JOEL FESLER
Quincy Illinois *****
****.********@*****.***
MISSION:
TO SECURE FULL TIME EMPLOYMENT AS A CERTIFIED PIPE WELDER OR PIPE FITTER. I KNOW I WILL BE A GREAT ASSET TO YOUR COMPANY.
EXPERIENCE;
25+YRS IN PIPE AND MECHANICAL TRADES IN HEAVY INDUSTRIAL CONSTRUCTION. CERTIFIED X-RAY CODE WELDER ON CARBON
STEEL, 9 CHROME, HASTELLOY, AL6XN AND STAINLESS STEEL. VAST EXPERIENCE IN TIG, NI-CROM-MO-3 & 4, SMAW, CERTIFIED
IN FOOD GRADE SANITARY PIPING TO PROCESS PIPING. VAST EXPERIENCE IN ETHANOL INDUSTRY. ALSO POWERHOUSE, FOSSIL FUEL, BOILERMAKER, TUBE WELDER. (CHEMICAL PLANTS)
WORK HISTORY:
Bhi energy from 08/01/2020 to 03/04/2021 combo pipe welder For bhi energy working on several complete automation projects in the automotive industry
Mechanical systems from 10/22/2019 to 7/15/2020
At Crystal sugar in Crookston Minnesota as a combo pipe welder
Msi
From 05/01/2018 to 10/22/2019
Works at Heartland corn products in Winthrop Minnesota as a certified combo pipe welder From 08/01/2017 to 04/01/2018 Hometown
Mechanical at gpc plant in muscatine, Iowa Certified combo welder. From 04/10/2016 to 08/23/2017
Starcon int. At lyondell basell petrochemical plant in Morris, il Certified combination pipe welder on all alloys b31.3 severe cycle x-ray code. From 04/12/2015 to 04/01/2016
Brahma group office in salt lake city, Ut. Worked at Monsanto plant in muscatine ia. Then transferred to Provo Utah job. Xray code b.31.3 carbon and stainless From 10/2011 to 04/09/2015
Starcon International
Corporate office in Manhattan,Il
Work performed at several petrochemical plants in Chicago and Joliet il area. Exxon Mobil Citgo, Marathon and Lyondell oil refinery’s. Certified pipe welder, B31.3 severe cycle, carbon steels, chrome, stainless steel, hastelloy, nickel, AL6XN, nickel, titanium alloys.
From 07/2011 to 10/2011
Tri-Tech construction
Keokuk, Ia
Certified combo pipe welder
From 05/2011 to 07/2011
United group services
Hemlock semiconductor plant
Clarksville, Tn
Certified combo pipe welder
FROM 3/2010 TO 05/2011
ZACHRY CONSTRUCTION @ MONSANTO CHEMICAL PLANT.MUSCATINE, IA CERTIFIED CODE X-RAY WELDER IN STAINLESS STEEL, CARBON / HEAVY WALL, BOILER TUBES, NICKEL, AL6XN, HASTELLOY, FLUX CORE, AND ALUMINUM. FROM 01/2010 TO 03/2010
MSI CONSTRUCTION
ADM CLINTON, IA
COMBO PIPE WELDER
FROM 10/10/2009 TO 01/2010
BECHTEL/BECON CONSTRUCTION TRIMBLE COUNTY UNIT 2 GENERATING STATION LOUISVILLE LG&E
BEDFORD, KY
CERTIFIED X-RAY CODE WELDER. HEAVY WALL, CARBON, STAINLESS STEEL, 9- CHROME, BOILER TUBE WELDER.
FROM 06/14/2009 TO 10/09/2009
A-LERT CONST
ADM PLANT CEDAR RAPIDS,IA
CERTIFIED COMBO PIPE WELDER
FROM 12/8/2008 TO 6/14/2009
LONG IND CORPORATE OFFICE IN BUFFALO, TX
WORKED AT THE ADM PLANT IN CEDAR RAPIDS, IA
CERTIFIED PIPE WELDER, X-RAY CODE IN CARBON AND STAINLESS STEEL, (TIG) FROM 9/8/08 TO 11/21/08
PLASS INC. CORPORATE OFFICE RED WING, MN
WORKED AT THE TATE AND LYLE PROJECT IN FORT DODGE, IA CERTIFIED PIPE WELDER CARBON AND STAINLESS STEEL (TIG)
FROM 4/08 TO 9/08
I.C.M. BLACKBURN CONSTRUCTION CO CORPORATE OFFICE IN EL DORADO, KS WORKED ON SEVERAL ETHANOL PROJECTS THROUGHOUT THE U.S CERTIFIED CARBON STAINLESS
FROM 5/07 TO 4/08
TRI-TECH CONST.CO CORPORATE OFFICE IN KEOKUK, IA CERTIFIED WELDER ON HEAVY WALL CARBON, BOILERTUBE WELDER. (X-RAY CODE) STAINLESS STEEL TIG SCH.10-SCH.80 SOME CHROME EXP.
FROM 3/06 TO 5/07
FAGEN INC. GRANITE FALLS, MN WORKED ON SEVERAL ETHANOL PROJECTS THROUGHOUT THE MIDWEST U.S. PIPE WELDER/CARBON STAINLESS STEEL-TIG FROM 8/05 TO 3/06
TIC
PIPE WELDER ETHANOL PROJECT
FROM 2/04 TO 7/05
KELLY CONST. PIPE WELDER WORKED THE ADM PLANT IN DECATUR, IL CERTIFIED IN CARBON
& STAINLESS STEEL.
FROM 5/03 TO 2/04
(APG) AMERICAN PIPE GROUP CORPORATE OFFICE IN ELDRIDGE, IA PIPE WELDER WORKED IN EDDYVILLE AND IOWA CITY, IA CERTIFIED IN CARBON STAINLESS STEEL PIPE.
(REFERENCES AVAILABLE ON REQUEST)