Post Job Free

Resume

Sign in

Planning Engineer Exxon Mobil

Location:
Silver Spring, MD
Posted:
July 24, 2021

Contact this candidate

Resume:

Summary

Over ** years of work experience in Oil & Gas, Infrastructure, Road Works, Water Supply and Minerals Sectors. I have worked on all the phases of projects from FEED through EPC, Commissioning and Start-Up. I have carried out maintenance planning, coordination of shutdowns from identification of the work scope, required skills, material requisitions, Cost Time Resource (CTR).

The projects have been for major clients such as Anadarko, Chevron, Exxon Mobil, BP, Petroceltic, Esso etc. both domestically and internationally. I have developed and coordinated schedules from inception though executions with the various stake holders determine the most suitable and economically viable engineering and construction method.

I am conversant with the use of Primavera P6, MS Office and also have good knowledge of project controls procedures acquired over the years of Planning and Scheduling Experience on Mega EPC projects and working for Leading Companies in the Petrochemical Industry.

Education

Masters of Science (MSc.) Degree in Civil Engineering

Languages

Fluent: English, French & Russian:

Elementary: Spanish and German

Experience starting with the most recent jobs.

2016 Dec – Feb 2018 General Supervisor Admiralty Serviced Apartments.

Bamenda - Cameroon

Supervision and Overseeing the lunching of a new serviced apartment complex. Planning and Scheduling for the construction of a new Restaurant and conference centre block. Mentoring some young graduates and training them on planning and scheduling software as primavera P6, project controls and progress measurement, scheduling of remaining work, interdependency of the various crafts. Cost Controls, analysis and project reporting to the owners

2014 July – Oct 2016 Project Planning & Scheduling Engineer – Petroceltic International PLC

Groupement Isarene – Ain Tsila Development Block 228 & 229

Project Planning and Scheduling Engineer, Reporting to the Project Controls Manager and PMT. Developed and maintained the project schedule through all the phases. Elaborated the schedule for the contracting process of over 50 different contracts from ITT preparations through contract award and execution and or delivery lead times.

Well Engineering Development of a detailed Drilling Schedule of 24 wells from the site survey and well location implantation reports, Rig moves, spud date, time depths curves.

Subsurface – Planning and Scheduling geological, geophysics, petrophysics and seismic activities in collaboration with third party consultants.

Surface Facilities – planning and Scheduling of activities from FEED, EPC (that includes, the field gathering system, the well site construction, pipelines, CPF and Commissioning.)

I was responsible for the organisation and chairing of project Schedule review meeting. Schedule updates and reporting.

2012 Aug – Jan 2014 Site Planning & Scheduling Engineer – ANADARKO PETROLEUM CORP. LTD

Groupement Berkine - El Merk Block 208, Oil Field Development

Responsibilities have been that of the Off-sites PMT Planning Engineer in charge of all Project Support Services during the Construction, Pre-commissioning, Commissioning and hand over of the project scope of El Merk Block 208 which consists of; 82 wells, 10 Field Gathering Stations (FGS), 6 Gas Distribution manifolds (GDM) and a Central Processing Facility (CPF). Responsible for developing, consolidating and maintaining of the individual contactor reports into project overall progress. Verification and approval of contractor progress certificates using job cards.

Chair Project Completions Meetings. Initiate the development of Project Completion Schedule and a production ramp up profile based on wells availability, start-up sequence and production capacities in order to support successful commissioning of the CPF Oil Train 01&02.

Conducted Schedule and Progress Review meetings with contractors and provided Contractors guidance. Prepared Weekly Progress Reports, S-Curves forecast end dates, schedules Reviews and Resource Analysis. Identified in time potential pitfalls such as Material delays, inadequate manning and provided work around alternative to Project Management Team (PMT)

Key Performance Indicator KPI. Monitoring and tracking of Mechanical Completion Data Base and Dossiers, Walk downs, and monitoring the evolvement of Punch list and Outstanding Work list, Pre-commissioning and Commissioning Inspection Test Records (ITR-A/B/C respectively). Partial provisional Acceptance (PPA) and hand over Certifications.

2010 Mar – July 2012

Lead Planning & Scheduling Engineer – KBR Limited – Leatherhead UK

Escravos Gas to Liquid Plant – Delta State Nigeria

Coordination and Supervision of Field Planning Engineers. Preparation and consolidation of Weekly Work plans in collaboration with Prime Contractors and Local Community Contractors. Development and Elaboration of Weekly Management summary reports

Conducting and Chairing of daily and weekly progress and schedules review meetings with supervising Disciplines’ Superintendents, Subcontractors and Project Managers..

Pioneered the implementation of Last Planner. Used last Planner for the coordination of daily Test Package Progress Review meetings coordination of Reinstatements, Pre-commissioning and Systems’ Mechanical Completions and RFSU – Ready For Start Ups

2008 June – Oct 2009

Principal Planning Engineer – Worley Parsons Europe Ltd - UK

Kashagan FFD Phase II FEED – Consortium of Worley Parsons, Aker & The Republic of Kazakhstan

Produced a Detailed Level IV resource loaded Engineering schedule for the project FEED Design. Held Bi-weekly progress review meetings with discipline Leads and Client. Schedule progress updates and report.

Iran LNG – Liquefaction Units

Produced a Detailed Level III resource loaded Engineering and Procurement schedule for the project Detailed Design. Progress Curves, weekly and Monthly progress review meetings and progress reports to management and client

FERREXPO Iron Ore Expansion Project

Produced a Detailed LVL III resource loaded EPC schedule for the DFS report. Progress S-Curves

2006 June – June 2008

Principal Planning and Scheduling Engineer – MW Kellogg Ltd UK

MURCO – Milford Haven Refinery (Client – MURCO)

Developed a detailed (EPCC) engineering, procurement, construction & commissioning resourced loaded schedule, Progress Curves and Manpower histograms for Bid. The Bid document was completed and successfully submitted on time

Statoil

I worked on the development of a detailed resourced loaded schedule for the Engineering, Procurement, & Construction Assistance (EPCa) of KEP2010. Responsible for developing progress Curves (S-Curves), Manpower Histograms & Reporting Template.

Nigeria LNG 7 Plus (Client is represented by Shell Gas Nigeria BV)

Worked on the development of a detailed (EPCC) engineering, procurement, construction & commissioning resourced loaded schedule for the (FEED) Front End Engineering Design submission. I developed Progress Curves and Manpower histograms for Bid. The Bid document was completed and successfully submitted on time.

2003 Nov - May 2006

Lead Planning & Scheduling Engineer: Brown & Root –Condor Algeria (KBR JOINT VENTURE)

November 2003 – May 2006 Position – Lead Planning & Scheduling Engineer – (Clients; SONATRACH, AGIP, BP, STATOIL Consortium)

BR&C Main Office Draria Benacknoun

Mainly responsible for the coordination and supervision of planners and conducting of project schedule review meetings, the development of new schedules through Engineering, Procurement and Construction phases. Development & elaboration of detailed resource loaded schedules, progress curves and manpower loading histograms for Brown Fields Modifications for the existing

In Salah Gas Plant Shutdown with British Petroleum (BP).

Carried out the entire planning, coordination and successful shutdown process, from the identification of the right people, material and location of the various jobs, tools and equipment required, time of intervention, duration and associated cost (Cost Time Resource (CTR)).

2001 Oct –July.2003

Senior Planning and Scheduling Engineer – Chad Cameroon (KBR JOINT VENTURE)

CHAD CAMEROON PIPELINE PROJECT 1200KM (CLIENT EXXON MOBIL)

Coordinated the construction of a $4 billion Pipeline project to completion ahead of initial plan. Responsibilities included but not limited to work sequencing and planning of activities, scheduling, progressing of front end & baseline schedule. Development of critical path schedule Conduct schedule review meetings with supervising Disciplines’ Superintendents and Subcontractors on the Project. Provided expert judgment & workaround plan to execution team and the client on methods of keeping project on schedule.

Elaborated detailed weekly and Monthly reports on schedules and progress percentages to the Project Manager, Craft Superintendent, and Forman’s weekly.

1999 Aug – Oct 2001

Scheduler & Civil Engineer – HELVETAS CAMERRON

Infrastructure Projects

Responsible for Projects Studies, Planning & Scheduling for Projects that were executed by the company within the entire national territory of Cameroon. Activities included amongst others identification and writing of (PDN) project deviation notices, change order and implementing estimates, verify labour & material cost compliance with project exigencies & input progress performance.

Main responsibilities included the development of a detailed resource loaded schedule of the studies, construction and supervision of 19 Community Village Water Supply Infrastructure Projects - Sponsored by HELVETAS CAMERRON

1996 - 1999

Civil Engineer & Technical Manager – CEMBUC, Cameroon

CEMBUC, Cameroon Oct. 1996 to July 1999

Preparation of technical and tender documents for submissions and project schedule build ups, updating progress and planning and sequencing project activities. Projects Supervision.

1995 - 1996

Branch Manager – SOMICA sarl

SOMICA sarl. Oct 1995 to April 1996

Responsible for the day-to-day coordination of company. Activities in the Centre and South Provinces. Project studies, designs, Scheduling & Planning, Preparation of bids.

1993 – 1995

Civil Engineer, SAMSUN sarl

SAMSUN sarl. Feb 1993 to April 1995

Responsible for the management of company budget, estimating for new projects. Cost analysis and represented the company in seminars both in Cameroon and abroad

Summary Table Of Projects I Have Worked On Starting With The Most Recent.

Period

Client

Project

Location

Plant Type

Work Scope

Project Cost X 1,000,000

USD

Project Role

20116 -2018

Admiralty Serviced Apartment plc

Cameroon

infrastructure

Supervision and Overseeing the lunching of a new serviced apartment complex

2

Project General Supervisor

2014 - 2016

Ain Tsila Development

Algeria

Oil & Gas Development

Project Planning & Scheduling Engineer responsible for the development of project schedule. Project Contracting plan, Drilling plan and Progress measurement

2,600

Project Planning & scheduling Engineer

2012-2014

EL Merk Project GROUPEMENT BERKINE

Algeria

Oil & Gas Field Development

Contractors Schedule analysis, Development of Project Completion Schedule. Progress Measurement Wells Mechanical Completion, Ready For Start Ups and to Client Acceptance

4,000

Site Planning Engineer for the Operator

2010-2012

EGTL Project Escravos Delta State Nigeria

Nigeria

GTL

Development, Coordination and Supervision of the implementation of Last Planner for the Construction of EGTL Plant

6,800

Last Planner Coordinator

2009

Kashagan FFD Phase II FEED

Kazakhstan

LNG

Detailed Resourced Loaded Level IV FEED Schedule

Principal Planning Engineer

2008 - 09

Iran LNG

IRAN

LNG

Detailed Resourced Loaded Level III E&P Schedule

889

Principal Planning Engineer

2008

FERREXPO

Ukraine

Iron Ore mining

Detailed EPC Schedule for DFS

3,400

Principal Planning Engineer

2008

MURCO

MILFORD HAVEN, UK

Refinery

Detailed EPC Schedule (Upgrade & Increased Capacity.)

Principal Planning Engineer

2007-08

Statoil

Stavanger, Norway

LNG

Detailed EPC Schedule

500

Principal Planning Engineer

2007

Shell Gas Nigeria BV and Statoil

Nigeria

LNG

Detailed EPC Schedule for FEED Submission

Principal Planning Engineer

2006

NNPC, Chevron, Shell B.V and BP

Olokola - Nigeria

LNG Plant

Detailed EPC Schedule for FEED Submission

Principal Planning Engineer

2005

BP & SONATRACH

In Salah & Krechba Algeria

LNG

Expansion of an Existing Project

12

Lead Planning Engineer

2003-05

AGIP, OG1, GAP

ALGERIA

LNG

Revamp LNG project

46

Lead Planning & Scheduling Engineer

2001-03

Chad Cameroon Pipelines inc

Chad & Cameroon

Petrochemical

1200km Pipeline with 4 Metering and Pump Stations

4,000

Senior Planning Engineer

1999-2001

Helvetas Cameroon; EU (STABEX)

Cameroon

Infrastructure Road Projects

19 micro infrastructure development Water Supply Projects & 68 km road network

1.8

Planner & Civil Engineer

1996 – 99

Douala Ports Authority

Cameroon

Infrastructure

Infrastructure – Marine and offshore

Technical Manager & Civil Engineer

1995 – 96

Ministry of Public Works

Cameroon

Infrastructure

Infrastructure

Branch Manager

1993 – 95

Ministry of Public Works

Cameroon

Road Works

Infrastructure

Civil Engineer



Contact this candidate