Post Job Free
Sign in

Piping Designer Chemical Co

Location:
Rosharon, TX, 77583
Posted:
October 30, 2021

Contact this candidate

Resume:

LLOYD B. LANGFORD

RÉSUMÉ

*** ******** ***.

Rosharon, TX 77583

Home: 979-***-****

Work:

Cellular: 979-***-****

**********@*******.***

TWIC good thru 4-10-2024

OBJECTIVE A position as Sr. Piping Designer utilizing my background in the Petrochemical

& Refinery Industries.

SUMMARY. 20+ years as Piping Designer/Sketcher, using Bentley Plant, PDS and Pro pipe.

. 16 years hands-on as Pipefitter and Foreman

. 6 years as Process Operator

EDUCATION. APPRENTICESHIP: Journeymen Pipefitter, 1984

& TRAINING. HORN DRAFTING & CAD CENTER: Auto-CAD, Rebis using Pro-Iso and CAD Pipe

. COLLEGE OF THE MAILAND: Basic Microstations 3.2

. SOCIETY OF PIPING ENGINEERS & DESIGNERS: Intergraph PDS 1 & 2

. BRAZOSPORT COLLEGE: 32 hours toward an AA Degree in Industrial Arts

. DOW CHEMICAL CO. : Extensive safety training - knowledge of regulations and procedures

WORK

HISTORY

01-23-20 ICS; Instrument fitter and pipefitter. Work on tubing jobs, maintenanence and shut present down work.

10-01-18 With S&B Engineering and Constructors

04-18-19 walked down P&IDs for Dow Chemical Company in Freeport, Tx 4-23-15 With S&B Engineering and Constructors;

7-7-16 Design piping for small turn around jobs. Using CAD Pipe and Bentley Plant 3D 8-30-13 With Furmanite Technical Solutions;

4-09-15 Piping Designer; On loan to Huntsman site; Freeport. Texas. Field sketch and design various maintenance and capital piping projects. Make sketches for Fabrication and installation of piping systems.

5-02-11 With ENGlobal Engineering

8-30-13. Piping Designer;

Design piping for small capital and maintenance jobs for BASF in Freeport, Tx.,

. and Philips in Sweeny, Tx. using Bentley 3D & PDS. 1-18-10 With S&B Engineering

4-22-11 Walk down equipment from P&ID,s to verify against equipment drawings. Also done as-builts on some of the equipment. With S&B Engineering, Houston, Verifying equipment on reliability project. Checking nozzle sizes, ratings and locations against P&ID's and inspection drawings. Tx. (Ellington office) 6/09 With ICS

1/15/10 Instrument fitter. Install tubing according to P&ID's. Pressure check systems. LLOYD L. LANGFORD

RÉSUMÉ, Page 2

10/05 With Solutia, Chocolate Bayou,Tx. Under contract 7/31/06 Day & Zimmerman

Piping Designer

Field measure & sketch existing & new piping for maintenance & shutdowns Using microstations

10/02 With D O W C H E M I C A L C O M P A N Y, Freeport TX - Under contract 10/05 KELLY SERVICES

Maintenance Planner

. Plan maintenance activities for daily work and shutdowns

. Study plans, P&ID's, take pictures, prepare sequence pages to match scope of work

. Coordinate activities with schedulers to job completion 06/01- With U.S. CONTRACTORS

10/02 . Designed from the field for Small Project Group included measuring and sketching

. Built working drawings for crafts to be used in fabrication and installation 04/98- With H&M DESIGN

10/98 CAD Operator

. Used Flextabs, IDS Pipe, IDS ISO, release 13 & 14

. Performed field measurements and shooting of elevations

. Tied down equipment using string lines and plumb bobs S K E T C H E R / F A B R I C A T O R M U L T I - C R A F T 1999- With DIVERSIFIED PLANT SERVICES

2001 Field Foreman, Pipefitter, Surveyor, Sketcher, CAD Operator, Fabricator, and Bolt-up Boilermaker

. Installed piping systems, beams and braces

. Worked on new plant systems and shutdowns

1997- With U.S. CONTRACTORS

01/98 . Built pipe from isometric sketches

D O W C H E M I C A L C O M P A N Y, Freeport, TX - Direct employee 1983- P I PE F I T T E R

1997 . Measured and selected pipe run

. Fabricated pipe and installed in the field

. Removed and demolished pipe

. Removed and installed valves

. Performed instrument fitting function

LLOYD L. LANGFORD

RÉSUMÉ, Page 3

1978- P R O C E S S O P E R A T O R

1983 . Controlled the manufacture of chemical products including

. taking samples and submitting to the lab for analysis and possible correction of settings

. ensuring that flow and materials were within specification

. Monitored and operated pumps, valves and compressors

. Performed regular equipment maintenance

. Unloaded tank trucks delivering chemicals

REFERENCES

. upon request



Contact this candidate