RESUME
NAME : STANY HILORYON MACWAN
ADDRESS : *, **. ****’s Colony,
Nr, Telecom Center
Bharuch 392001– (Gujarat)
Date of Birth : 1st Dec- 1981
Gender : Male
Contact No : +91-787*******
Email : adnv5e@r.postjobfree.com
Marital Status : Married
Languages Known : Gujarati, Hindi & English
ACADEMIC QUALIFICATIONS
Sr.No
Name of Exam
Passing Year
Board / University
Per %
1.
S.S.C
MARCH-1997
G.S.E.B. GUJARAT
64 %
2.
H.S.C
MARCH-2000
G.S.E.B. GUJARAT
42 %
3.
I.T.I FITTER
JULY-2002
N.C.V.T GUJARAT
69 %
4
2NDCLASS BOILER ATTENDANT
JULY-2005
N.C.V.T GUJARAT
77 %
5.
1STCLASS BOILER OPERATOR
JULY-2008
N.C.V.T GUJARAT
N/A
Seeking junior level position in Utility, Steam & Power Generation Plant’s Operation & Maintenance with leading organization preferably in Gujarat Region.
Professional Profile : Boiler Operator, Offering over 10 years of strong, decisive participation in Utility Plants and Boiler Operations and Maintenance.
PRESENT ORGANIZATION
Presently working with Quaker Chemical India Private Limited, located at Dahej as Boiler and Utility Operator from 01-09-2018 to till Date.
PREVIOUS ORGANIZATIONS
Lanxess India Limited, Jhagadia as a Boiler Operator. Handling 8TPH Multi Fuel Fired Forbes Vyncke PLC, SCADA operated boiler from 03-12-2015 to 30-09-2018 on contract base. Contractors: Shree Sai Udyog, Aquatech Services Limited.
Sun Pharma Industries Limited, Panoli as Boiler Operator, Soft Water Plant Operator in Boiler Plant and Utility Department on contract based job From 29-08-2014 to 30-09-2015 . Reporting to Executive Engineer.
Contractor : Deccan Techno Solution Private Limited, Vadodara (Gujarat).
Kanoria Chemicals & Industries Limited, Ankleshwar as Boiler Operator, DM plant & Soft Water plant Operator in Utility Department From 17-10-2012 to 17-08-2014.
Birla Century Jhagadia as Boiler and DM water Plant Operator in Utility and Boiler Plant.From 12-11-08 to 30-09-2012.
Contractor: Industrial Power and Maintenance Corporation, Reporting to Manager (IPMC)
Completed Apprenticeship as boiler attendant in G.N.F.C. Bharuch, from 14-11-02 to
13-04-05.
Handled Operation and Maintenance of following:
2X2 Tons/hour HSD fired Shell Max Packaged Boilers, Cooling Tower, 2 NOS Air Compressors, DM Water Treatment and 2 NOS Softner Plants.
8 Tons/hour Multi Fuel Fired PLC SCADA based Boiler.
12 Tons/hour BAGGASS Fired Boiler.
16 Tons/hour Gas fired packaged Boiler.
15Tons/hour Gas cum LDO fired packaged Boiler
3X15 Tons/hour PLC Scada based WHRSG Boilers
4.0 Tons/hour Shell Max Gas cum LDO fired Boiler.
Thermopacks (Ecoflam Make) Soft Water & DM water Treatment Plant
Date:
Place : Bharuch
(Stany Macwan)