CAREER SUMMARY

Thirty-five plus years of experience

Industries: Power, Utilities, Oil and Gas, Offshore, Onshore

Type of Facilities: Production Facilities, Petrochemicals, Power Plants, Substations, Refineries, Offshore, LNG.

Areas of Expertise: Electrical and Instrument Design, Refinery, Petrochemical, Construction and Maintenance of HV, MV, and LV Overhead and Underground Power Lines and Substations.

EXPERIENCE

Senior I/C&E designer, Jun.2020 – Apr. 2021

McDermott

BB3- Bayport, Tx.

SPI-2016, wiring & Loops, Autocad 2016 Create Block Diagrams for Fiber, Electrical, Air, Support, Analyzer and Telecom Details. Check all, Location Plans and cable schedules from Gerguan & Brno. Assigning AS cabinet locations in Navisworks.

Senior I/C&E designer, Jun.2017 – Jun.2020

McDermott

CLNG – Hackberry, La..

Mobilized to CLNG site, for Engineering and construction support. Responsibilities include oversee of cable and channel tray installation, respond and answer RFI’s issued from electrical and Instrument contractors, Check and redline supplier documents for SUC completion. Design and modify location plans for fire proofing, Create MTO’s for supporting construction fire proofing efforts. Create and modify wiring and loop drawings from SPI.

Senior I/C&E designer, Jan.2017 – Jun.2017

McDermott

FLNG – Quintana Island, Tx.

Conduit MTO of PTF area. Conduit Routing in the PTF area (AutoCAD 2012). Review Vendor packages in the PTF Ground Flare area for shipped loose items, and creating location plans. Check conduit routing on location plans. Using vendor doc. Create location plans for vendor GTG area-(Gas Turbine Gen.) SPI wiring. Check and Red line Honeywell SUDS package against SPI wiring. Projects included:

Senior I/C&E designer, Aug.2016 – Jan2017.

McDermott

CLNG – Hackberry, La..

Checking of: SPI wiring diagrams, Loop diagrams and cable schedule against vendor documents. Junction Box location plans, Block Diagram Drawings, MCT cable transit Drawings, 480V electrical Motor Schematics, and conduit routing on location plans.

Senior Elec. designer, .Dec.2015 – Jun.2016

Wood Group Mustang-SPG

Williams Dalton Pipeline Expansion – Coweta County, Ga.

Expansion of 16 new valve sites and Launcher/Receiver site. Created Plan drawings in AutoCAD 2014, Power, Grounding, Lighting, Cable Tray, Panel Schedules, Block Diagrams, and Installation Details. Created, MTO’s and Cable Schedules, Cable and Transformer sizing and Routing. Attended Client meetings. Projects included:

Senior Elec. designer, .Jul.2015 – Dec.2015

Wood Group Mustang-SPG

Dow Chemical Co. – Houston, Tx.

LHC-9/SDO. AutoCAD 2014, update DWG.documents with client & checker comments. (Red Lines). AutoCAD 2014, Create new Power plans, Grounding plans, lighting plans and Cable Tray plans Drawings for existing sites. CADWorks modeling, Installation of Electrical MCC building, Cable Trays, Floodlighting Poles & Power line utilities. Creating Cable Schedules and MTO’s. Projects included:

Senior Elec. designer, .Dec.2014 – Jul.2015

Wood Group Mustang-SPG

HESS, Garden Banks 260A, Baldpate Offshore Platform, (GOM).

Addition of new living quarters on offshore platform. Installation of six new 480 volt breakers in MCC room. Created new drawings and revised existing drawings, block drawings, installation details of new transformer/switch rack, drawings, and PA/GA/FG drawings. Cable tray, cable size and routing. MTO on materials and cable schedules. Field walk-down. Reference drawings and documents from Citadon. Projects included:

Inst/Elec. designer, .Apr.2014 – Dec.2014

Wood Group Mustang-SPG

Exxon, Marine Well Containment Services (MWCS). – Ingleside, Tx.

Field support for the Exxon MWCC project, working with MMR contractors on electrical and instrument issues. Review existing drawings and cable schedules from Weatherford and AMEC. Create as-built drawings of breaker panels. Issue SQs for purchasing of materials. Projects included:

Senior Elec. designer, .Mar.2013 – Apr.2014

Wood Group Mustang-SPG

Citgo Refinery. – Lake Charles, La.

FEED project. Preparing MTOs for multiple sites, installation of MCCs, switch racks, conduits, underground duct banks and cable trays. Create drawings with AutoCAD 2011. Projects included:

Senior Elec. designer, .Oct.2012 – Mar.2013

Wood Group Mustang-SPG

Shell HOHO, – Channelview, Tx.

CADWorx: 3D model, installation of lighting poles, fixtures, cable trays, and tray supports, power cable burial and transformers. AutoCAD 2011: created grounding plans, lighting plans, power plans, control plans and area class plan, power cable locations and conduit routing. Demolition of existing utilities, adding panels to new electrical room. Created cable schedule using Excel. Drawing index and weekly team meeting. Projects included.

Senior Elec. designer, .Aug.2012 – Oct.2012

Wood Group Mustang-SPG

SXL Mariner West Sunoco Logistics Partners L.P., – US, Tx.

Installation of 1,500 HP pump, oil skid and new control/electric rooms at multiple sites. Created drawings using AutoCAD 2011 for building plans, cable tray and conduit routing, area class, installation details, grounding and lighting plans, demolition and one lines. Projects included:

Inst/Elec. designer, .Mar.2012 – Aug.2012

Wood Group Mustang-SPG

OXY W Seminole CO2, OXY Sharon Rdg Exp, OXY Willard Membrane, – US, Tx.

SPI database: Input loops, install details for construction package. CADWorx: 3D model, build and locate instruments, junction boxes, control panels and stands. AutoCAD 2011: Create block diagrams, fiber termination drawings, junction box/control panel, layouts, rack details. Conduit Routing and Location Plans. Check construction packages for Bravo pump station, Gold Smith, south injection manifold, and north injection manifold. Weekly team meetings. Projects included:

Emerson Process, - Jan.2011-Mar.2012

Elect. / Inst Designer

Shell Chemicals, L.P., Deer Park, Tx.

Alkylation Unit - DCS /SIS upgrade. Worked in the field with construction group to ensure contractors working within scope. In charge of specifying locations for junction boxes, transmitters, cables and conduit routing, Delta V cabinets and Charms panels, fiber and power panels. Conducted daily walk downs in the plant and checked all equipment locations. Created construction package for client. Included the demolition of existing Honeywell DCS/SIS system & the installation of Delta V/Charms system in the alkylation unit. Created and modified existing junction box DWG's with new homerun cables to Delta V Charms cabinets. Created mounting and installation details, cable schedules and cable block diagrams.

Projects included:

Fluor Eng.,

Designer II

Exxon Mobil Chayvo OPF Expansion, Jun.2010-Dec.2010

Sakhalin 1 EPC-1 Project. Creating junction box drawings, instrument install details, support and mounting details, telecom and fiber drawings and block diagrams utilizing AutoCAD 2004 and 3D design cable route for DSME module yard, junction box loading, PCS, PSD and marshaling panels, cable and gland sizing for cable schedule spread sheet, instrument index for fire and gas unit. Working extensively with Intergraph PDMS SPI Review Reality to perform model reviews and working with INtools to review loops and wiring reports. Utilizing the POL program for checking work packages of the module 29 and 30 water area and module 27 gas area. Reviewing vendor info for squad checks (Emerson, Nuovo Pignone). Projects included:

Fluor Eng.

Designer II

Browse LNG – FEED, Woodside, Australia – Dec.2009-Jun.2010

Utilized AutoCAD 2009 to create installation details, instrument and telecom equip. rooms, control room layout, telecom cable schedule. Projects included:

Fluor Eng.

Designer II

Whiting Refinery Modernization (OCC) Project, Whiting, Ind.- Feb.2009-Dec.2009

Upgrade & expansion of refinery to process extra heavy oil including module fabrication for crude and vacuum unit, gas oil hydro treater, and OSBL. Worked utilizing AutoCAD 2006 to create detail drawings, junction box location plans and cable block diagrams, create Instrument cable spread sheet in Excel using SPR to calculate distances from junction box to RIE building, create trend master wiring diagrams, DCS & SIS system designs loading of fire and gas junction boxes. SPI INtools, Module wiring Instruments to I/O cards, cable tray and conduit fill and routing for LON and power. Projects included:

Fluor Eng.

Designer II

OAO Tatneft and OJC Taneco, Nizhnekamsk, Tatarstan, Russia – Apr.2008-Feb.2009

Grassroots Refinery and Petrochemical Complex. Fluor provided project management services for a refinery/petrochemical complex as well as engineering, procurement, and construction management services for selected scopes of work focused on the utilities, offsite, infrastructure and Sulfur units for the complex, which is expected to have the capacity to refine up to 7 million metric tons of crude oil per year. Exporting AutoCAD drawings, to Chalmlite Street lighting software for calculations, on plant lighting locations, junction box locations and cabling. Using AutoCAD to cut area key plan and plan drawings from overall plot plan for area classification, worked with Engineering on the area classification in multiple areas of plant, using Smart Plant Review to determine locations of buildings, valves & specific pipe rack applications for the area classification. Assisting in (MTO) material take offs, estimation of cabling, junction boxes, cable glands and lighting in pipe rack areas. Projects included:

Fluor Eng.

Designer II

Garyville Expansion Marathon Petroleum Company, Garyville La.-Mar.2007-Apr.2008

The project includes a new crude/vac unit, hydrocracker, coker, NHT, CCR, KHT, sat gas, and sulfur block to enable refining of sour crude at a grassroots 190,000 BPD refinery. Responsible for instrument location plan drawings in OSBL process utilities, checking for proper instrument locations, junction box location, conduit fill and conduit routing to each junction box. Printing reports from INtools and updating the INtools instrument index. Using AutoCAD2004 to create wiring diagrams, instrument locations plans, fiber optic routing, Conduit routing, cabinet layouts, junction box locations, block diagrams and plant air drawings. Using Intergraph Smart Plant Review (PDS) to locate and verify instrument locations for proper tap installation with piping line list. Checking of INtools loops, wiring terminals and I/O maps from ICA, checking installation details In index for mounting instruments. Completed CEMS factory acceptance test (FAT) and checkout at vendor site. Projects included:

Bluebonnet Electric Coop, Brenham, Tx.

Electrical Superintendent – Oct.2004-Mar2007

Assigning and documenting work procedures to construction and maintenance crews, overseeing of 10 contractor crews, Overhead distribution, transmission, underground, substations, and right-of-way. Assisted Engineering Department on one lines, substation construction drawings and substation control room drawings using AutoCAD. Worked with SCADA and Control Center in the design of the control room, knowledge of the ILEX, UAI, AVL and PORCH outage management systems. Preparing annual budget, PO requisitions, approving departmental time sheets, approving contractor invoices. Assigning and documenting work procedures to construction & maintenance crews, meter techs, overseeing contractors, PO requisitions, purchasing of materials and maintaining inventory, assisting in annual budgeting, approving department time sheets, and dealing with customers on a day-to-day basis. Responsible for the installation and electrical design documents using AutoCAD 2000 for one lines of new construction and maintenance, overhead, URD, for relays, breakers, transformers, capacitor banks, and step-down transformers, cable trays, wiring, routing of fiber cable, cat 5 installations, terminations installation of Cooper, Switzer, Siemens relays and control panels in substations control room houses.

City of Brenham, Brenham, TX

Assistant Elect. Super Oct.2001 – Oct.2004

Duties include assigning and documenting work procedures to construction and maintenance crews, meter techs, overseeing contractors, PO Requisitions, purchasing of materials and maintaining inventory, Assisting in annual budgeting, approving department time sheets, and dealing with customers on a day-to-day basis Responsible for the installation and Electrical design documents using AutoCAD2000 for one lines of new construction and maintenance, overhead, URD, for relays, breakers, transformers, capacitor banks, and step-down transformers, cable trays, wiring, routing of Fiber cable, cat 5 installations, terminations installation of Cooper, Switzer, Siemens relays and control panels in substations control room houses.

San Bernard Electric Coop, Bellville, Tx.

Lead Lineman,-Sep.1981-Oct.2001

Twenty years in construction and maintenance of substations, transmission, distribution and secondary power, Sub-station work includes foundations and concrete installation, steel structure erection and aluminum overhead field bus, cabling, URD risers and terminations up to 1000kv, Cooper, Switzer and Siemens relays and control panels. Installation of transformers, breakers, cap banks, switches and regulators. Experienced in switching orders and clearances on high and low voltage. Performed outages in substations and on transmission lines. Performed routine inspections on transmission lines, right-of-ways, substations, and Construction and maintenance of underground primary and service. Installation of pad-mount transformers & junction boxes. Cross-trained with engineering department on one line field drawings, diagrams, and material list.

EDUCATION

Bellville HS (1976 – 1981) Certificate of completion.

PROFESSIONAL AFFILIATIONS

•None

TRAINING & CERTIFICATIONS

Project Management Cert.- University of Texas, Austin

(TWIC) Transportation Worker Identification Credential

(HUET) (OWS) Offshore Water Survival

OSHA 10-hour

Class A CDL

CADWorks

AutoCad

Navis Works

PDS

PDMS

SPI / SPI2016

Excel

Microsoft Office

Outlook-Email

References

Dean Cantrell: adnts9@r.postjobfree.com / Elect. Design Dept. Design Manager Arion

Skip Campbell: adnts9@r.postjobfree.com / Lead Instrument Designer, McDermott

Drew Stewart adnts9@r.postjobfree.com / I/C&E Dept. Manager, McDermott