Personal Data:
Age : **
Sex : Male
Father Name:
G.MUTHUKRISHNAN.
Nationality : Indian.
Passport No : J6940886.
Passport valid:22.07.11 to 21.07.21
Marital Status: Married. Languages Known:
English & Tamil & Hindi.
ADDRESS :103,Kumarar
street,
Tuticorin-2
C License Details:
‘C’ license Number: C 47498
valid : 30.09.15 to 29.09.2023 Issued by : Tamilnadu govt.
Electrical licensing Board.
Total Experience:
4 Yr in Electrical Erection in overseas.
5 Yr in Electrical Maintenance in
india.
Field Talent:
Electrical supervisor in electrical installation and cable laying and termination.
panel, Motor and transformer testing.
QA/QC Technician in document handling and testing.
Supervisor in shift handling
Engineer in site installation and maintenance
Objective
Seeking a challenging assignment in organization of repute which provides me avenues for learning and encourages individual growth and Self motivated, hard working and goal-oriented, with a high degree of flexibility, resourcefulness and commitment.
Education
B.TECH - Electrical engineering
Distance education (DEEMED) (72%)
DIPLOMA - Electrical & Electronics
Engineering(72%)
H.S.C - Caldwell Higher Secondary School,
Tuticorin. (75.8%)
S.S.L.C - C.M Higher Secondary School,
Tuticorin. (67.8%)
PROFESSIONAL EXPERIENCE
INSTALLATION AND MAINTENANCE:
Generator :
Condition base monitoring Preventive, Breakdown and Periodical maintenances.
Transformers :
Installation and Preventive, Breakdown and Periodical maintenance of transformers, volt,amp, etc
Circuit breakers :
Installation, Preventive, Breakdown and Periodical maintenance of SF6 & VCBs up to 11KV, and ACBs up to 415V.
Protection systems :
Installation, Testing, Trouble shooting and Maintenance of protection relays.
Motors :
Installation, Testing and Preventive, Corrective/Condition monitoring, Breakdown, Periodic maintenance and over hauling of HT as well as LT motors..
HT and LT panels :
Installation, Testing and trouble shooting and maintenance of LT and HT panels.
Cables :
Knowledge about XLPE, PILC [up to 11 KV], FRLS. PVC and TRS cables and their terminations and testing of cables including HIPOT test.
DG sets :
Maintenance and operating of DG sets up to 1010KVA.
CURRICULUM VITAE
M.SIVAGURUNATHAN(D.EEE)
Mobile No : 989-***-****
Email : ado2n1@r.postjobfree.com
Work Experience
Present Experience:
Name of Concern : OEG INDIA PVT,LTD
Name of the Site : VVTi Pigments Pvt Ltd., (6MW Power Plant),
Location : Sipcot Industrial Complex, Tuticorin.
Name of position : Shift Engineer (ELECTRICAL)
Duration : 02 Year+ (From MAY 2019to TILL )
Preprevious Experience:
Name of Concern : YANG EQUIPMENT PTE,
Name of the Site : Singapore
Name of position : SUPERVISOR (ELECTRICAL)
Duration : 01 Year+ (From FEB2018 to APR2019 )
Name of Concern : KAYGEE CONTRACTOR, CHENNAI
Name of the Site : COASTAL POWER PLANT, Tuticorin.
Detail : 2 X 600 MW STEAM TURBINE GENERATOR POWER PLANT
Name of position : SUPERVISOR (ELECTRICAL)
Duration : 02 Year+ (From MAY 2016 to FEB 2018 )
Name of Concern : WARTSLIA INDIA LIMITED, Chennai.(VARITY SERVICE PVT LTD)
Name of the Site : STERLITE INDIA PVT LIMITED, Tuticorin.
Detail : 2 X 80 MW (160 MW) STEAM TURBINE GENERATOR POWER PLANT
Name of position : SUPERVISOR (ELECTRICAL)
Duration : 01 Year+ (From MAY 2015 to MAY2016 )
Concern : PLANT ELECTRICAL AND INSTRUMENTATION PTE LTD.
Name of the Site : SHELL (BOKOM COGEN PROJECT) PVT LTD;
Location : SINGAPORE,
Name of position : SR.ELECTRICAL TECHNICIAN & SUPERVISOR
Duration : 1 Year (From MAY2014 to APR 2015)
Name of Concern : KURIHARA KOGYO CO;LTD.
Name of the Site : CHEVRON ORONITE PVT LTD;
Location : SINGAPORE,
Name of position : SR.ELECTRICAL TECHNICIAN
Duration : 2 Years (From MAR 2012 to FEB 2014)
First Experience:
Name of Concern : MAHESHWARI ELECTRICAL;
Job Nature : Electrical Installation;
Name of position : ELECTRICAL TECHNICIAN
Duration : 2Years (From MAY 2010 to Feb 2012)
Achievements & Awards:
●Successfully Erection and commissioning was Done for COGEN project in Singapore.
●Co-operated in Testing of Motor and Transformer with testing Engineers.
●Co-operated in Testing of Metering & Protection equipments (CT, PT, Lightning arrestor, VCB, etc.,) with Testing Engineers
●Following safety and our industrial rules and regulation.
●Co-operate with our management and new rules implementation and give some good ideas to improve our management in safety and management orientation.
●Spare and Tools management in supervising time.
●Planning was done for Annual shutdown and completed the Jobs as per the planning in Sterlite industries Power plant.
Roles & Responsibilities:
●Electrical Supervisor (cable laying & termination) in substation.
●Electrical Supervisor (ladder, tray & panel) installation.
●QA & QC Technician (Drawing and document preparation) as per client instruction..
●Quick Learning ability of complicated drawings and circuits.
●H.T & L.T Motor Bearing fixing and testing.( inner and outer Dia.,)as per standard.
●Control and Maintenance & STEAM Turbine Generators up to (2 X 80) MW .
●Installation and Maintenance of several types Protection Relays & circuits (Digital& Analog). In the make of ABB, SIEMENS, AREVA & ALSTOM RELYS.
●Installation and Maintenance of 230 KV Switch yard with 4 Nos. of BAYS with station transformer.
●Maintenance of SF6 breakers up to 4000Amps, Vacuum Circuit Breakers
Up to 630 Amps and Air circuit breakers up to 4000 Amps.
●Operation & maintenance of All LT and HT Electrical motors (AC &DC).
●Maintenance of Transformers up to 250MVA.
●Maintenance of D-O-L, Star-delta, Soft Starters with DCS controls.
●Maintenance VFD Drives With Remote control..
●Overhauling & Maintenance of Several Type of Motors.