Michael Michael, CCM. QSP. CPSI. LEED AP. (BD+C)
Seal Beach, CA
adnm3m@r.postjobfree.com
Education: B.Sc. in Civil Engineering May 2001.
Licenses:
•Contractors' State License Board CSLB # 1026252 Classes A, B & C-10
•Certified Construction Manager CCM # 8650.
•Certified Safety Playground Inspector. CPSI # 21082.
•Project Management Professional PMP.
•Certified LEED AP (BD+C).
•QSP, Qualified SWPPP Practitioner.
•CASp - ADA Compliances Certificate.
•State of CA Notary Public. COMM #2355621.
•Enrolled in online JD Program with Northwestern California University School of Law.
Experience:
A- RenewAge Energy Solutions:
Position: Senior Construction Manager/ Chief Estimator (02/20 – Present)
1.Julianna Park. Anaheim, CA. (850k).
2.LACCD Improvements and Classrooms upgrades. (1.4M).
3.Multiple EV Commercial Projects.
B- GKK/ Cannon Design:
Position: Projects Construction Manager (12/2017 – 02/2020)
1- Project: New Admin. Bldg. for West Hills College. Coalinga, CA, ($ 15M)
2- Bakersfield College GYM and Field House "GMP". Bakersfield, CA ($ 54M)
3- ADA Campus Wide Barrier Removal. Santa Clarita, CA ($ 3.8M).
C- AEC Development Inc.
Position: Part Time Projects Estimator & Schedular (01/2015 - 01/2017)
1- Project: AGIA Pharmacy & Cafe (Design Built contract)
Location: Tehachapi, CA.
Budget: $4,700,0000.
2- 48 Units Multi-unit building apartments. (Design Built contract)
Location: Riverside, CA.
Budget: $36,000,000.
3- Rowland HS Classrooms Additions
Location: Rowland Heights, CA
Budget: $44,600,000.
D- Hellas Construction Inc.
Position: Projects Operation Manager (01/2015 - 01/2017)
1- Heritage Soccer & Baseball Field renovations. (Puyallup, WA). Budget: 6.4M
2- Bell Harden soccer field improvements. (Bell Garden, CA). Budget: 1.7M.
3- Folsom USD Soccer Field & Track replacement. (Folsom, CA). Budget: 2.2M.
4- Cleveland HS New Soccer field & Track. (Seattle, WA). Budget: $3.8M.
5- Tacoma USD New Baseball & Soccer field. (Tacoma, WA). Budget: $3.2M.
E- Aghapy Construction, Inc.
Projects Manager/ Senior Estimator (08/2010 - 01/2015)
1- Santa Monica Pier Rehabilitation. (Santa Monica, CA). $6,970,000.
2- Pasadena Rec. Park Renovations. (Pasadena, CA). $7,800,000
3- Stanton Park Playground Installation. (Stanton, CA). $1,988,000
4-Mason regional Park (Irvine, CA). $8,850,000
5-Raymond Arbor Park playground replacements (Signal Hill, CA). $3,786,000.
6-CDC N. Classroom Expansion (Antelope Valley Joint Union HSD). $5,595,000.
7-Whittier OFF Leash Dog Park (Whittier, CA). $9,100,000.
8-Holly-dale Regional Park (South Gate, CA). $5,400,000.
9-Phelan Pinion Hill park Expansion (Phelan, CA). $8,895,000.
10-Rosamond Playground Upgrades (Rosamond, CA). $2,210,000.
11-Hamilton Clinic Phase II (Long Beach USD). $25,400,000.
12-Wasco State Prison Clinic Renovation & Upgrades. $19,12,000.
13-Kern Medical Records upgrades (Bakersfield, CA). $23,645,000.
14-Moon River Park Playground Improvements (Jurupa Valley, CA). $4,960,000.
15-Arrowhead Regional Medical Center Improvements $27,800,000.
16-Earlimart Clinic. (Earlimart, CA). $14,800,000.
F- Y&M Construction, Inc.
Project Manager/ Senior Estimator: (06/2009 - 08/2010)
1- San Antonio College Expansion (Walnut City, CA). ($4,800,000)
2- Lincoln Middle School New Modular Classroom Expansion (Santa Monica USD, CA). ($3,650,000)
3- Decker Elementary School (Pomona USD, CA). (8,850,000)
Position Duties:
Supervising & Managing various site activities which included:
■HV. Main Switch Gear and Distribution Panelboards.
■Underground Electric PVC. Pipes and Concrete Encasement.
■Transformer Units, Circuit Breakers and Electric Panels.
■EMT Conduits & Junction Boxes.
■New Light Fixtures.
■Pulling of high and low voltage cables.
■TV. Distribution System.
■PA & Data Work.
■Coordinating the Work with Edison & Local agencies.
■FA, grounding, and testing
■Site Flatwork (AC & Concrete works).
■ADA Compliances.
■Site infrastructure (wet & dry utilities).
■Testing & Punch List.
■Project handing over.
■“TIA” Time Impact Analysis.
■
G- SSC Construction:
Position: Project Manager: (04/ 2007 - 06/2009)
Project: Henry C. Garnett Water Treatment Plant Purification Location: Bakersfield, CA
Project budget = $95,000,000
Position Duties:
Supervising, managing & preparing the following:
Material, Resources Control & Tracking.
Rebar Detailing & On Screen Take off.
Massive earthwork, over-excavation, backfilling & compaction.
Heavy Civil, Asphalt & concrete work.
Managing subcontractors and vendors.
Coordinating submittals with various design consultants.
Generating RFI's & Change Orders.
Maintaining Cal OSHA Safety Compliance Standards.
Preparing Shop Drawings & Details.
Concrete & Steel Structures Erection & Supervision.
HV & LV. Electrical eqpt.
Dewatering & GWT Level Monitoring.
Site infrastructure (west & dry utilities).
SWPPP Monitoring & Implementations.
Testing and videotaping.
Preparing of Potential Claims and Change orders.
Delay Time impact analysis.
Evaluating Cost Overruns.
Subcontractors & vendors Claims analysis & evaluation.
Contractual Risk Identification and Mitigation.
Reviewing baseline, weekly and monthly progress construction schedule, evaluating delays, and preparing schedule review reports.
Monitor & Improve labor productivity rates.
“TIA” Time Impact Analysis.
H- Minco Construction Inc dba Minako Corp.
Position: Projects Engineer/ Estimator: (10/ 2004 - 04/2007)
1- Dec.2006 - April 2008.
Project: Cerritos Infrastructure & Central Plant Bldg. Location: City of Norwalk, CA.
Budget = $26,000,000.
2- Feb. 2006 - Nov. 2006.
Project: Costa Mesa community college new classrooms addition. Location: City of Costa Mesa, CA.
Budget = $6,700,000.
3- May. 2005 - Feb. 2006.
Project: Santa Monica College Parking Lots Improvements Location: Santa Monica, CA. Project Budget = $5,500,000.
4- Oct. 2004 - May. 2005.
Project: Valley High School Improvements.
Location: Santa Ana, CA.
Budget = $4,400,000
Estimator Position Duties:
-Bid Documentations and administration DBE, SBE and Minority compliances.
-Obtaining bid bonds.
-Preparing of a complete Take off and Cost estimates based on project plans, specs. and addendums if applicable.
-Preparing of bid tabulation spreadsheets.
-Negotiate prices with Vendors and Subcontractors.
-Coordinating submittals with the architect and engineering consultants after receiving the NTP.
-Generating as needed Pre-bid Request for Clarifications.
-Preparing bid Pre-qualification packages.
-Preparation of Procurements Plan upon receiving of the NTP.
-Complete understanding of recent project labors ‘agreements "PLA", “Davis Bacon” and/ or “PW” rates and classifications.
I- John Labib & Assoc.
Position: Design Engineer (March 2003 - Oct. 2004)
1- Design Engineer Using Etabts, Sap2000.
2- Drafting Using Cad's Programs.
J- Arab Contractors Co.:
Position: Project Engineer (May 2001 - March 2003)
1- Complex of King Fahd schools.
2- Complex of head offices of Cairo Bank.
3- Relocation of Military Factories.
4- International Medical Center.
K- Computer Programs & Certificates:
-Cad's (Autodesk certified 2007).
-SAP 2000.
-Etabs.
-MS OFFICE.
-Primavera (P3, P5, P6).
-Sure-Trak.
-Prolog.
-MS Project.
-Timberline (Estimating Software)
- CESSWI
-Plan-swift (Estimating Software)
-CPR.
-Procore.
-Gordian.