Muhammad Ramzan
Mechanical Supervisor
Mobile No: 009***********, 009***********
E- MAIL. adnzgj@r.postjobfree.com
Skype ID; mramzan6121
OBJECTIVES
A goal-driven, service oriented professional with 9 years of relevant Professional experience in erection, commissioning & startup of Oil Gas and renewable power energy Projects. Looking for an opportunity as Mechanical Supervisor in growth oriented Organization, which offers diverse responsibility,
QUALIFICATIONS
B.S Technology in Mechanical ( Bachelor Sciencein Technology )
Bachelor Science in Technology 3nd Year (Continue)
Newports Institute of Communication&Economics
D.A.E Mechanical (DIPLOMA OF ASSOCIATE ENGINEER)
Diploma of Associate Engineer Mechanical (60.27%) (2007-2010)
Swedish Multan PBTE Lahore
S.S.C (2007)
Secondary School Certificate (58.17%)
BISE MULTAN
COMPUTER SKILLS
Diploma in Computer Applications (2009-2010)
MS Office, Internet, Report Writing skills, Presentation skills.
SUMMARY OF SKILLS
Mechanical Supervisor with immense expertise preferably into Power plant, Oil and Gas & wind power Sector. Summary of my expertise mentioned below,Location Preference: Gulf countries.
Professional Experience Summary 9 Years
BRUNEL OIL&GAS SERVICES W.L.L 3 Month Shutdwon
Working as a Mechanical Technician extruder Gearbox and Maintenance Centrifugal pump Mechanical Seals,Bearing,Check for Clearances Well versed with Procedure&method of aligenment of pumps by using laser alignmenttool&Reverse Indicator Method at Shutdown of Qatar Petrochemical plant QAPCO
Gasco Engineering Pvt Ltd 02 Years
Working as a Mechanical Supervisor Fabrication and Installation of Wind Breaker Fence and Installation of Centrifugal Single Pump and complet Fabrication and Installation of Coal fire Fighting System
2 Project Exp
Working as a mechanical Supervisor at Solar power Project fabrication and Installation of Structure Solar plate Erection of fire fight system control room10MW ENI Pakistan Oil&Gas Bhit Gas filed Dadu Sindh
FeeCom Engineering Company 01 Year
Working as a mechanical Supervisor,Fabrication of HSD Oil Stroge Tank with compelte fire figting systems and all pipe line Erection(EPRF) II Enar Petroleum Refining Facility project Mango Pir Karachi
Gasco Engineering Pvt Ltd 07 Month
Working as a Mechanical Supervisor at Engro Coal Power Project Thar Sindh
Albario Engineering Pvt Ltd 01 Years
Working as a Mechanical Supervisor at parco project Shikar Pur Sindh Installation and Fabrication HSD oil Storage Tank and Installation of Forwding Pumps Station and his piping complet
SHR Construction Engineering Pvt Ltd 01 years
Mechanical Supervisor
DG Cement plant Hub choki Balochstan working as a site Supervisor Installation Steel Structure Jaw crusher, Con Crusher, coal Shed areas, fabrication and modification work Installation and Erection all heavy equipment
2 Project Exp
Mechanical Supervisor
Work in coal fired power plant1223MW Karachi, installation pump station port Qasim and Erection his piping forwarding and unloading areas,erection of steal structure Steam Turbine Plant Modification work, Installation coal yard Structure,
Hubie China Company 01Years
Mechanical Supervisor
Working as a Supervisor machanical haveli bahdur shah project jhang 1230MW
Installation of GT structure,filter house structure,pipe rack structure and Steam turbine structure
Handling the all material of client and Ensure Quality of worke,Manage all labour on site
Good Communication with Erection team and QA l QC team
Albario Engineering Pvt Ltd 01 Years
Mechanical Supervisor
Haveli Bahadur Shah 1230MW Jhang Installation and Fabrication of HSD oil Tank and Installation of CWP piping of loading and unloading area Installation of CW Pump Stationan and his piping and Blasting and painting of HSD Tank and CW pipe line
2 Project Exp
Site Supervisor 747MW Combined CycleGuddu Berage Sindh Working as a site Supervisor HSD Oil Storage Tank 747MW Thermal Power Plant Pakistan
QA/Qc Sand Blasting and Painting HSD Oil Tank 747MW Inspector
Albario Engineering OASIS Pvt Ltd 01 Years
Mechanical supervisor
Megadeal Power Plant 1250MW Basra
Shat al (SCPP)
BASRA IRAQ
Responsibilities:
Installation of Gas Turbine 9E Frame (GE)
Installation of GT Acoustic Enclosure with Air Filter Structure
Alignment of GT and CW Pump
Installation of Stack Structure
Installation of GT Cooling System Fan
Work on punch list Attend in Commissioning.
Installation of Oil Skid with Mist Element including Gas Module and Filtering Skid
Installation of Gas Monitoring Instruments
Descon Constriction Service Pvt. Ltd 01 years
Mechanical supervisor
Installation and alignment of Wind Turbine 49.5&50 MW FFCEL Wind Energy Power Project
Jhampir Sindh
Royal Textile power plant pvt.ltd O&M 06Years
Mechanical Assistant Supervisor O&M
check and Maintenance Cooling Tower fans moter and water forwding pumps
Troubleshoot,Inspects,Maintains,Repairs,Overhauls and Rectify the Faults of Rotary and Stationary Equipment as per Maintenance Plan
Maintain/Update all Maintenance Records,Drawings Daily Work log in
10MW Plant Gadon
Orient Power Energy System 06Month
Shift operator
Maintenance of Jacking oil or bearing lifting oil pumps and adjusts the required pressure
Repairing and Maintenance of VTR (Variable Pressure Regulator) of hydraulic Pumps
Power house Hub choki, Karachi
Descon Constriction Pvt Ltd. 8month
Mechanical Tech
Gas filed Mol oil& gas Plant Installation of pump loading or unloading pump area and alignment
Repairing and Maintenance of Mechanical Shaft driven screw pump having capacity Replacement of Glands sleeves and shaft glandsI nstallation of cooling fans and alignment
Kohat Makori KPK
CORE COMPETENCIES
Examined the pump bearings, Cleaned lube oil console and inspected gears (Gear Box) for any wear and cracks, cleaning and flushing activities on Lube oil coolers, Jacket cooling lines and all sight glasses and replacement of gear box lube oil Shell T-32 etc.
Torque coupling bolts (Main pump to Gear Box- Gear Box to Motor and Motor to Booster Pump).
Replacement of balance mechanical seals and clearance checking of general bearing.
Alignment of complete train (BFP main pump to step up gear, step up gear to motor and motor to Booster pump). Major overhauling activities on Bearing Cooling Water Pumps (BCWP):
Following activities were performed on bearing cooling water pumps during its complete major overhauling:
All clearances were checked as per OEM recommendation.
Replacement of Glands sleeves and shaft glands.
Replacement of both side bearings and DE bearing sleeve
Repairing and Maintenance of Mechanical Shaft driven screw pump having capacity
Repairing and Maintenance of VTR (Variable Pressure Regulator) of hydraulic Pumps
Maintenance and repairing of fuel oil check valves and adjust the required pressure.
Maintenance of Jacking oil or bearing lifting oil pumps and adjusts the required pressure.
Repairing and complete overhauling of GEA WESTFALIA Separators having capacity of treated HSFO oil 23000 lit/hr and done the job very well.
CM job at oil and water separation plant/HSFO dewatering plant.
Repairing of self suction pump Manufactured by (Kaiquan pumps china)
Engineering and QHSE Standards: Hands on. Control and management Cummunication
Make a Co-ordination with Mechanical staff in order to complete the work within the Specified time frame.
Co-ordination with manager and QC department to resolve the issues in Mechanical section
Ensure the effective and efficient Mechanical and construction works...s.
Proven competence in the installation, commissioning & startup of PlantsEquipment.
TRAININGS
First Aid.
Fire Fighting.
Work Permits system.
PSM (Personnel Safety Management)
SKYLOTEC TRAINING (Access & rescue training from a Wind Turbine Generator)