Post Job Free

Resume

Sign in

Industrial Engineer Line Operator

Location:
Tampico, Tamaulipas, Mexico
Posted:
August 25, 2021

Contact this candidate

Resume:

Juan Alfonso Rendón

Necaxa *** sur Colonia Primero de Mayo

Ciudad Madero Tamaulipas

Cell : +52-558*******

adodkl@r.postjobfree.com

PROFFESIONAL SUMMARY:

Creative interpersonal skills, strong coordinating and planning, problem solving. Ability to work under pressure of a changing environment. experience in simplifying systems and operations to improve productivity. Ability to manage projects by planning execution in order to improve production.

Work Experience:

2020/06 –06/2021 Mayconi Services Field Egineer

Tampico Mexico

Coordinate and focus the sandblasting and painting work, as well as verify the materials and consumables (paints, solvents and abrasives) for the performance of all the related works, direct contact with customers and other construction and assembly engineers .

2020/02 –2020/05 Veolia Mexico Asbestos Technician

Mexico city Mexico

I carry out sealing work on the areas to be removed, verification of negative pressures in the work areas as well as removal of asbestos, packaging and sealing of waste in labeled bags for their confinement and final disposal to specific areas, ending with the resin sealing of the areas removed.

2019/08 –2020/01 Kratos Industrial Engineering Work Resident

Mexico city Mexico

Verification of all the work to be done in the construction of the new U.S. embassy in Mexico City

as well as Interact with the client and see all their needs according to the project. Also verify the staff's

consistency .The works progress corresponding to the different works areas.

Performing operations with articulated arm crane (fassi 25 tons ) for loading and unloading of various materials in the work area, in the unloading of the materials slings of different lengths and capacities are used according to the materials to be loaded and unloaded.

2018/06 –2019/03 LCOM Security s.a de c.v Field Supervisor

Mexico city Mexico

Supervise the assembly of structured cabling and CCTV equipment, fire alarm systems, earthquakes

and movement as well as monitoring and maintenance of the same systems.

2017/03 - 2018/05 CMS Intenational s.a de c.v. Quality Supervisor

México city México

Receive materials, dimension them according to plans as well as verify the certificates of quality. Supervise the assembling of the products and check their calibration to later give the approval for their release and send to paint to check the paint bath and release it for packaging and Ship to the warehouse.

2016/08 - 2016/12 Clearview Satellite System Installer Technician

Grande Prairie Ab

Cable laying,installation and configuration of equipment s for satellite TV service, wireless and satellite internet.

2015/03 - 2016/07 Roska Dbo - Pipe fitter

Grande Prairie Ab

Installation and rigging of reels, materials and equipment, aligning pipes and assembling equipment as well as various related activities during the construction of gas plants and installation of oil and gas pipes as well as hydraulic, hydrostatic and hermetic testing.With the articulated arm crane (fassi) mounted on a 3.5-ton truck. up to 8 tons. my daily job was to pick up my truck crane in the company warehouse load the materials required for the work to be done daily (pipes, connections, equipment for its commissioning using ratchet slings to secure the loads and drive the work area to the which is 1 to 3 hours away

2013/09 - 2014/12 Kodiak Wireline Services – Wire Line Operator

St. Albert Ab

Monitor the use of equipment in the work done for testing oil and gas wells, as well as verifying the correct use to achieve optimal performance. Computerize check beds pressure and depth for proper evaluation for the correct detonations of the opening gas mantles. Checking calibration dates and verify the proper maintenance of equipment, all of this work was performed according to programming and with the contractor’s consent in order to verify the well. Working under safety and environment regulations. The mounting of the equipment in the wells was carried out by us using an articulated arm crane (fassi 25 Tons.) mounted on a 3.5 ton picker. The daily work was to get to the general warehouse in which the crane stayed, to verify the orders of the ordered materials and to which area the materials, valves, pipes, connections, various equipment’s, pipes for electrical wiring, tubing would be taken, everything is insured with ratchet slings and hook and ratchet chains are sometimes used.

2012/05 - 2013/08 Estructuras y Mantenimiento Siglo XXl Construction Superintendent

Tampico México

Coordinating and monitoring the work performed for the construction project for offshore structures and platform decks. Pearl 3 verify the correct reception -. Delivering materials to be used in the execution of construction works, check the dimensions of the pipe mounted in the structures. This project is for the company Petroleos de Venezuela PDVESA.

2011/09 - 2012/03 Promotora e Inmobiliaria Sta. Elena Field Engineer

Tampico México

Supervise construction work and installation of offshore platform superstructure for kab-c.

Verification of assembly and welding work on secondary structure (jacket) and check the dimensions of the pipe mounted in the structures. Mounting frames and reinforced jacket, as well as full frame assembly for mounting superstructure.

2010/07 - 2011/07 Diseño y Proyectos Jan S.A. de C.V. - Construction Engineer

Tampico México

Supervisor in charge of mechanic, dimension of pipes and installation of metering skids in the PEMEX pumping stations / North PIPELINES. The installation of measurement skates devices that are used to verify loading and unloading of diesel and gasoline to the tankers. It also serves to check the flow in liters, as well as also know the amount in stationary tanks in pumping facilities, operation picker for mounting of pipes and valve.

2008/12 - 2010/05 Weatherford Partnership Canada - Wireline Operator

Grande Prairie Ab

Monitor the use of equipment testing the oil and gas wells, verify the optimal performance. Checked pressure and depth of the beds for proper evaluation for correct detonations to open gas mantles. Perform and verify the proper maintenance of equipment used and calibration dates. The work was done under highly qualified safety and environment requirements. The mounting of the equipment in the wells was carried out by us using an articulated arm crane (fassi 5 tons) mounted on a 3.5 ton picker or Hiab with 11 mts. Flat with crane of 20 to 35 tons. the crane was received daily in the general warehouse of the company loading the materials and equipment to use (pipes, electrical equipment, generators for electricity, liquids (gasoline, diesel, cleaners, greases) all secured with slings with ratchets.

EDUCATION

1989 - 1993 Autonomous University, State of Tamaulipas, México - Industrial Engineer

Autonomous University, State of Tamaulipas, México – Public Account

CERTIFICATION:

2012/07 to 2013/06 Industrial instrumentation Technician

2012/07 to 2013/06 Maintenance Industrial Valve Technician



Contact this candidate