Post Job Free

Resume

Sign in

Electrical Engineer

Location:
Al Dafna, Qatar
Posted:
July 12, 2021

Contact this candidate

Resume:

ELECTRICAL AND ELECTRONICS ENGINEER

Constant Updating of knowledge related to my assigned task. To utilize my technical skills for achieving the target and developing the best performance in the esteemed organization.

Mannan Mohamed Aslam. K.M.

Phone: +974-****-**** Email: adnosx@r.postjobfree.com WELL EXPERIENCED IN

FACILITY MANAGEMENT AND PROJECTS

INSTALLATION TESTING COMMISSIONING MAINTENANCE SERVICE

PROFILE SUMMARY

BE (Electrical & Electronics Engineering) +7 years of rich experience in the areas of INTERESTED AREA INTERESTED INDUSTRIES

ELV, Fire and Security System

LV, MV, HV, Transmission and Distribution

Switchgears and Production

Facility Management / Maintenance

Construction / Engineering / Consultant

Oil and Gas / Petroleum

PROTECT HANDLED

Hamad Medical Corporation - Qatar (22nos of Hospitals buildings) - As a Facility Engineer.

Head Quarters Building at Qatar Foundation (29,110 square meters and comprises 13 floors)- As an T&C Engineer

Strategic studies Centre at Qatar Foundation (6300 square meters and comprises 3 floors) - As a T&C Engineer.

Gulf Mall at Qatar (2storey shopping arcade encompasses 88,180 square meters near) - As a T&C Engineer.

Bone and Joint Center- HMC, Doha (Near 6500 square meters and comprises 2 floors) - As a T&C Engineer.

Venture Lighting, L&T Eden Park and SIPCOT industrial park at Chennai- As an Electrical supervisor. ROLE OF INSTALLTATION

Installation supervising for electrical equipment’s (fire alarm, access control, CCTV, lighting control).

Collect the ICO, BOQ, MS, scope and drawings

Explains scope of work to team, assist and assign the work.

Cable erection and Insulation resistance test of cable.

Follow up required materials with contractors.

Cable identification and cable feruling.

Panel dressing and device labeling.

Coordinate with civil and mechanical team and third party system contractors for interface cable termination. ROLE OF TESTING AND COMMISSIONING

Collect the documents, drawings and prepare permit for work.

Start the loop check and trouble shooting.

Complete the loop and start device testing.

Replace the faulty materials and making report.

Commissioning for fire alarm control panels as per cause and effect matrix. o Siemens Fire finder XLS control panel

o Gent Vigilon control panel

Commissioning for fire alarm graphics station,

o Simplex control panel

o Notifier control panel

o Cerberus DMS o NCC WAN o WINMAG

Commissioning and testing for monitoring signal from other fire detection and suppression systems o VESDA system

o Beam detectors

o Fire pumps (Jockey, Electrical and Diesel)

o FM200 & NOVEC system

o Sprinkler system (Tamper switch and Water flow switch) o Foam system

o Pre-action system

o CO2 detection

o CO system

o Kitchen Hood system

Sep’14 to Dec’16 : Testing & Commissioning Engineer in JBK CONTROLS W.L.L. (1400 Employees), Qatar Sep’13 to Aug’14 : Electrical Supervisor in Sudan Power Tech (200 Employees), Chennai - India Since Jan’17 : Facility Engineer (Hamad Medical Corporation) in JBK CONTROLS W.L.L. (1400 Employees), Qatar WORK EXPERIENCE

- Fire Fighting System (Sprinkler, Fire Extinguisher, Hose reel, landing valves, preaching inlet, Hydrants)

- Manpower Management - Planned Preventive Maintenance - Emergency Response/ Loss Prevention

- ELV Equipment’s

- Access Control System

- CCTV

- MV Change over panel - LV Equipment’s

- Fire alarm System - VESDA System

- Foam & Pre-action Deluge System - Clean Agent System PERSONAL DETAILS

ACADEMIC DETAILS

DECLARATION

Coordinate with third party system contractors for interfacing and testing, o Disable Refuge system

o Access control system

o Magnetic doors

o Automatic doors

o Fire Holding doors

o Pressurization Air fans

o Makeup Air fans

o Smoke Extract fans

o Elevators

o Escalators

o Lighting control system

o Bollard

o Barrier

o AV system

o Fire Curtains

o Fire Shutters

o DX unit

o Air Handling unit

o Fan coil unit

o Kitchen LPG gas

o MCC panel

Commissioning for fireman’s telephones, smoke (ventilation) control panel, Evacuation and live voice module.

Verify all fire alarm devices are working as per cause and effect matrix.

Test all fire alarm devices as per cause and effect matrix for inspection.

After completion of work and internal test, rise the inspection to the consultant.

Get the approval from Contractor, Main contractor consultant, Main contractor, Client consultant, Client

Rise the inspection to the Civil Defense for fire alarm system.

Preparing the daily project complete details and reporting to project manager as well as client.

Project handing over to client and get completion certificate.

Project taken over from existing project team and submit report to client.

Prepare the PPM Schedule & Checklist as per NFPA & QCD Standard. o Fire Alarm system - NFPA72

o Smoke management system - NFPA92

o Hose connection - NFPA1962

o Exit doors, Dampers - NFPA80

o Fire Extinguisher - NFPA10

Follow the Inspection, Testing and Maintenance as per PPM Schedule. o Water-Based Fire Protection system - NFPA25

o Clean agent - NFPA2001

o Emergency lighting system - NFPA101

o Security Systems (CCTV & ACS) – NFPA731

o Daily, Weekly, Monthly, Quarterly, Semi-annually, Annually (Fire alarm system equipment’s, Fire telephone, Water based fire protection system equipment’s, Clean agent system equipment’s, Deluge system - Foam & pre action, Fire Extinguishers, Hose connection, Smoke compartmentation, Fire compartmentation, Exit doors, Emergency lights, Fire doors, Motorized doors, Smoke curtain, Fire shutter, Smoke management system equipment’s, Motorized smoke dampers, ACS equipment’s, CCTV equipment’s)

During fire alarm test make ensure systems are working as per cause and effect matrix.

Trouble shooting and servicing to all fire safety assets.

Control room systems monitoring and call responding.

Emergency Response/ Loss Prevention to Fire alarm activation, Water leakage from the water-based fire protection system, Gas leakage from the clean agent system.

Maintaining documents & statistics data as per NFPA & QCD standard.

Prepare the report daily basis and reporting to manager as well as client.

BE – Electrical and Electronics Engineering - Mohamed Sathak A.J. Engineering College, Anna University, Tamil Nadu in 2013

MS OFFICE MS WORD MS EXCEL POWER POINT AUTO CAD

With a high degree of conceptual analytic skills.

Self-motivated and ability to work under pressure

Excellent written and oral communication skills

Excellent inter-personal skills and a good team player

Integrity, flexible, goal-oriented, optimistic, able to move with groups.

Date of Birth : 27th July 1992

Languages : English, Hindi and Tamil

Marital Status : Married

No. of Dependents : 3

Sex : Male

Nationality : Indian

Passport No. : L6974772 (28.01.2024)

Present Address : Building No.63, Jadeed, Doha, Qatar

Permanent Address : 2/224, Rahmaniya street, Ayyappadi, Nagappattinam, Tamilnadu, India-609303 I honestly declare that above mentioned details are true to the best of my knowledge and if given an Opportunity will prove my dedicated & committed performances in the assigned areas of Profile.

(K.M. Mannan Mohamed Aslam)

KEY STRENGTHS

COMPUTER SKILLS

ROLE OF MAINTENANCE AND SERVICE



Contact this candidate