MILTON GRANADOS CASTRO
******.********.******@*****.*** +1-979-***-**** +57-304-******* https://www.linkedin.com/in/miltongranados/
BILINGUAL PROJECT MANAGEMENT / ENGINEERING PROFESSIONAL
Define and control work scope, change management and sales collaboration for future projects.
Ability to influence across multiple functional groups.
Driven to control (OTD) on time delivery, cost reduction and maintain the profit margin on each project.
Involved in cost evaluation for quotes.
Customer focus on evaluating future opportunities on CRM
Mechanical Engineering experience in 3D modeling ( Inventor ) and Mathcad calculations for subsea BOP control systems and surface wellhead and Christmas Trees
Performed SIT for Drilling equipment
Committed to exceed deadline targets, proactive, influential, collaborative problem solver.
Fluency in Spanish and English.
Continuing Education: Microsoft Project 2010, Microsoft, Autodesk Inventor 2010, AutoCAD 2010, PRO-E Wildfire 2, Visual Basic, ANSYS, SAP, CRM, Revit 2017
PROFESSIONAL EXPERIENCE
INVESTOR - AIRBNB RENTAL PROPERTY MANAGEMENT 12/2019 – Present
https://airbnb.com/h/milton-suite802-medellin
https://airbnb.com/h/class-suites-1701-bogota
BRAYTON TECHNOLOGIES LLC 12/2015 – 12/2019 Project Manager / Consultant / Contractor
Project management and Engineering consulting for small businesses. Creating connections between American and Latin American companies. Online marketing strategies and campaign management.
Powell Industries (3/15/2018 -9/15/2018): Project Manager Contractor. Commissioning and testing project management for Metro North Rail PCR stations at Croton Harmon, Riverdale, Tarrytown and Brewster New York Metro stations.
SLB CAMERON INTERNATIONAL 05/2007 - 12/2015
Project Manager Sr, Latin America 05/2013 - 12/2015
Managed and delivered wellhead and Christmas trees from multiple Cameron Plants (Oklahoma City; Veracruz, Mexico; Argentina; Brazil and Romania) for Latin American customers. (Shell, Total, YPF, Repsol, Panamerican Energy, between order customers).
2013: Recuperated a project within 6 months working with the customer implementing a fast and collaborative strategy between different manufacturing plants.
2014: Delivered a 20MM project for YPF in Argentina within time and budget despite the difficult approval of Declaration of Importations by the Argentinian government. Subsequent orders were placed for 2015-2016 for 20MM
2015: Delivered newly-designed wellhead Projects for Repsol Peru that entailed very specific testing on the sealing area
Managed manufacturing, margin control, forecasting and cost control by following project schedule and managing changes closely with mitigating actions.
Delivered monthly project status financials and IOI (Items of Interest) reports for senior management
Milton Granados Castro 979-***-**** 57-301-******* ******.********.******@*****.*** Page 2
Work directly with Engineering, Procurement and Manufacturing within Cameron Plants to evaluate project status and risks by interfacing directly with Engineering, Procurement and Manufacturing within Cameron Plants.
Senior Mechanical Engineer (Cameron Surface) 09/2011 - 05/2013
Designed wellheads (API 6A) for surface equipment, checked and approved BOM. Worked with AutoCAD and Autodesk Inventor models as well as Ansys for Finite Element Analysis. Developed stress calculations for components in MathCad
Project / Mechanical Engineer III (Cameron Drilling Controls) 06/2007 - 09/2011
Experienced with surface and subsea Drilling Control systems
Applied codes and standards (API 17 D, ASME) at all design control units, and (DNV, ABS) when third party inspection was required.
Created hydraulic schematics, Factory Integration tests and Systems integration tests to ensure quality and performance.
Performed surface and subsea design calculations and accumulator sizing calculations
Performed SIT for BOP Stack up Drilling equipment
Experienced with structural designs for skid packages
Evaluated engineering aftermarket solutions when customer changes and modifications required.
Prepared quote requirements
Guided and coordinated efforts of draftspersons and technicians
Supported field service activities
Completed Projects: Seadrill 8, Seadrill 9, Petro Rig 1, Petro Rig 2.
EDUCATION
Bachelor’s Degree, Mechanical Engineering
University of America, Colombia, SA 1997
Master’s Degree, Project Management
Keller School of Business, Houston, TX 2013
PROFESSIONAL DEVELOPMENT
Microsoft Project 2010 Microsoft Office 2010 Autodesk Inventor 2010 AutoCAD 2010
PRO-E Wildfire 2 Visual Basic 5.0 and 6.0 ANSYS SAP CRM Revit 2017