M.SYED IBRAHIM
Contact Mobile Numbers.
+971**-******* (UAE)
Email address.
ado5ta@r.postjobfree.com
PERSONAL PROFILE:
Date of Birth:
6
th
Dec 1987
Gender: Male
Age : 32
Nationality: Indian
Marital Status: Married
M.SYED IBRAHIM B.Eng., MSc Eng (UK).,
FIDIC
(Sharjah Municipality approved)
RESUME
OBJECTIVE
To serve a progressive organization, that offers an opportunity to take up challenging work, shouldering more responsibilities and be an important member of a team in helping the team to perform & flourish in accomplishing corporate goals.
ACADEMIC RECORD
FIDIC 3FOLD Institution,
Karama, Dubai
Post Graduate MSc Structural Engineering,
Cardiff University,
Wales,
United Kingdom.
Under Graduate B.E Civil Engineering,
Meenakshi Sundararajan Engg. College,
(Affiliated to Anna University),
Chennai. ( Tamil Nadu, South India)
SOFTWARE EXPOSURE
CIVIL DESIGN : AUTO CADD, DWG TRUEVIEW
OPERATING SYSTEM : Windows (8 & 7).
PACKAGES : MS OFFICE & ABILITY OFFICE
Strengths
Leadership
Management
Hard work
Self Confidence
Team Work
Adaptable to any situation
Linguistic Abilities:
English
To Speak
To Read
To Write
Hindi
To Speak
To Read
To Write
Tamil
To Speak
To Read
To Write
TOTAL WORK EXPERIENCE: 8 yrs.
Working with M/S AL GURG CONSULTANTS, DUBAI/UAE since 05 Oct. 2015 onwards
Position: Consultant Engineer
Responsibilities:
o Preliminary checking of submittals and shop drawing as directed by RE. o Direct the contractor to handle authorities inspection and record authorities comments to ensure the contractors response o Respond contractor’s request for inspection, handle the inspection as per approved shop drawing and submittals
o Monitoring and administering the QA/QC Plan and ensuring incorporated materials and workmanship on construction projects are in compliance with the plans and specifications and also issue the NCR/Field Instructions if it failed.
o Follow up and inspect the contractor’s corrective actions and contractors de-snagging.
o Following up the concreting works, slump test and cubes preparation for the compressive test.
o Checking finishing work such as block work, plaster, painting, tiling, kitchen cabinets, wardrobes, ceiling and light fittings etc. o Maintaining standards of safety and comply with Company’s Health, Safety and Environment Management System requirements.
o Follow up client’s comments during defect liability period as determined in the contract and ensure proper corrective action is done. o Any other task assigned.
Worked with M/S BELHASA ENGINEERING & CONT. CO.
(LLC), DUBAI/UAE since 04 Mar. 2013 – Sept. 2015
Position: Site/Project Engineer
Responsibilities:
Monitoring RFI, CVIR, NCR and other project related documents.
Studying Clause 14 Master program and assisting project planning dept. to update and modify programs as per site requirements.
Monitoring Productivity of workers; getting the work done with minimum material and labor as per program and budget with quality.
Monitoring material procurements as per project requirements.
Arranging safety meetings and coordination with safety staff to lead the project as per requirements.
Worked with M/S ULCCS IT Infrastructure (P) Ltd; Calicut, Indiam since 2012 – 2013
Position: Internship
Project
UL Cyber Park, Special Economic Zone (SEZ), Software Development Block
– 1
Consultants
Master Plan – Nikken Sekkei, Japan
PMC – Diligent Project Management Consultants, India Structural – CRN Architects and Engineers, India
List of Projects Handled:
Current Projects:
1. Project: Private Villa, Warehouse
Client: Eagle hills Abudhabi
Consultant: M/S Al Gurg Consultants, Dubai
2 Project: 10 Private Villas, ADNOC and Enoc 1603 station Client: Private, ADNOC and ENOC
Consultant: M/S Al Gurg Consultants, Dubai
3 Project: ENOC Filling station Site 1082, 1023, 1045,1603 Client: M/S Emirates National oil company (ENOC)
Cost of Project: 16 Million, 12 Million, 14 Million AED Consultant: M/S Al Gurg Consultants, Dubai.
4. Project: Emarat Filling Station Ramala, Tallah, Muwaffjah, Saffiya Client: EMARAT Corporation
Consultant: M/S Al Gurg Consultants, Dubai
.
5. Project: B+G+3+Health Club
Client: Al Wasl Properties
Cost of Project: 83 Million AED.
Consultant: M/S Al Gurg Consultants, Dubai.
6. Project: Dubai Government workshop Ruwayyah /UAE Client: Rulers Court
Cost of Project: 300 Million AED.
Consultant: M/S AL Gurg Consultants, Dubai.
7. Project: 2B+G+3P+14+Roof Commercial & Residential Building, Al Barsha, Dubai/UAE
Client: Al Badri International.
Cost of Project: 82 Million AED.
Consultant: M/S Design Concept, Dubai.
8 Project: 2B+G+9+Roof Commercial & Residential
Building, Muhaisanah, Dubai/UAE
Client: Al Badri International
Cost of Project: 63 Million AED.
Consultant: M/S Design Concept, Dubai.
9 Project: B+G+8+Roof Commercial Building, [The Edge] Client: Sweid and Sweid Real estate Investment
Cost of Project: 43 Million AED. (Only Structures) Project Management : Arcan Project Management service Consultant: Brewer smith brewer gulf [BSBG]
10.Project : UL Cyber Park, Special Economic Zone (SEZ), Consultants:
Master Plan :Nikken Sekkei, Japan
PMC :Diligent Project Management Consultants, India Structural : CRN Architects and Engineers, India
PAPERS PRESENTED
Self-Compacting Concrete in NIT, Trichy (India)
Green Building Concepts in construction in ANNA UNIVERSITY
(India)
Application of GIS & GPS in traffic management in OSMANIA UNIVERSITY, Secundrabad & PSG TECH, Coimbatore (India). Coastal erosion & Prevention methodology in GCE, Salem. & A.C Tech. (India).
Presented papers in several other colleges and universities all around India.
ACADEMIC PROJECT EXPOSURE
POST GRADUATE PROJECT
Title: Study of Concrete fracture due to High Impact loading Description :
This project carries out a comparative study between the results obtained by the numerical simulation analysis done for the concrete that is subjected to high impact loading. For this the similitude results obtained using various methods such as SPH (Smooth Particle Hydrodynamics), FEM, Applied element method and hydro-code is compared with experimental observations obtained. This relative study is carried out to enumerate the advantages and limitations of each method and to make comparative study with other methods
UNDER GRADUATE PROJECT
Title : Implementation of Micro silica in Green Concrete Description :
This project deals with the study of difference in strength due to addition of micro-silica in fresh green concrete as an admixture .This is done by substituting some percentage of micro-silica to that of sand, this is done in various percentages and the variation in strength is observed to find out the best suitable percentage the micro-silica can be added as an admixture to gain better efficiency of the concrete.
UNDER GRADUATE DESIGN PROJECT
Title
Description
:
:
“Design on Public Health centre”
The project is aimed at designing a Public health centre which comprises of 4 floors covering an overall area of 2000 square metre.
EXTRA CURRICULAR ACTIVITY /ACHIEVEMENTS
Won prize in Quiz competition in NIT, Trichy.
Won prize in E-CUBE in home college.
NCC Cadet; attended camps and passed certificate “A” exam. Member of Indian Society for technical Education.
Member of IIET Lions Club.
SEMINARS ATTENDED
● CEAFEST,INDIAN INSTITUTE OF TECHNOLOGY (Madras)
(Architectural engineering)
● Aqua 07 (Water resources management)
● WAFES 05, 06, 07,08(National level technical symposium) LEADERSHIP QUALITIES
Chief Coordinator for National level technical symposium held in our college (India)
Major Clients Worked with: