Resume

Sign in

Technician Maintenance Planning Engineer

Location:
Cerritos, CA
Posted:
July 31, 2021

Contact this candidate

Resume:

RODRIGO C. NOFRADA

***** ****** ***. #**

CERRITOS CA, 90703

559-***-****

adnzgr@r.postjobfree.com

EXPERIENCE:

TECHNICIAN MAINTENANCE SERVICE / MANAGER

H.A. PASTOR CONSTRUCTION CORPORATION

RM 305 CSP BLDG, 815 QUEZON AVE., QUEZON CITY PHILIPPINES

(FEB 2013 - JUN 2018)

● Manage and oversee the day to day maintenance work of apartments and condominium as per the company maintenance standard and procedures. Performs and delegates the operation and maintenance of all utilities and appliances furnished by the company, included on rental contract of apartments or offices. The preventive or scheduled cleaning, I&R and O&M requirements like the HVAC, electrical & low voltage cables Cat 3,5,&6, AV & Coax, CATV, plumbing, painting, refrigeration, oven, gas range dishwasher, sink, shower heads and comfort rooms seat and washing machine.

● Assign work orders, participate and lead the maintenance works. Tracks the open and closed work order and complete the paper works.

● Keep maintenance schedule of apartments and condos, the vacancy and ready for rent and ready for occupancy.

● Maintain utilities as per the standard operation practice (SOP) of all installed company property equipments and maintain the cleaning of the premises and surroundings.

● Supervise, monitor the incoming flow of maintenance works or delegate to the technicians with guidance that works should be done as per the company procedures and standard for smooth operation and foremen to monitor the technicians work man hours and the project should be completed within the timing completion or individual work, for the satisfaction of resident or owner.

● Supervise the preparation of Bill of Quantities for the purchasing of maintenance materials.

Recommend to prepare open sub-contract for HVAC and emergency power generator for residence living convenience.

● Prepare schedule of the on the job training for new technician or assistant technician for the

improvement of service and workers work confidence.

● Manage/Oversee the Annual Budget preparation covering the total maintenance budget requirements

for the branch covering my assignment, including manpower and materials unforeseen budget.

● Prepare memo for monthly meeting schedule with accomplishment reports for all owners, managers, contractors and municipality engineering for all maintenance business.

SENIOR STAFF ENGINEER- EXTERNAL WORKS & PLANNING

ETISALAT TELECOMMUNICATION CORPORATION

ABU DHABI (WESTERN REGION), UNITED ARAB EMIRATES

(OCTOBER 1989 - NOVEMBER 2003)

● Management, Supervision, Outside Plant Engineering & Design and Construction of all aspects of fiber optic, co-axial and copper cables in the outside plant civil works underground manholes & handholes, ducting, buried dig & plowing of cables upto distribution Cabinets, including aerial poles messenger wire & cable lashing networks. Oversee the functions of Planners, Inspectors and civil works Engineers on their Supervision assignment to different Contractors on the construction of fiber optic & coaxial Projects.The functions of field technicians for the fiber and coax cable splicing, installation and maintenance, warehouse materials requisition and wayleave follow-up from concern municipalities and other utilities involved on the area of work or project. These Main Fiber Optic Projects from Sila- Qatar border 450 Km. to Abu Dhabi, ETISALAT main Central Office and provision Of Small Cell Repeaters on solar powered every 28 Km. were provided.

● Supervise and assign personnels, foremen for their different work assignments and the works to be done as per schedule of work and budget for completion, what machines are required and as per the proper procedures, standards, and the crew of civil works inspector, for the safety of all utilities and to confirm that the daily inspection works are kept in documentations to be reflected on the asbuilts drawing of underground ducts and aerial, fiber optic, coax and copper cable routes for final plan and for future reference.

● Supervise the coordination with the broadband field technicians, personnel in order to provide support in case of outage and restoration of any particular network location for smooth traffic transmission and coordinate the works progress with the sales staff, marketing and engineering. Review the project before kick-off to avoid damage to other utilities. Have a smooth project construction and completion as per the scheduled time frame of any project or work. Prepare memo addressed to the finance division via the engineering Manager for project completion payment and close-out.

● Organize meetings with other groups, internal or outside the company to be aware and device early solution on problems that may affect the company’s operations or project delays. Meetings with the municipalities and contractors and owner concerning any new developments, wayleaves and other company utilities involved in the projected route of fibers, coax, ducting and aerial projects, including inside plant cabling, installation on buildings entry points, distribution boxes upto amp module, router or modem.

● Supervise the fiber optic and cabling installation, splicing on both underground ducting and direct buried fiber optic cables and testing. Hands-on with broadband technicians installation testing maintenance of passive fiber optic, re-structured cables, Cat3,5,6,7,8, low voltage,& data AV, CATV, security, intercom, internet and speaker system cables.

● Supervise the cabling and installation of ethernet, FTTH, and FTTX, GPON. Knowledge with CAD application and OTDR testing equipment. Demonstrate effective working ability with foreman and crew leaders to establish good relationship among all subordinates in the fiber optic, coax and copper cables, Outside and Internal Plant on buildings cabling, installation and termination.

● Supervise the yearly budget preparation for projects, menhours and materials requirement via the Manager engineering and attend the yearly meeting for budget proposals discussion, and explanation for budgets approval.

● Supervise the training program recommendation of staff who will attend the on the job training or on the company’s Training Institute. Supervise, prepare and submit the yearly appraisal for all staff technicians, cable crews, planners, civil works engineer and inspector and office workers.

PLANNING ENGINEER / PROJECT ENGINEER / MANAGER / PROJECT ENGINEER

SAUDI TELCOM, AL SHATI STAR EST., & ITALCABLE CONSULT, CABLE & WIRELESS PLC.,

ARAMCO, USMTM AND FISK QATHANI (CONTRACTORS)

DAHRAN (EASTERN PROVINCE), SAUDI ARABIA

(JULY 1978 - SEPTEMBER 1989)

● Prepare and Coordinate all centralized service orders for SAUDI/ARAMCO Oilfield Center the whole Kingdom of Saudi Arabia Telecommunication in Dahran, Work orders different categories,

Cable Splicing, plumbing and mandril test, Aerial cable installation and lashing including ‘E’ side

cable pressurization and repair and all works and responsibilities as mentioned above.

● Supervise and assign the contractor’s foremen for their different work assignments in which

Projects are to be done as per the scheduled work completion. What machines are required to utilize to follow the proper procedure and standards for the safety of all utilities on the project area in order to complete the project as per the planned completion dates.and budget. Coordinate with the civil works Engineer to support the contractors direct buried fiber optic, coax cable plowing and cable lashing for aerial installation. Guide the contractors wiremen and technician for internal cabling on buildings through the cable tray & ducting on low voltage cabling, Cat 3,5,6,7 for Data, AV CATV and speaker systems upto the termination to the internet router and modem,phone outlets, including wiring of 220v 14/2 and 12/3 on villas and officers quarters Saudi Arabian National Guard projects.

● Supervise and assign personnels, foremen for their different work assignments and the works to be done as per schedule of work for completion and budget, what machines are required and as per the proper procedures, standards, and the crew of civil works inspector, for the safety of all utilities and to confirm that the daily inspection works are kept in documentations to be reflected on the asbuilts drawing of underground ducts in aerial, fiber optic coax and copper cable routes for final plan and for future reference.

● Supervise the coordination with the broadband field technicians, personnel in order to provide support in case of outage and restoration of any particular network location for smooth traffic transmission and coordinate the works progress with the sales staff, marketing and engineering. Review the project before kick-off to avoid damage to other utilities. Have a smooth project construction and completion as per the scheduled time frame of any project or work. Prepare memo addressed to the finance division via the engineering Manager for project completion payment and close out. Supervise the fiber optic and cabling installation, splicing on both underground ducting and direct buried fiber optic cables and testing. Hands on work with broadband technicians installation testing maintenance of passive fiber optic and coax,and re-structured cables, color coding.and termination.

SUPERVISING TECHNICIAN / CENTRAL OFFICE IN-CHARGE

BUREAU OF TELECOM REPARATION PROJECT

GOVERNMENT TELECOMMUNICATION SYSTEM

QUEZON CITY, PHILIPPINES

(FEBRUARY 1966 - JUNE 1978)

● Join the Course: OSP OPE, DESIGN- at the BUREAU OF TELECOM TRAINING INSTITUTE under the JAPANESE INSTRUCTORS EXPERTS on TELECOM from the PHILIPPINES - JAPAN, REPARATIONS PROJECTS as follows:

1.Outside Plant Engineering & Design, Construction, Project

Management & Elementary Cabling & Splicing.

2. Fault Localization and Removal

3. Subscriber Installation and Repair.

● Management, Supervision and Construction of Three (3) Telephone Central Office Equipment

(Strowger Step by Step) with total load of 9000, single telephone lines including each Main Power Supply Batteries DC 48 volts, 1500 Amp. Hours, charging,discharging and testing of specific gravity of batteries acid. The construction of Automatic CHANGE-OVER EQUIPMENT Main Power Supply AC/DC and Power Generator Equipment.

● Management, OPE Design, Construction and Supervision of OSP civil works, both Underground and Aerial including the Cabling Networks.Cable pulling installation from main distribution frame (MDF) and splicing underground and aerial cabling, lashing, upto pole box termination. Subscriber installation upto termination box protector, fault locator or cable and line repair, manhole cleaning and drain water and debris, gas test for any leak as for workers safety including safety early warning device.

● Supervise the coordination with the broadband field technicians, personnel in order to provide support in case of outage and restoration of any particular network location for smooth traffic transmission and coordinate the works progress with the sales staff, marketing and engineering. Review the project before kick-off to avoid damage to other utilities. Have a smooth project construction and completion as per the scheduled time frame of any project or work. Prepare memo addressed to the finance division via the engineering manager for project completion payment.

● Organize meetings with other groups, internal or outside the company to be aware and device early solution on problems that may affect the company’s operations or project delays. Meetings with the municipalities and contractors and owner concerning any new developments, wayleaves and other company utilities involved in the projected route of ducting and aerial projects, including inside plant cabling on buildings in cable trays and conduits. Using low voltage cables Cat 3, Intercom and keysystems, speaker systems.

EDUCATION AND CERTIFIED TRAINING

HIGH SCHOOL - PHILIPPINES

MANILA TECHNICAL INSTITUTE- PHILIPPINES-

1. Radio &Television Technician and AC/DC Power Supply Module.

BUREAU OF TELECOMMUNICATION TRAINI9NG INSTITUTE

BU. OF TELECOM GOVERNMENT TELEPHONE SYSTEM, VALENZUELA BULACAN, PHILIPPINES

1. Elementary Cable Splicing and OPE & Design, Construction (February 1966 - April 1966)

2. Fault Localization and Removal (April 1966)

3. Subscriber Installation and Repair (June 1966)

4. Penta 500 and Strowger Step by Step “Central Office Switching” (July 1970)

5. Television Tech. & AC/DC Power supply module.

ETISALAT- TELECOMMUNICATION CORPORATION

ABU DHABI, UNITED ARAB EMIRATES (UAE)

1. Fundamentals of Effective Management (March 11-16, 2016)

2. Safety And Security (April 28-29, 1997)

3. Quality Awareness (April 22, 2001)

Rodrigo C. Nofrada



Contact this candidate