TAMILSELVAN
Mobile: 900-***-****, E-Mail: adnmlk@r.postjobfree.com
https://www.linkedin.com/in/tamilselvan-maruthi-30689288
To seek to work in a professional environment where I can exercise my goals, tend to excel and innovate
by channeling my interpersonal and professional skills towards the excellence of the organization.
PROFILESUMMARY
Experience in 2+ years in Planning and Mining Engineering in Underground Tunneling and 3+ years in
designing, planning and constructing residential buildings respectively and by successful
implementation of technical solutions.
Exhibit excellence in speed and quality during creation & execution of project plans in turn maximizing
the profits and operational results.
Possess Comprehensive knowledge of Architectural design using AUTOCAD Software with IRC
Standards and Structural design with Building Codes, Specifications & Regulations.
Technically performed in Underground Tunneling with both execution and planning departmental wise
along in the best quality in nature.
Skilled in performing overall orientation of the Architectural and structural design for residential
buildings.
Highly capable in training & supervision of the employees.
Displayed successful conflict resolution among the employee, contractor and sub contractors.
CORECOMPETENCIES
Planning Engineering Architectural Design Construction
Management
Mining Engineering Structural Design Layout & Design
WORKEXPERIENCE
NIRMAN VRIDHI INFRA PVT LTD, Chennai Jan19 to till
Nirman Vridhi is a construction services provider in the growing infrastructure space in India. Started
in the year 2011, the flagship project of the company was to design and build the complete civil and
hydro-mechanical works for the 97 Tashiding Hydropower Project. Over the years, it has extended its
growth into Metro projects completing numerous underground works in Delhi, Chennai and Mumbai
Metro.
Scope of Responsibilities:
Planning and billing work done in the executed site.
As a Civil Engineer monitoring the work processed in the site and executed in technical manner as well
as client prospects.
Supervise the Construction work process and ensure seamless execution.
Communicate to the clients and labors on the design and structural processes.
Walk through the designs with labors and coordinate with them for execution.
Analyze the structural work completed in the site and refine the design appropriately.
Supervise the procurement, consumption and storage of materials by contractors and subcontractors
involved in the projects.
Project Involved:
Under Ground Metro Tunneling work in Mumbai near colaba. Metro Railway tunneling work started in
Mumbai connecting from Mumbai colaba to Bandra seepz for this phase 1 sated between the area
Cuffe parade-Vidhan bhawan-Church gate-Hutatma chowk and CST stations for around 65000 crores
project taken by L&T,STEC.
In Cuffe Parade Station two Stabilizing underground tunnel upline tunnel and Downline tunnel both are
200 mtrs respectively.
Both the tunnels are executed in NATM method (NEW AUSTRIAN TUNNELING METHOD) with primary
and secondary lining also carried out in those tunnel.
In hutatma chowk 232 mtrs tunnel in that around 143 mtrs was executed by NATM method and the
remaining length covered by TBM machine.
In Church Gate, above surface shaft area has been cleared by blasting and excavation work carried in
the station area.
Accomplishments:
In Cuffe Parade both Upline and Downline tunnel are initially Excavated by NATM method carried out
Underground blasting with proper team work and well experienced technical members were worked
in the tunnel. In the Excavation work as a civil engineer I have to lead the team for everyday
progression and as well as complete safety given out to the both workers and to working area. Since its
an underground blasting but the vibrations and noise nuisance also have consider in that moment
because the work is located in the main ruling city.
It takes one and half year to complete the excavation with complete supporting works has been done.
Once the Excavation completed next through the lining work for both the tunnels.
Primary and secondary lining works are well planned and carried out safetly in both tunnels.
For secondary lining Concrete 6mts Temporary movable structure was used in both the tunnel and it
was concrted by Invert for bottom concrete and Overt for Top level concrete was Completed for 400
mtrs
After completed both the tunnels there was air passage for 8 mtrs is connecting in between those at
the end of the tunnel.
The Air passage area was well excavated and completed upto the Secondary lining level.
The projects I had involved in were completed successfully on the agreed time line with seamless
execution and promised quality.
In Hutatma Chowk we only done Excavation work for around one year because of the time lapse and
the area was located in monumental historical place so we dont have the permission for further
carried NATM method in the tunnel.
For 143 mtrs well Excavated by NATM method simply done by proper planned and executed in
complete satisfaction of the client.
In Church Gate station we worked only in Shaft area that means excavated the surface area by open
blasting and it completed in two months.
All the works are well planned and analyzed well and executed in proper manner importantly well
maintained relation between the clients as well as the sub contractors.
SABARI CONSTRUCTIONS PVT LTD, Chennai May14 to Dec17
Sabari Constructions is a well established construction company in Chennai for around two decades.
They are involved in Architectural and structural design, construction of variety of buildings and all
construction related makeovers. They provide an ideal platform to be involved in all the phases of the
construction and diverse spheres of architecture like residential, industrial buildings.
Scope of Responsibilities:
Survey the area of excavation for project installation.
Draft structural drawings and architectural drawings for residential buildings and industries.
Produce designs from the Excavation view to the structured view for Residential buildings.
Supervise the Construction work process and ensure seamless execution.
Communicate to the clients and labors on the design and structural processes.
Walk through the designs with labors and coordinate with them for execution.
Analyze the structural work completed in the site and refine the design appropriately.
Supervise the procurement, consumption and storage of materials by contractors and subcontractors
involved in the projects.
Projects Involved:
Renovation of 7580sqft mechanical laboratory
l in Mepz Tambaram.. I was involved from the basic
design phase to the complete execution of the project. I had drafted the approved design for the
project.
Execution of 2300sqft G+4 Residential building in oldwashermenpet. I had ad drafted the design from
the foundation level to the elevation level. I was actively involved in the supervision of the
construction site.
Renovation of Apartment in Anna nagar. The previous architectural structure of the apartment was
flawed. I had provided
vided a comprehensive analysis of the structure and redesigned the entire structure. I
was involved in the supervision of the construction materials management.
Construction of industrial building for Shamojit industries in Pune. I was actively involved in the
drafting of Architectural and structural drawings from the basic structural level.
Draft of entire architectural design for 6750sqft office building in Pune for Shamojit industries
industries. I had
effectively contributed towards the complex overall design and drafting of structural drawings.
I was involved in the Design of 1000 sqft of Structural Truss for Royal marbles in Bangalore
Bangalore.
Accomplishments:
The design I had drafted for G+4 residential building in oldwashermenpet was critically acclaimed by
my supervisors
upervisors to be at par with designs drafted by experienced professionals. I was also appreciated
for my supervision role and was considered effective in multi tasking. I consider this as a professional
accomplishment owing to my strong foundation skills aand leadership capabilities.
The comprehensive analysis of the flawed structure and redesign of the entire structure during
renovation of apartment in Anna Nagar was appreciated by my supervisor for the exhibition of the
technical skills.
The projects I had involved in were completed successfully on the agreed time line with seamless
execution and promised quality.
REAL VALUE PVT LTD, Chennai Sep13to Dec13
As Intern
Real Value Promoters Private Limited is one of Chennais most respected and diversified Private
Property Developer that owns and manages a premium property portfolio of residential apartments,
condominiums, retail malls and office spaces.
Project Involved:
Due to the limited time period of internship, I was involved in a construction
construction project in Padur. I was
exposed to diverse practices involved in excavation.
I was also provided with the hands on experience in concrete cubes and a platform to interact with
different professionals.
SOFTWARESKILLS&CERTIFICATIONS
AUTOCAD-Advanced level with A-Grade
Grade of certification
STADD PRO Intermediate
Intermediate level with A
A-Grade of certification
MS OFFICE SUITE
EDUCATIONSUMMARY
B.E. Civil Engineering from Anna University in 2014.
Obtained first class division with 7.6 CGPA
PERSONAL SUMMARY
DATE OF BIRTH : 27 JANUARY 1992
LANGUAGES : Tamil, English, Mandarin