Post Job Free

Resume

Sign in

Electrical Power, Installation, operation and maintenance engineer

Location:
Tripoli, North, Lebanon
Salary:
Experience is more Important than salary
Posted:
August 25, 2021

Contact this candidate

Resume:

PROFILE:

ALAA HASSAN RIFI

Electrical Power & Machines

Engineer

CONTACT

Address: Tripoli, North of Lebanon

Date of birth: 24 September 1996

Phone: +961-**-***-***

EMAIL: adoc76@r.postjobfree.com

PROFESSIONAL SKILLS

Accurate

Discipline

Multitasker

Ability to write reports

Attentive to details

Team Worker

Excellent communications skills

Good time management skills

HOBBIES

Football Player (BAU First

team)

EDUCATION

A fresh graduated engineer with knowledge and experience in various fields. Capable at managing high pressure situations and negotiating peaceful outcomes. Knowledgeable in office operations, computer programs and databases and report production. Looking for work that provides hands-on help to people in need.

Beirut Arab University

2015-2021

Team Leader in Final Year project Related in installation Design/Control for a Mall which includes:

Power/General sockets Design, Lights (DIALux: Lux, glare, uniformity) Design, Fire Protection, earthing, Lightning, Load estimation, Demand factor, diversity factor, Cable sizing, Circuit Breaking sizing, CAD drawing + Riser diagram using cad and Ecodial for single phase, automation Using Easysoft design for generator and transformer, and Etap design for flow analysis, Preventing Faults, and efficiency. With Full Marks

Final year project 1: A

Final Year Project 2: A-

Also Courses include: Power grid protection, Control, Renewable energy, Instrumentation and measurements, machine learning automation and Solid state Drives

WORK EXPERIENCE

Bus (Butec utility services) Akkar HALBA

Operation and maintenance

2019– 4 Weeks

Learned the fundamentals of Medium voltage Low

Voltage which includes installation/ Power flow/ Transformers. Assigned to be responsible of groups of workers that fixes the faults in MV/ LV Cables and to be able to fix them we have a lot of procedure must be taken into consideration to be 100% Safe For all employees. Paid Internship, big responsibility, time and decisions where critical in each case we had and we delivered perfectly.

Mashhour Company (Contractor)

Design and maintenance

2018 – 3 months

2017 – 3 months

2016 – 3 months

Learning the fundamentals of Medium Voltage, Low voltage, cable sizing, circuit breaker sizing and type of transformers. Assigned to supervise the designing process and guide the workers understand the sheets and circuit.

Lebanese Opinion Statistics: Research Assistant

October 2018- February 2020

- Implementation of activities of the MEAL plan in collaboration with the program teams

- Data extraction, analysis and reporting.

- Activity follow up and monitoring.

Data entry (IT)

In Election Party.

2018 (6 months)

Basketball Player (Marlias

school First team)

Reading Books Involved in

Electric Maps

Control Systems

And Tesla Vehicles

Interested in Cryptocurrency And All

Kind of investments (stocks).

- Activity Follow Up and monitoring

- Data extraction, analysis and reporting.

- Data entry of various Parameters with high accuracy under short period of time.

Final Year Project

Installation

2020–1 year

Installation For a 4 floors Mall that includes (Underground Parking, supermarket/ Shops/ gaming areas/ food areas and 3 Cinemas.)

- Power/general sockets installation + Calculations (NEC Standards)

- Lights installation (DIALux) + Calculation (Lux needed by standards, Glare luminous flux and uniformity rendering and different type of lights).

- Earthing installation RCD ( TT System, IT System, TNS System, TNC System)

- Lightning installation (NEC standards and British standards includes Protection angle, Mesh method, Rolling sphere).

- Fire protection installation (Heat detector, Smoke detector, manual call point). And types of installation conventional and addressable.

- Load estimations.

- Transformer properties for such system.

- Generator properties for such system.

- AutoCAD drawing for Power/ general sockets, lights, Fire protection, lightning and earthing.

- Cable sizing Using NEC standards and referring to cable de Liban catalogue

- Circuit breaker sizing using NEC standards and referring to Schneider CB catalogue.

- Riser Diagram single phase diagram RYB with balance using Cad.

- Single Phase diagram using Ecodial.

- HVAC System using British Health care and alfa Laval Standards.

- Flow analysis and Faults analysis, efficiency analysis if capacity bank needed or not using Etap.

- Automation control for transformer and Generator 3 phase using Easysoft for PLC and hardwired if PLC is not included. IC3 Profile Certification: Microsoft Office Software and Computer Expertise.

2020

- Center for Continuing & Professional Education (CCPE)

- Word Processing

- Spreadsheets

- Using Database

- IT Security

- Presentations

- Computer Essentials

- Online Essentials

MatLab & Arduino Course Certifications: Arduino-Simulink Implementation for

Mechatronics Systems course

2017

- Center for Continuing & Professional Education (CCPE):

- Implementation of sensors within industrial processes

- Control of industrial applications through control loops and sensors feedback.

SKILLS

Languages

Arabic(Native language)

English(Fluent)

French(Basic notions)

100%

90%

85%

70%

60%

80%

95%

50%

90%

100%

90%

Autocad

Dialux

Etap

Mplab

Matlab

Easysoft

Ecodial

C++

Activity Info

Kobo

Excel



Contact this candidate