Resume

Sign in

Logistic Coordinator Drilling

Location:
Veracruz, Mexico
Posted:
October 31, 2021

Contact this candidate

Resume:

Renal Seijas

Calle Tramonto Cond. Bianco,

Intn. 20, Col. Zibata, CP. 76269

El Marques, Queretaro

Mexico Cell: +1-786-***-**** USA

ado7pj@r.postjobfree.com +525********* Mex

** / ** / ****

SUMMARY

Effective project leader and problem solver with advance skills in Operation Production & Logistic also a hardworking mentality. Seeking to apply expertise and extensive experience in SCM, Production, Purchasing, Warehouse and General Service to take on a challenging new role with a growing team.

PROFESSIONAL ACHIEVEMENTS

Refractory

Raw Material, Grinding, Laboratory (Recipe,Granulometry ), Mixed, Pressing, Drying & Sintered

Aluminun Cast house & Rolling Plant

Procure, Assembly, Start- Up, and Operations of Aluminun Smelting & Rolling For :

Tilting Melting Furnace up to 55 tns, Tilting Maintainer Furnacer up to 25 tns, Inline Degasser ( Rotor and Nozzoles), Filter Box ( Single & Double, Casting Table ( Hot – top & Wagstaff ), Homogenizing Furnace up to 40 tns, Cooling Chanber up to 40 tns, Hot Rolling Mill ( Reversing Roughning & Tanden ), Cold Rolling Mill 4HI, Continuous Casting ( Strip ).

Logistic

Purchase ( Local & International), Import, Traffic, Customs, Warehouse, Inventory Control, Transportation, General Service

Implement processes

Performance and ability to meet its objectives customer- and business-facing KPIs)

To improve the supply chain the materials into production and drilling material movement including receiving, storage, inventory control, transportation to the rig, cost reduction and supplier development.

Manage the supplier resource who are executing the tactical procurement activities to achieve the above objectives.

FIFO experience

Developed and write scope of works and manage tender packages

Knowledges of PDCA ( Plan – Do - Check - Act ), 5’S ( Sort – Set In Order – Shine – Standardize )

Promote DUPONT- STOP program and provide information on participation.

Conduct accident and incident reporting in Logistic area and support HSE team in investigation.

Internal Auditor for DNV Safety & Loss Control and The International Safety Rating System & ISO 9000.

Experienced in conducting DNV Safety & Loss Control and The International Safety Rating System & ISO 900 audits.

Led ISO Certification effort, which was granted on the first attempt.

SAP – MM ( Materials Management )

Preparation of budget, plan and objectives.

Tendered including presentation to the committed

Participate in screening of prospective all contractors’ capabilities to execute the project effectively Review contractual terms and conditions to insure Company requirements are met for all contracts/purchase orders. Coordinate Project Management Team’s (PMT) Procurement, traffic and Warehouse for long lead Items in the Debottlenecking and Main Shutdown project for a Refinery.

Drilling/Production Contract and Purchase. (MM-SAP System). Negotiate claims and mediate contract disputes. Perform selective audits of invoicing. Provide contract interpretation for employees directing the contractor’s work and Training adviser. Provide monthly progress reporting for contract being administrator. Field Warehouse Drilling and Production. (MM-SAP System). Warehouse facility and transportation.

Manager all freight forwarding, custom, inspection and inland transportation activities in different projects.

Logistic for drilling and work over, Including: Planning, Inspection, Locations preparation, Transportation, Lifting Equipment, Vacuums, Materials and Services to execute the drilling and work over programs. Inventory control for Drilling Spare Parts and Equipments. Contract administrated for vacuum track, Transportation and Lifting Equipment, Franc Tank, Rig move

CAREER PROFILE

Oct.2018 – Until now Extrusiones Metalicas, San Jose Iturbide, Mexico

Cast House Manager

July 2015- July 2016 Rigworld Service,L.T.D Ghana, West Africa

General Logistic Manager Transatlantic Catering Division

July 2010 – May 2015 M & S Multiservicios

PETROCEDENO FIELD San Diego de Cabrutica Orinoco Oil Belt

Project Logistic Manager

July 2008 – May 2009 NEPTUNE MARINE & DRILLING Pte Ltd. Muelle Seco Guaraguao,Pto.La Cruz Venezuela. Logistic Coordinator

PETROBOSCAN ( PDVSA – CHEVRON TEXACO )Maracaibo Venezuela, Dec.2006 – May.2008

Drilling & Completion Contract, Procurement and Logistic Coordinator

SINCOR REFINERY PLANT (TOTAL / PDVSA /STATOIL ) Jose Pto. La Cruz, Anzoategui, Venezuela, Jan.2004 – Jan.2005.

Construction Site Contract, Procurement & Warehouse DMS Project Coordinator

SINCOR PRODUCCION PLANT (Strategic Association formed by TOTAL France,PDVSA Venezuela & STATOIL Norway).Project cost: $4000 millions(350 Oil Wells, PipeLines & Oil Plant Facilities of 200.000 Barrels/day). Pariaguan, Anzuategui, Venezuela. FEB.2000 – Jul.2005.

Contract, Procurement and Logistic superintendent.

PIVENSA Pto. Ordaz, Bolivar, Venezuela. 1993 - 1999

Contract, Procurement and Logistic Manager

C.V.G ALCASA Pto. Ordaz, Bolivar, Venezuela. 1987 – 1989

Chief Project Engineering

EDUCATION

1989 – 1991. Post- Graduate Studies in Material Science

U.C.V / UNEXPO Pto. Ordaz, Bolivar, Venezuela

1976 – 1981. B.S in Metallurgical Engineering

University of Alabama Tuscaloosa, Al, U.S.A.

1968–1974 Electrical Technician

Escuela Tecnica Industrial Bolivar,Venezuela.



Contact this candidate