DOMINGO ANDAL MARALIT
***Talaibon, Ibaan, Batangas
Cell Phone No.: 091********
Email: ado1u5@r.postjobfree.com
POSITION DESIRED: RIGGER
Career Objective
To work hard with full determination and dedication to achieve organizational as well as personal goals.
Personal Information
Date of Birth: July 22, 1971
Place of Birth: Talaibon, Ibaan, Batangas
Age: 49
Gender : Male
Civil Status: Married
Height: 5’6
Nationality: Filipino
Religion: Roman Catholic
Language Spoken: English and Filipino
Employment History
SNAM PROGETTI, SAUDI ARABIA LTD.
Khurals ARAMCO Project
November 6, 2016 - September 10, 2017
Rigger
JOB DESCRIPTION
Erection of pipes and pipe pulling inside the pipe rack
Loading and unloading of pipe materials
Check and inspection lifting gears, shackles, slings and lifting equipement
All area is secured and proper safety barrication
Before start erection check the lifting permit and toolbox meeting.
SAUDI ARABIAN BECHTEL COMPANY (SABCO)
Riyadh Metro Rail Project
September 30 2015 – June 10 2016
Viaduct Segment Erector IW/ Rigger
JOB DESCRIPTION
Check and inspection lifting gears, shackles, sling and other lifting equipment’s.
Setting the crane and proper ground good condition
Erection of viaduct precast materials
All area is secured and proper safety barrication
Before start erection check the lifting permit and toolbox meeting.
WOOLIM PLANT ENGINEERNG & CONSTRUCTION CORPORATION
Azito Power Plant Project, Abidjan COTE D’IVOIRE
April 5, 2014- March 4, 2015
RIGGER
JOB DESCRIPTION
Lifting and erection of structures, pipes and mechanical materials
Loading and unloading of structures, pipes and mechanical materials
Setting the cranes and check proper ground condition
All area is secured and proper safety barrication
Before start of erection of structure and pipes, check all lifting gears, slings, shackles and proper color code and used two taglines.
SEJONG CORPORATION
Koniambo Nickel Project, New Caledonia
January 10, 2011 – September 27, 2013
RIGGER
JOB DESCRIPTION
Loading and unloading of structure and pipes mechanical materials
Assemble of structure and erection of columns, beams, bracing and assemble roof panels
Erection of mechanical materials, motor, generators
Setting the cranes and proper ground and good condition
All area is secured and proper safety barrication
Check all lifting gears, shackles, slings and proper color code
Check the lifting permit
SEJONG CORPORATION
Quafco 5 Project, Messaieed, Qatar
May 07, 2009 – May 01, 2010
RIGGER/MANLIFT OPERATOR
JOB DESCRIPTION
Operate manlift for erection and assemble of structure
Erection of pipes materials
Loading and unloading of pipes, structure, mechanical materials
Setting the crane and check the ground condition
Inspection all lifting gears, shackles, slings and correct color code
Check all lifting area and proper safety barrication
Good communication to crane operator using correct hand signals & radio
WAN CHI STEEL INDUSTRIAL CO.LTD.
Formosa Petrochemical Corporation
Lube Base Oil Project
Mai-liao,Yun-Lin Country,Taiwan R.O.C
April 30,2007-April 24,2008
RIGGER
JOB DESCRIPTION
Loading and unloading of pipes materials
Installation of pipes in the pipe rack using chainblock
Setting the crane and check the ground condition
Check all lifting gears and correct color code
All area is secured and proper safety barrication
Good communication to crane operator using hand signals & radio
HANYANG CORPORATION
Sohar Aromatics Project (SAP)
Falai Al-Qabail, Sultanate of Oman
January 08, 2005 – February 20, 2007
RIGGER
JOB DESCRIPTION
Loading and unloading of structures, pipes and mechanical materials
Assemble of structure materials
Erection of structures, pipes and mechanical materials
Setting the crane and check ground level
Check all lifting equipments shackles, slings and correct color code
All area is secured and proper barrication
Good communication to crane operator using hand signal & radio.
YAHYA AHMED RAQWANI COMPANY LTD FOR TRADING AND CONTRACTING
ARAMCO WIELL SITE PROJECT
February 11, 2018 – August 5, 2020
RIGGER II and RIGGER III
Other Skills
ManliftOperator,Mechanical/Structural Steel Erector
Educational Background
Secondary: Saint James Academy
Ibaan, Batangas
1984 - 1987
Primary: Ibaan Central School
Ibaan, Batangas
1979 - 1984
Character References
Mr. Song Ki Min Project Manager
Sejong Corporation
New Caledonia
Mr. Marsevic Mendoza Brgy. Captain
Talaibon, Ibaan, Batangas
Hon. Danny Toreja Municipal Mayor
Ibaan, Batangas
I hereby certify that the above information is true and correct to the best of my knowledge.
Domingo A. Maralit
Applicant’s Signature