airlines.

“February 22, 2012 – February 25, 2014”

Saipem Abu Dhabi

Shah Gas Development Project

Abu Dhabi, UAE

The project is construction of Shah Gas Development Project.

As Civil Work Supervisor responsible for construction of structure and equipment foundations & underground lines: Firewater, Sewer & Oily water lines.

“September 13, 2010 – Jan 3, 2011”

Kharafi National Coompany

P.O. Box 29831, Abu Dhabi, UAE

The project is construction of Gasco IGD Habshan 5 Process Plant, Habshan, Abu Dhabi.

As Civil Superintendent responsible for concrete construction of pipe racks & equipment foundations and pits for accidental oily water pipe line.

“December 13, 2008 – December 12, 2009”

Daelim Saudi Arabia

P.O. Box 37158. Jubail. KSA

The project is construction of Saudi Kayan Petrochemical Complex HDPE Project in Jubail Industrial City..

As Site Civil Engineer I monitor and supervise subcontractors to make sure that the work be finished in time schedule and in accordance with SABIC Standard.

"April 28, 2007 - Agust 28,2008"

Octal Petrochemical FZC

Salalah. Sultanate of Oman

The project is construction of Polymer Plant Sapphire 1 & 2 in Salalah Free Zone.

As Site Civil Engineer I see to it that the contractors are working according to schedule and according to drawings & specifications. I also approve/disapprove progress bill submitted by contractors.

“January 2005 – Jan 2007”

Hyundai Engineering & Construction Co. Ltd

Project N-2256, Abu Dhabi, UAE “

The project is the construction of 220/33kv substations for ADWEA/TRANSCO and ADCO grid stations with buildings and transformer bays in Bab & Buhasa, Abu Dhabi, UAE.

As QA/QC Engineer I prepare all Method Statement for every scope of work from excavation, concrete works, finishing, painting and others. I conduct quality inspection, documentation and coordinate with client representative regarding work quality.

“January 2004 – December 2004”

Al Rashid Abetong Company

Precast and Ready Mixed Concrete

P.O. Box 6058, Riyadh, K.S.A.

The company is one of the biggest precast concrete company in K.S.A. The first project I worked with is the construction of 45m x 90m 5-storey hospital building for King Saud University in Riyadh. My second project is the extension of 4-storey Al Rashid Mall in Al Khobar, Saudi Arabia.

As Construction Engineer I directly supervised precast concrete erection and concreting using Swede Beam System.

“September 2001 – October 2003”

Hyundai Engineering & Construction Co. Ltd

Kuwait New Oil Pier Project, Mina Al Ahmadi, Kuwait

The project is EPC of 4km oil pier with 6 loading platforms and all topside facilities in Mina Al Ahmadi, Kuwait.

As Civil Engineer I was in charge for the construction of 4 km offshore pipe bridge and oil loading platforms.

“December 1997 – December 2000”

Hyundai Engineering & Construction Co. Ltd.

MRT North East Line – 706 Project, Singapore”

The project is Design and Construction of Mass Rapid Transit Farrer Park and Little India Stations and the subway tunnel in between.

As Civil Engineer I supervised subcontractors in the construction of underground

Farrer Park Station from diversion of city underground services, sheet piling, bored piling, excavation, strutting, jetgrouting, road diversion and construction of the main building and subway tunnels.

“October 1995 – October 1997

Hyundai Engineering & Construction Co. Ltd.

Sabiya Power Plant Project, Kuwait”

The project is EPC of 8 x 300MW Steam Turbine in Sabiya, Kuwait.

As Civil Engineer my first job is the construction of Circulating Water Line which is a box culvert 12.5m x 3.2 m x 1200m, then I was assigned to do the underground and above ground water supply line from 300mm to 800mmØ DI pipeline and construction of hundreds of pipe foundations of oil pipes.

“May 1989 - January 1995

Voest Alpine Company Oilfield Division

P.O. Box 84008, Tripoli, Libya”

The company is an Austrian international firm specialized in construction and maintenance of oil and gas refinery and pipelines with various contracts with major oil companies in Libya.

As Civil Supervisor I directly supervise expansion of oil and gas refinery projects from excavation, casting of concrete foundations, erection of pipe bridges, laying of pipes from 6” to 42”Ø line. I also constructed some control buildings in some oil and gas refineries such as Veba Oil,in Raslanuf, Rasco in Raslanuf, Sirte Oil in Brega and some pipelines in Ghani, 103D, Zellah and many more parts of Libya.

“February 1983 – August 1984

CIE Consulting Engineers

P.O. Box 8126, Riyadh, KSA”

The company is a British company with major contracts with Ministry of Defense for the construction of communication Radars and facilities for 18 strategic sites all over Saudi Arabia with gross cost of $1B.

As Civil/Building Inspector I was working together with resident engineer who was the government representative to monitor and supervised the Contractor, Litton-Philip Holzman, a joint venture of American and German companies. My job in the project is to check all materials and works to conform with drawings and specifications. I also recommend/ check periodic progress billing base in the actual work done. I also was given responsibility to be safety and security officer in the project site. The major work in the site is the blasting of rocky mountain, and construction of big radar foundations, then some accommodation and control buildings and some services such as roads, drainage line, water lines.

“ July 1982 – November 1982”

Civil Works Company, P.O. Box 1928

Dammam, KSA”

The project was the construction of water supply system and sewage treatment system in Dammam West and Al Jallawiyah consist of Water treatment Plant, Sewage Treatment Plant and network of water and sewer lines.

As Civil Engineer I worked in the preparation of overall project schedule and monitoring progress for billing.

“May 1979 – July 198”

National Housing Authority

Republic of the Philippines

Dagat-Dagatan Development Project”

The project is development of 420 hectares of land from portions of four cities in Metro Manila: Caloocan, Manila, Malabon and Navotas. The area which is portion of the sea was reclaimed and converted to residential and industrial Zone.

I started as Civil Engineer – 1 working as design engineer for civil works. After trained by Australian firm Kinhill Consultant I was promoted to Civil Engineer -2 then to Supervising Civil Engineer and the last is Principal Engineer B which is the chief of Engineering Design section. During my 3 years in the job we have done almost complete engineering design for networks of roads, water lines, sewer line, drainage lines, Sewage treatment plant, parks and buildings for schools and health centers.

“May 1978 – April 1979”

Office of the City Engineer

Dagupan City

Republic of the Philippines”

As Associate Civil Engineer I was assigned in supervising contractors for city roads and drainage construction and maintenance.

PERSONAL DETAILS:

PLACE OF BIRTH : Bauan, Batangas, Philippines

DATE OF BIRTH : October 22, 1955

SEX : Male

CIVIL STATUS : Married

NATIONALITY : Filipino

US Visa : Immigrant visa

EDUCATIONAL BACKGROUND:

BACHELOR OF SCIENCE IN CIVIL ENGINEERING

University of Pangasinan,

Dagupan City, Philippines

REGISTERED PROFESSIONAL CIVIL ENGINEER

Professional Regulation Commission

Republic of the Philippines – November 1977



Contact this candidate